Policy Replication

Open Charge Point Protocol (OCPP) 2.0.1, March 31, 2020, Open Charge Alliance

Docket document2023-02-28 · FHWA · report · FHWA-2022-0008-0404
RIN 2125-AG10 · Docket FHWA-2022-0008

Other documents for the same rulemaking (all, by stage)

2022-06-22 Federal RegisterNational Electric Vehicle Infrastructure Formula Program
2022-06-24 Regulatory impact analysisNational Electric Vehicle Infrastructure Preliminary Regulatory Impact Assessment of Notice of Proposed Rulemaking
2022-08-05 Docket documentJoint Office of Energy and Transportation - Overview of the Joint Office - Steve Lommele (June 28, 2022)
2022-08-05 Docket documentClean Cities Coalition Network - Overview of the National Electric Vehicle Infrastructure Program
2022-08-10 Docket documentU.S. Department of Energy - Vehicle Technologies Office and the Joint Office on Energy Transportation: Planned Publicly Accessible Electric Vehicle Charging Stations Briefing (July 15, 2022)
2022-08-10 Docket documentU.S. DOT/FHWA - Ex Parte Communication with National EV Charging initiative
2022-10-17 Docket documentFord Motor Company - Ex Parte Communication
2023-02-28 Federal RegisterNational Electric Vehicle Infrastructure Standards and Requirements
2023-02-28 Regulatory impact analysisNational Electric Vehicle Infrastructure Standards and Requirements - Final Rule Regulatory Impact Assessment - Draft February 14, 2023
2023-02-28 Docket documentISO-15118 Road Vehicles - Vehicle to grid communication interface (Parts 2 - Network and application protocol, 3 - Physical and data link layer requirements, and 20 - 2nd Generation network layer and application layer requirements), International Organization for Standardization
2023-02-28 Docket documentOpen Charge Point Interface 2.2.1, October 6, 2021, EVRoaming Foundation
2023-02-28 Docket documentSAE J1772 OCT2017, SAE Electric Vehicle and Plug in Hybrid Electric Vehicle Conductive Charge Coupler, SAE International
2023-02-28 Docket documentOpen Charge Point Protocol (OCPP) 1.6J, October 2015, Open Charge Alliance

