Ltr/DOE/I. Triay to EPA/F. Marcinowski, transmitting additional information requested regarding the annual WIPP change report [A-98-49-II-B2-12]
Other documents for the same rulemaking (all, by stage)
References: 87 extracted, 0 linked to papers
Christensen, CL. and Peterson, E.W., The Bell Canyon Test Summary Report, SAND 80-1375, April 1981
SAND 81-2195, February 1983 DOE, see U.S. Department of Energy.
Gulick, C.W., 1979, Borehole Plugging Program Plugging of ERDA No. 10 Drill Hole, SAND 79-0789
AL.6-99/WP/WIP:R4507.DOC 778434.01 6/7/99 11:18 AM P.45 U.S. Department of Energy (DOE), 1996, United States Department of Energy Waste Isolation Pilot Plant Compliance Certification Application, DOE/CAO-1996-2184, U.S. Department of
Energy, Carlsbad Area Office, Carlsbad, New Mexico. U.S. Department of Energy (DOE) 1980, Final Environmental Impact Statement Waste Isolation Pilot Plant, DOE/EIS-0026, U.S. Department of Energy Assistant Secretary For Defense
OAR Box 1694 Prepped by Abdul Stroman Document Number: 25)II-B2-12ITEM#4 Docket Number: A-98-49 Printed 10/1/2008 2:58:54 PM Sheet 25 of 25
DOE/WIPP-01-3177 Volume 1 Geotechnical Analysis Report July 1999-June 2000 September 2001 J l l - 5 200_r Ei-Y.. .mOCV'ET
Springfield, VA 22161 99-00 GAR FOREWORD AND ACKNOWLEDGMENTS This report contains an assessment of the geotechnical status of the Waste Isolation Pilot Plant (WIPP). During the excavation of the principal underground access and experimental areas, the status was reported quarterly. Since 1987, when the initial construction phase was completed, reports have been published annually. This report presents and analyzes data collected from July 1, 1999, to June 30, 2000. This Geotechnical Analysis Report was written to meet the needs of several audiences. This report satisfies the requirements presented in the WIPP Hazardous Waste Permit1 and the certificate of compliance with 40 CFR 191 and 194. It focuses on the geotechnical performance of the various components of the underground facility, including the shafts, shaft stations, access drifts, and waste disposal areas. The results of investigations of excavation effects and other geologic studies are also included. The report compares the geotechnical performance of the repository to the design criteria. It describes the techniques that were used to acquire the data and the performance history of the instruments. The depth and breadth of the evaluation of the different components of the underground facility vary according to the types and quantities of data available and the complexity of the recorded geotechnical responses. Graphic documentation of data and tabular documentation of instrument history can be provided upon request.
DOE, see U.S. Department of Energy. Holcomb, D.J., 1997, Memorandum to J.R. Tillerson dated September 29, 1997, "Summary of Air Intake Shaft Measurements (October 1, 1996-September 30,1997), WBS 1.1.03.6.1; Completion of Milestone RM103, Summary Memo of FY97 AIS Measurements," Sandia National Laboratories, Albuquerque, New Mexico.
Holt, R.M., and D.W. Powers, 1990, "Geologic Mapping ofthe Air Intake Shaft at the Waste Isolation Pilot Plant," DOEAVIPP 90-051, Waste Isolation Pilot Plant, Carlsbad, New Mexico.
Holt, R.M., and D.W. Powers, 1984, "Geotechnical Activities in the Waste Handling Shaft, Waste Isolation Pilot Plant (WIPP) Project, Southeastern New Mexico," WTSD-TME 038, Waste Isolation Pilot Plant, Carlsbad, New Mexico.
