Hanford Site Program Documents - Transuranic Waste Characterization Quality Assurance Project Plan (QAPjP), Rev. 9; and Transuranic Waste Certification Plan, Rev. 10 [A-98-49-II-A2-44]
Other documents for the same rulemaking (all, by stage)
References: 5 extracted, 0 linked to papers
ANSI/AIM BC 1-1995, Uniform Symbology Specification - Code 39. American National Standards Institute, Inc., 1430 Broadway, New York, NY 10018. P.22
ASME NQA-1, Ouality Assurance Program Requirements for Nuclear Facilities, 1989 Edition, New York, New York, American Society of Mechanical Engineers.
ASME NQA-2a-1990, Part 2.7, Addenda to NQA-2, Ouality Assurance Program Requirements of Computer Software for Nuclear Facility Applications, New York, New York, American Society of Mechanical Engineers.
DOE O 435.1, 1999, Radioactive Waste Management, Washington, D.C, U.S. Department of Energy.
QUALITY ASSURANCE PROJECT PLAN May 2, 2003 A spring retainer, similar to that illustrated in Figures Bl -4 and Bl-5, will be used with each coring tool when the physical propenies of the waste are such that the waste may fall out ofthe coring tool's liner during sampling activities. The spring retainer will be constructed of relatively inert material (e.g., stainless steel or Teflon™) and its inner diameter will not be less than the inner diameter of the liner. Before use, spring retainers shall be cleaned in accordance with the requirements in Section Bl -2b. Coring tools may have an air-lock mechanism that opens to allow air inside the liners to escape as the tool is pressed into the waste (e.g., ball check valve). If used, this air-lock mechanism will also close when the core is removed from the waste container. After disassembling the coring tool, a device (extruder) to forcefully extrude the liner from the coring tool, will be used if the liner does not slide freely. All surfaces of the extruder that may come into contact with the core will be cleaned in accordance with the requirements in Section Bl -2b before use. Coring tools shall be of sufficient length to hold the liner and shall be constructed to allow placement ofthe liner leading edge as close as possible to the coring tools leading edge.