Policy Replication

Ltr/EPA/F. Marcinowski to DOE/I. Triay, transmitting report for inspection no. EPA-LANL-8.02-22 [A-98-49-II-A1-38]

Docket document2022-10-31 · EPA · report · EPA-HQ-OAR-2004-0430-0180
RIN 2060-AG85 · Docket EPA-HQ-OAR-2004-0430

Other documents for the same rulemaking (all, by stage)

Docket documentWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening of Public Comment Period
1996-11-15 Federal RegisterDecision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria
1997-10-30 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision
1998-05-18 Federal RegisterCriteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-05-21 Federal RegisterOpportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-06-24 Federal RegisterQuality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-03-25 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterChange in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant
1999-05-13 Federal RegisterInspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant
1999-05-17 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-10-18 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-12-08 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2000-04-14 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2000-08-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2000-11-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-04-05 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2001-07-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant
2002-02-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant
2002-03-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant
2002-05-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)
2005-08-29 Docket documentDraft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]
2005-11-03 Docket documentFinal Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]
2006-07-24 Docket documentTechnical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities
2006-07-24 Docket documentTechnical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review
2006-07-24 Docket documentTechnical Support Document for 194.27: Salado Flow Conceptual Models Peer Review
2006-07-24 Docket documentTechnical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment
2006-07-24 Docket documentTechnical Support Document for Section 194.27: Spallings Conceptual Model Peer Review
2006-07-24 Docket documentTechnical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review
2006-07-24 Docket documentTechnical Support Document for Section 194.14: Evaluation of Karst at the WIPP Site
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation
2006-07-25 Docket documentComparison of Effects of Brine Pocket Size
2006-07-25 Docket documentPlutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)
2006-07-25 Docket documentSensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)
2006-07-25 Docket documentSalado Flow Peer Review Plan
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report
2006-07-25 Docket documentII-G-22: Conceptual Models Third Supplementary Peer Review Report
2006-07-25 Docket documentII-G-12: Conceptual Models Supplementary Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report
2006-07-25 Docket documentSpallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow
2006-07-25 Docket documentWaste Isolation Pilot Plant: Conceptual Models Peer Review Report
2006-07-25 Docket documentQuality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]
2006-07-25 Docket documentEvaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)
2006-07-25 Docket documentAnalysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Peer Review Plan
2006-07-25 Docket documentIndividual Radiation Doses From Transuranic Waste Brought To The Surface By Human Intrusion At The WIPP [DOE/AL/58309-66] (EEG-66)
2006-07-25 Docket documentPEER 1-Conceptual Models Peer Review (CMPR)
2006-07-25 Docket documentEvaluation of the WIPP Project's Compliance with the EPA Radiation Protection Standards for Disposal of Transuranic Waste [DOE/AL/58309-68] (EEG-68)
2006-07-25 Docket documentInternational Peer Review of the 1996 Performance Assessment of the US Waste Isolation Pilot Plant (WIPP)

References: 4 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
LANL's QA Plan states that line management is responsible for achieving and verifying quality, whereas NQA Element 1 requires that organizations verifying quality be independent of those organizations responsible for achieving quality. The EPA will verify that this finding has been corrected during its next inspection of LANL's QA Program. Los Alamos National Laboratory, located within the town of Los Alamos approximately 35 miles northwest of Santa Fe, occupies 43. square miles of land in Northern New Mexico. Owned by the Department of Energy, Los Alamos has been managed by the University of California since 1943, when the Laboratory was born as part ofthe Manhattan Project to create the first atomic weapons during World War II. This EPA inspection report will be made available to the public through the Agency's public dockets.
research reportNot linked to a paper · refsec
NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The Agency verified that DOE established these NQA standards in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the WIPP. The QAPD is the documented QA Plan for the WIPP project, as a whole, to establish the NQA standards. The QAPD is maintained by the QA Organization of DOE's Carlsbad Field Office (CBFO), which has the authority to audit all other organizations associated with TRU-waste disposal at the WIPP to ensure that their lower-tier QA Programs establish and implement the applicable requirements ofthe QAPD. The DOE generator sites, which characterize waste for disposal in the WIPP, must have site-specific QA Plans that establish the applicable NQA requirements. The EPA annually audits DOE's QA Program at CBFO (reference EPA Air Docket No. A-93-02, Document Nos. II-A-43 and IV-A-4, and EPA Air Docket No. A-98-49, Document No. II-A-1-4) and has found that DOE properly adheres to a QA Program that implements the NQA standards. The Agency determined in its WIPP Certification Decision (63 FR 27354, May 18, 1998) that the
research reportNot linked to a paper · refsec
Program, while in an inspection, the Agency also performs some oversight of DOE's quality assurance checks of a QA Program. The table below presents a summary of EPA inspections todate of LANL's QA Program. Table 1: Summary of EPA Ins lections of LANL's QA Program Activity Date Purpose Inspection August 1997 Inspection of QA program for conformance with 40 CFR 194.22(a). Inspection
datasetNot linked to a paper · refsec
PURPOSE AND SCOPE Section 194.22(a)(1) requires that LANL establish and implement the requirements ofthe following Nuclear Quality Assurance standards: 1) ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The purpose ofthe EPA inspection was to verify the continued establishment and implementation ofthe above standards by LANL's QA Program in accordance with § 194.22(e). Section 194.22(a)(2) requires that WIPP organizations properly execute their NQA Programs to oversee all items and activities that are important to the containment of TRU-waste. LANL performs waste characterization activities that are important to the containment of TRU-waste.
research reportNot linked to a paper · refsec