Intera, 1997, "Exhaust Shaft Hydraulic Assessment Data Report," DOEAVIPP 97-2219, prepared for Westinghouse Waste Isolation Division by Intera, Albuquerque, New Mexico. International Technology Corporation (IT), 1997, "Composition and Origin of Nonindigenous Brine and Water in the Vicinity ofthe Exhaust Shaft, Waste Isolation Pilot Plant, New Mexico,"
Munson, D.E., D.L. Hoag, J.R. Ball, G.T. Baird, and R.L. Jones, 1995, "AIS Performance Tests, (Shaft V): Insitu Data Report (Mayl 988-July 1995)," SAND94-1311, Sandia National
Laboratories, Albuquerque, New Mexico. New Mexico Environment Department (NMED), 1999, "Waste Isolation Pilot Plant Hazardous Waste Facility Permit," NM4890139088-TSDF, Santa Fe, New Mexico.
Powers, D.W., and R.M. Holt, 1993, "The Upper Cenozoic Gatuiia Formation of Southeastern New Mexico," New Mexico Geological Society Guidebook, 44th Field Conference, Carlsbad
Powers, D.W., and R.M. Holt, 1995, "Gatuiia Formation (Miocene to Pleistocene) Geology and Paleohydrology," prepared for Westinghouse Waste Isolation Division by International Technology Corporation, Albuquerque, New Mexico.
Powers, D.W., S.J. Lambert, S.E. Shaffer, L.R. Hill, and W.D. Weart, Eds., 1978, "Geological Characterization Report, Waste Isolation Pilot Plant (WIPP) Site, Southeastern New Mexico," Vols. I and II, SAND 78-1596; Sandia National Laboratories, Albuquerque, New Mexico. U.S. Department of Energy (DOE), 2000a, "Brine Generation Study," DOE-WIPP 00-2000, Waste Isolation Pilot Plant, Carlsbad, New Mexico. U.S. Department of Energy (DOE), 2000b, "Exhaust Shaft Phase III Hydraulic Assessment Data
Report, October 1997 - October 1998," DOE-WIPP 99-2302, Waste Isolation Pilot Plant,
Carlsbad, New Mexico. U.S. Department of Energy (DOE), 1997a, "Exhaust Shaft Hydraulic Assessment Data Report"
DOE-WIPP 97-2219, Waste Isolation Pilot Plant, Carlsbad, New Mexico. U.S. Department of Energy (DOE), 1997b, "Exhaust Shaft,: Phase 2 Hydraulic Assessment Data Report Involving Drilling, Installation, Water-Quality Sampling and Testing of Piezometers 112," DOE-WIPP 97-2278, Waste Isolation Pilot Plant, Carlsbad, New Mexico. U.S. Department of Energy (DOE), 1996, "Title 40 CFR § 191, Compliance Certification Application for the Waste Isolation Pilot Plant," DOE/CAO-1996-2184, Carlsbad, New Mexico. U.S. Department of Energy (DOE), 1991, "Waste Isolation Pilot Plant Supplementary Roof Support System, Underground Storage Area, Panel 1, Room 1," DOEAVIPP 91-057, Waste Isolation Pilot Plant, Carlsbad, New Mexico. U.S. Department of Energy (DOE), 1986a, "Interim Geotechnical Field Data Report," DOEWIPP-86-012, Waste Isolation Pilot Plant, Carlsbad, New Mexico. U.S. Department of Energy (DOE), 1986b, "Waste Isolation Pilot Plant Design Validation Final Report," DOE-WIPP-86-010; Prepared by Bechtel National, Inc., for the U.S. Department of
Energy, San Francisco, California. U.S. Department of Energy (DOE), 1986c, "Geotechnical Activities in the Exhaust Shaft," DOEWIPP 86-008, Waste Isolation Pilot Plant, Carlsbad, New Mexico. U.S. Department of Energy (DOE), 1985, "Quarterly Geotechnical Field Data Report," DOEWIPP-221, Waste Isolation Pilot Plant, Carlsbad, New Mexico. 99-00 GAR 11-2 P.38 U.S. Department of Energy (DOE), 1984, "Design Criteria, Waste Isolation Pilot Plant (WIPP) Revised Mission Concept-ILA," WIPP-DOE-071; Waste Isolation Pilot Plant, Carlsbad, New Mexico. U.S. Department of Energy (DOE), 1983, "Summary ofthe Results ofthe Evaluation ofthe
Plant, Carlsbad, New Mexico. Westinghouse Waste Isolation Division (Westinghouse WID), 1999, "Long Term Ground Control Plan for the Waste Isolation Pilot Plant," WIPPAVID-96-2180, Rey. 3, Westinghouse Waste Isolation Division, Carlsbad, New Mexico. Westinghouse Waste Isolation Division (Westinghouse WID), 1997, "Exhaust Shaft Data Report: 72-Hour Pumping Test on C-2506 and 24-Hour Pumping Test on C-2505," Westinghouse Waste Isolation Division, Carlsbad, New Mexico.
