EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA or Agency) conducted an inspection on February 4-8, 2002 of a Department of Energy (DOE) audit ofthe Rocky Flats Environmental Technology Site (RFETS) quality assurance (QA) program for the Waste Isolation Pilot Plant (WIPP). The investigation ofthe activities selected for the inspection and audit samples showed that RFETS has continued to properly maintain its QA Program.
WIPP. One DOE CAR associated with software control was of particular interest to the Agency; therefore, the Agency performed a follow-up inspection ofthe software control activities on March 26 and 27, 2002. The follow-up inspection verified that RFETS had taken significant measures in conecting the software control issues noted on the DOE CAR. (See attachment 5 for report on follow-up inspection.)
EPA assumes all responsibilities associated with assessing a QA Program, while in an inspection, the Agency also performs oversight of DOE's audit of a QA program. EPA has conducted no audits and eight inspections. The table below presents a summary of EPA inspections conducted of RFETS's QA Program. Summary of Inspections of Rocky Flats Environmental Technology Site QA Program Activity Date Purpose Inspection June 22-25, 1998 Initial inspection of DOE Audit A-9826 of QA program for RFETS TWCP. Also reviewed records of DOE Audits A-97-03, A-98-04, and A-98-06 of
RFETS TWCP QA program. Inspection March 2-4, 1999 Inspection of DOE Audit' A-99-07 for maintenance of WIPP support QA program Inspection March 24, 1999 Follow-up to A-99-07: inspect DOE Audit A-99-13, which assessed Canberra's software quality assurance program Inspection April 28, 1999 Follow-up to A-99-07: inspect DOE Audit A-99-16, which assessed TRU waste characterization of LECO crucible Inspection
Activities, February 4 to February 8, 2002," including audit schedule, audit notification, audit plan, and audit checklist.
DOE Carlsbad Field Office. Audit Summary Report ofthe Rocky Flats Environmental Technology Site, Golden, Colorado, Audit Number A-02-07, Audit Report of Waste Characterization Activities Recertification Audit, February 4 to February 8, 2002. Received via e-mail on February 14, 2002. Rocky Flats Environmental Technology Site. Transuranic (TRU) Waste Management
Manual, 1-MAN-008-WM-001, Rev. 4, Section 4.6, Packaging Quality Assurance Program Plan, April 30, 2001. Rocky Flats Environmental Technology Site. Organization chart: RFETS Organizational
Charts, November 1, 2001. Rocky Flats Environmental Technology Site. Organization chart: Kaiser-Hill
Organization, October 22, 2001.
EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA or Agency) conducted an inspection from July 911,2002 of an audit by the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) ofthe Westinghouse TRU Solutions (WTS or Site) Quality Assurance (QA) program. The investigation of the activities selected for the EPA and DOE audit samples showed that WTS has properly maintained its QA Program since the previous inspection conducted on May 7-11, 2001.
WTS is the DOE's performance-based management and operating (M&O) contractor at the WIPP. As such, WTS's responsibilities include the day-to-day management, operations, and maintenance ofthe WIPP. The EPA requires that WTS maintain a QA Program to provide on-site surveillance of items and activities that are important to the containment ofTRU wastes within the WIPP. In August 1997, the EPA initially determined that the WTS QA Program was properly executed. On February 17-19,1998, February 9-11,1999, June 30,1999, August 7-8,2000, and on May 7-11, 2001, the EPA determined that the WTS QA Program had been properly maintained since the initial approval. The purpose of this inspection on July 9-11, 2002, was to determine whether the WTS
CFR 194.22(a)(1) includes, by reference, the requirements of ASME NQA-1-1989 edition, ASME
NQA-2a-1990 addenda, part 2.7 to ASME NQA-2-1989 edition, and ASME NQA-3-1989 edition (excluding Section 2.1 (b) and (c), and Section 17.1). P.40
ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-21989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The purpose ofthe EPA inspection was to confirm the continued compliance ofthe WTS
CBFO. Audit Checklists for A-02-25. CBFO. "Executive Summary for A-02-25," presented after the audit on July 15, 2002. (See attachment 3 of this inspection report.)
EXECUTIVE SUMMARY In June 25-27, 2002, the EPA conducted an inspection of a DOE audit ofthe Hanford Site's QA Program for the WIPP. The investigation ofthe activities selected for the EPA inspection and
BACKGROUND Regulatory Background In January 2000, the Environmental Protection Agency (EPA) determined the Hanford Site's compliance with requirements for site-specific Quality Assurance (QA) programs. EPA reviewed and checked implementation of Hanford's QA Plan, as required under §194.8(a)(l) &(2). In accordance with § 194.8(a)(3), EPA provided its written decision finding that the Hanford QA Program complied with the requisite QA requirements for a Transuranic (TRU) waste generator site. Subsequent to the determination of compliance, EPA conducted three inspections in accordance with §194.8(a)(4) to confirm continued compliance ofthe Hanford QA program. This report documents the Agency's third inspection to confirm continued compliance ofthe Hanford QA program. At § 194.22(a)(1), EPA requires the Department of Energy (DOE) to adhere to a QA program that establishes and implements the requirements ofthe following Nuclear Quality Assurance (NQA) standards: 1) ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME
NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). EPA verified that DOE established these requirements in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the Waste Isolation Pilot Plant (WIPP). The QAPD is the documented QA Plan for the WIPP project, as a whole, to establish the NQA standards. The QAPD is issued by the QA Organization of DOE's Carlsbad Field Office (CBFO), which has the authority to audit all other organizations associated with TRU waste disposal at the WIPP to ensure that their lower-tier QA programs establish and implement the applicable requirements ofthe QAPD. The DOE generator sites, which will characterize TRU waste for disposal in the WIPP, must prepare site-specific QA Plans that establish the applicable QAPD requirements.
DOE audit. The table below presents a summary of EPA inspection and audit activities conducted ofthe Hanford's QA Program to date. Summary of EPA Inspections and Audit Activities at the Hanford Site Activity Date Purpose January 24-28, 2000 Inspection and independent assessment of initial CBFO Certification Audit A-00-05 of QA program for conformance with 40
CFR 194.8(a) January 16,2001 Inspection and independent assessment of CBFO Surveillance S-01-04 for maintenance of QA program for conformance with 40
CFR 194.8(a) Inspection June 12-15, 2001 Inspection of CBFO Audit A-O I-03 and A-O 1-16 of QA program maintenance. Inspection June 25-27, 2002 Inspection of CBFO Audit A-02-23
DOE CBFO. Lead Auditor Maintenance of Proficiency Record for Pete Rodriguez. Auditor Technical Specialist Qualifications for Patrick Kelly. Resume for Patrick T. Kelly. Auditor/Technical Specialist Qualifications for Karen Gaydosh. Section 5.0 of Hanford Site Transuranic Waste Certification Plan, HNF-2600, Revision 5, April .11, 2001. Section 5.0 of Hanford Site Transuranic Waste Certification Plan, HNF-2600, Revision 6, May 17, 2002