Krieg, R.D., 1984, "Reference Stratigraphy and Rock Properties for the Waste Isolation Pilot Plant (WIPP) Project," SAND80-1331, Sandia National Laboratories, Albuquerque, New Mexico.
Powers, D.W., and B.W. Hassinger, 1985, "Synsedimentary Dissolution Pits in Halite ofthe Permian Salado Formation, Southeastern New Mexico," Journal of Sedimentary Petrology, Vol. 55, no. 5, p.769-773
Powers, D.W. and M.L. Martin, 1993, "A Selected Bibliography with Abstracts of Reports Related to Waste Isolation Pilot Plant Geotechnical Studies (1972-1990)," Sandia National Laboratories/New Mexico, Albuquerque, New Mexico. U.S. Department of Energy, 1990, "Geotechnical Field Data and Analysis Report," DOEAVIPP 90-006, Waste Isolation Pilot Plant, Carlsbad, New Mexico. U.S. Department of Energy, 1993, "Current Bases for Roof Fall Prediction at WIPP and a Preliminary Prediction for SPDV Room 2," DOEAVIPP 93-033, Waste Isolation Pilot Plant,
Carlsbad, New Mexico. 99-00 GAR 11-3 P.39 U.S. Department of Energy, 1993, "Geotechnical Field Data and Analysis Report, Volume I, July 1991-June 1992," DOE/WIPP 93-019, Waste Isolation Pilot Plant, Carlsbad, New Mexico. U.S. Department of Energy, 1995, "Geotechnical Analysis Report for July 1993-June 1994,"
DOE/WIPP 95-2100, Waste Isolation Pilot Plant, Carlsbad, New Mexico. U.S. Department of Energy, 1996, "Title 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant," DOE/CAO-1996-2184, U.S. Department of Energy, Waste Isolation Pilot Plant, Carlsbad Area Office, Carlsbad, New Mexico. 99-00 GAR 11-4
OAR Box 1703 Prepped by Keeia Richards Document Number: 18) II-B2-12 Docket Number: A-98-49 Printed 10/10/2008 9:55:22 AM Sheet 18 of 25
DOE/WIPP-01-3177 Volume 2 Geotechnical Analysis Report July 1999 - June 2000 Supporting Data r JUL = i M September 2000 SPAAIROOCKet
WASTE ISOLATION PILOT PUNT TnT- Waste Isolation Pilot Plant 1999-2000 GAR Supporting Data Document >••%
Area, and the Waste Disposal Area. The data are presented as both tables and plots in order to meet the needs of several audiences. This report presents the data collected through June 30, 2000. This data can be provided in its original format upon written request to the U.S. Departmentof Energy (DOE) at the following address: U.S. Department of Energy Carlsbad Field Office P.O. Box 3090
Carlsbad, NM 88221-3090 The Geotechnical Analysis Report is a multi-author report that was prepared by Westinghouse TRU Solutions for the DOE, Carlsbad Field Office, Carlsbad, New Mexico. Work was supported by tfrf> n o under Contract No. DE-AC04-01AL66444. f3?iC/QO*5i}AAq? 1999-2000 GAR Supporting Data Document Table of Contents List of Tables List of Figures Introduction
Classification, Standards of Accuracy, and General Specifications of Geodetic Control Surveys, Federal Geodetic Control Committee (now Federal Geodetic Control Subcommittee), [1975] 1980, Reprint. Interim FGCS Specifications and Procedures to Incorporate Electronic Digital/ Bar-Code Leveling Systems, Federal Geodetic Control Subcommittee, ver. 4.0, dated July 15,1994.
WIPP Subsidence Monument Leveling Surveys 1986-1997, DOE / WIPP 982293, June 1998.
WIPP Subsidence Monument Leveling Surveys 1998, DOE / WIPP 99-2293, October 1998.
WIPP Subsidence Monument Leveling Sutveys 1999, DOE / WIPP 00-2293, October 1999. P.46
DOE/WIPP 01-2293 1. Introduction Sections 2 through 7 of this report define the result ofthe 2000 leveling survey through the subsidence monuments at the WIPP site. Approximately 18 miles of leveling was completed through ten vertical control loops. The 2000 survey includes the determination of elevation on each ofthe 51 existing subsidence monuments and the WIPP baseline survey, and 14 ofthe National Geodetic Survey's (NGS) vertical control points. Digital leveling techniques were utilized to achieve better than Second Order Class II loop closures as outlined by the Federal Geodetic Control Subcommittee (FGCS). The field observations were completed during September and October of 2000 by personnel from the Waste Isolation Division (WID) Surveying Group, Technical Support Section, Engineering Department.
Finally, Section 8 contains Table F, which summarizes the elevations for all surveys from 1986 through 2000, inclusive. A detailed listing ofthe 1986 through 1997 surveys is contained in the report, WIPP Subsidence Monument Leveling Surveys 1986-1997, DOE/WIPP 98-2293. A reference to the summary reports for each year after 1997 is listed in the reference section of this document. 2. Equipment The observations were taken with the WILD NA3003 Electronic Digital Level (WIPP M&TE ID# DM0021) manufactured by Leica, and bar coded leveling staffs. The calibration for the NA3003 is valid from February 24, 2000, through February 24, 2002. The data were recorded electronically on the Leica GRM10
DIGILEV software (version 10.94d) from Leica Canada. The results, as summarized below, were extracted from the output ofthe DIGILEV software. 4. Methodology The weather conditions during the observations ofthe 2000 survey were generally mild with moderate temperatures and light to moderate breezes. The elevations for the 2000 survey are computed from the adjusted observations based on the elevation of the subsidence monument, S-37 (3,423.874 feet). S-37 is the WIPP monument that is furthest from the influence of the P.47
DOE/WIPP 01-2293 underground excavations, and has been held fixed for all ofthe subsidence leveling surveys since 1993. The condition ofthe individual monuments was substantially the same as the previous subsidence survey. No points were missing or significantly damaged. For visual reference, Figure 1 shows a graphic display ofthe individual loops, the total survey, and the relationship to the underground excavations. P.48
DOE/WIPP-99-2308, REV. 2 September 28, 2001 P.61 List of Figures Figure 1
WIPP Site, Delaware Basin, and Surrounding Area Figure 2 Past Drilling Rates for the Delaware Basin Figure 3 Intrusion Rate for 2001 Figure 4 Drilling Rates in Relationship to the Cost of Crude Oil Since 1980 Figure 5 Oil and Gas Wells Within the One-Mile Buffer Area of the WIPP Site Figure 6 Casing and Hole Sizes for New Wells Drilled in the Last Year in the New Mexico Portion of the Delaware Basin Figure 7 Typical Well Structure and General Stratigraphy Near the WIPP Site
Loving, Pecos, Reeves, Ward, and Winkler Counties in West Texas, and portions of Eddy and Lea Counties in southeastern New Mexico. In accordance with these criteria, the DOE used the historical rate of drilling for resources in the Delaware Basin to calculate a future drilling rate. In particular, in calculating the frequency of future deep drilling, 40 CFR 194.33(b)(3)(i) (EPA 1996) provided the following guidance to the
New Mexico Junior College, 1995, Analytical Study of an Inadvertent Intrusion ofthe WIPP
Site, Hobbs, New Mexico New Mexico Oil & Gas Engineering Committee, Inc., Monthly Injection & Saltwater Report for Southeast New Mexico, April 2000 The University of Texas, Petroleum Extension Service, Division of Continuing Education, 1986, Fundamentals of Petroleum, Third Edition The University of Texas, Petroleum Extension Service, Division of Continuing Education, 1991, A Dictionary for the Petroleum Industry, First Edition U.S. Department of Energy, DOE/WEPP-99-2308, Rev. 1, Delaware Basin Monitoring Annual
Report, September 2000 U.S. Department of Energy (DOE), 1996, Inadvertent Intrusion Borehole Permeability, Prepared by T.W. Thompson, W.E. Coons, J.L. Krumhansl, and F.D. Hansen U.S. Department of Energy, DOE/WJPP-97-2240, Injection Methods: Current Practices and Failure Rates in the Delaware Basin, June 1997 U.S. Department of Energy, DOE/CAO-1996-2184, Title 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant, October 1996 U.S. Environmental Protection Agency (EPA), 1996a. 40 CFR Part 194, Criteria for the Certification and Re-Certification ofthe Waste Isolation Pilot Plant's Compliance with the 40
CFR Part 191 Disposal Regulations U.S. Environmental Protection Agency (EPA), 1998. Docket No. A-93-02, EV-G-7, January 22, 1998, Current Drilling Practices Near WIPP, Ross Kirkes
ESRF-045 Waste Isolation Pilot Plant CY 2000 Site Environmental Report Ul ~5 f.Pi. '3
Acronyms, Abbreviations, and Symbols Appendix B Location Codes Appendix C Equations Appendix D Concentrations of Alpha and Beta Activities in Air Particulates Appendix E Air Sampling Data: Mass and Volume of Composite Air Samples Appendix F Time Trend Plots for Detectable Constituents Appendix G Air Sampling Data: Concentrations of Radionuclides Appendix H Authors and Contributors -xxni- - ; • * |!!fT I.I .IUH i i p p n y w n Waste Isolation Pilot Plant This page intentionally left blank. -xxiv- 2000 Site Environmental Report List of Tables Table 2.1 The Environmental Monitoring Plan outlines the sampling schedule for the WTPP Environmental Monitoring Program Table 3.1 Materials recycled at W P P in 2000 W P P ' s key RCRA permit deliverables and due dates Table 3.2 Table 3.3 Activities associated with major environmental regulations applicable to Table 3.4 the W P P project Table 3.5 Primary DOE orders affecting the W P P environmental program Table 4.1 Active environmental permits for the W P P (does not include RCRA permits) Activity (Bq) of quarterly composite air samples from effluent momtoring
Minimum, maximum and average radionuclide concentrations (Bq/m3) in air filter composites from stations surrounding the W P P site Table 4.4 Table 4.5 Table 4.6 Table 4.7 Results of duplicate composite air filter sampling Preliminary quarterly average radionuclide concentrations (Bq/m3) measured in air particulate samples by the Environmental Evaluation Group in 2000 Average annual radionuchde concentrations (Bq/L) in groundwater from wells at the W P P site Preliminary radionuclide concentrations (Bq/L) measured by EEG in groundwater Table 4.8 Table 4.9 Table 4.10 Table 4.11 Uranium concentrations (Bq/L) in surface water near the W P P site Americium and plutonium concentrations (Bq/L) in surface water near the W P P site Selected radionuchde concentrations (Bq/L) in surface water near the W P P site Results of duplicate surface water sample analysis -xxv- Waste Isolation Pilot Plant Table 4.12 Preliminary concentration (Bq/L) of radionuclides measured by EEG in surface water Table 4.13 Uranium concentrations (Bq/g) in soil near the WPP site Table 4.14 Americium and plutonium concentrations (Bq/g) in soil near the WPP site Table 4.15 Selected radionuclide concentrations (Bq/g) in soil near the WPP site Table 4.16 Results of duplicate soil sample analysis