References

Page 1Download these results: CSV · JSON
OCPP 2.0.1 - © Open Charge Alliance 2020 10/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 Generic Reference Description [ISO15118-1]
research reportNot linked to a paper · refsec
ISO 15118-1 specifies terms and definitions, general requirements and use cases as the basis for the other parts of ISO 15118. It provides a general overview and a common understanding of aspects influencing the charge process, payment and load leveling. https://webstore.iec.ch/ publication/9272 [ISO15118-2] Road vehicles – Vehicle to grid communication interface – Part 2: Technical protocol description and Open Systems Interconnection (OSI) layer requirements, Document Identifier: 69/216/CDV. https://webstore.iec.ch/publication/9273 [ISO4217] "ISO 4217: Currency codes" http://www.iso.org/iso/home/standards/currency_codes.htm [OCPP2.0-PART4] "OCPP 2.0.1: Part 4 - JSON over WebSockets implementation guide". http://www.openchargealliance.org/downloads/ [OpenADR] "Open Automated Demand Response" http://www.openadr.org/ [RFC1321] "The MD5 Message-Digest Algorithm" https://tools.ietf.org/html/rfc1321 [RFC2119] "Key words for use in RFCs to Indicate Requirement Levels". S. Bradner. March 1997. http://www.ietf.org/rfc/rfc2119.txt [RFC3339] "Date and Time on the Internet: Timestamps" https://tools.ietf.org/html/rfc3339 [RFC3986] "Uniform Resource Identifier (URI): Generic Syntax" https://tools.ietf.org/html/rfc3986 [RFC5646] "Tags for Identifying Languages" https://tools.ietf.org/html/rfc5646 2.5.2. Security related references Table 8. Security related references Reference Description
datasetNot linked to a paper · refsec · cited link
ENISA European Network and Information Security Agency, Algorithms, key size and parameters report 2014, 2014. (last accessed on 17 January 2016) https://www.enisa.europa.eu/publications/algorithms-key-size-and-parametersreport-2014 National Institute of Standards and Technology. FIPS PUB 140-2, Security Requirements for Cryptographic Modules, May 2001. http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.140-2.pdf
research reportNot linked to a paper · refsec · cited link
Cooper, D., et al., Internet X.509 Public Key Infrastructure Certificate and Certificate Revocation List (CRL) Profile, Internet Engineering Task Force, Request for Comments 5280, May 2008, http://www.ietf.org/rfc/rfc5280.txt
research reportNot linked to a paper · refsec · cited link
Dierks, T. and Rescorla, E., The Transport Layer Security (TLS) Protocol Version 1.2, Internet Engineering Task Force, Request for Comments 5246, August 2008, http://www.ietf.org/rfc/rfc5246.txt
research reportNot linked to a paper · refsec · cited link
Eastlake, D., Transport Layer Security (TLS) Extensions: Extension Definitions, Internet Engineering Task Force, Request for Comments 6066, January 2011, http://www.ietf.org/rfc/rfc6066.txt
research reportNot linked to a paper · refsec · cited link
McGrew, D. and Bailey, D., AES-CCM Cipher Suites for Transport Layer Security (TLS), Internet Engineering Task Force, Request for Comments 6655, July 2012, http://www.ietf.org/rfc/rfc6655.txt
research reportNot linked to a paper · refsec · cited link
Rescorla E. et al., Transport Layer Security (TLS) Renegotiation Indication Extension, Internet Engineering Task Force, Request for Comments 5746, February 2010, http://www.ietf.org/rfc/rfc5746.txt "Russel Housley, Tim Polk, Warwick Ford, and David Solo. Internet Public Key Infrastructure: X.509 Certificate and Certificate Revocation List (CRL) Profile, RFC 3280, April 2002." https://www.ietf.org/rfc/rfc3280.txt Pettersen. "The Transport Layer Security (TLS) Multiple Certificate Status Request Extension." RFC 6961, June 2013. https://tools.ietf.org/html/rfc6961. [10]
research reportNot linked to a paper · refsec · cited link
Hollenbeck, S., "Transport Layer Security Protocol Compression Methods", RFC 3749, May 2004. https://www.ietf.org/rfc/rfc3749.txt
research reportNot linked to a paper · refsec · cited link
[11] National Institute of Standards and Technology. Annex C: Approved Random Number Generators for FIPS PUB 140-2 [25], February 2012. https://csrc.nist.gov/csrc/media/publications/fips/140/2/final/documents/fips1402annexc.pdf
research reportNot linked to a paper · refsec · cited link
Bonn, Germany, May 2013. (in German) https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/ Interpretationen/AIS_20_pdf.html
research reportNot linked to a paper · refsec · cited link
Bonn, Germany, May 2013. (in German) https://www.bsi.bund.de/SharedDocs/Downloads/DE/BSI/Zertifizierung/ Interpretationen/AIS_31_pdf.html
research reportNot linked to a paper · refsec · cited link
OCPP 2.0.1 - © Open Charge Alliance 2020 11/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 Generic Reference Description
research reportNot linked to a paper · refsec
[15] P. Hoffman and W.C.A. Wijngaards, Elliptic Curve Digital Signature Algorithm (DSA) for DNNSEC, Internet Engineering Task Force (IETF) RFC 6605, April 2012. http://www.ietf.org/rfc/rfc6605.txt [16]
research reportNot linked to a paper · refsec · cited link
Adams, C., Farrell, S., Kause, T., and T. Mononen, "Internet X.509 Public Key Infrastructure Certificate Management Protocol (CMP)", RFC 4210, September 2005. https://www.ietf.org/rfc/rfc4210.txt
research reportNot linked to a paper · refsec · cited link
[17] National Institute of Standards and Technology. Special Publication 800-57 Part 1 Rev. 4, Recommendation for Key Management. January 2016. https://csrc.nist.gov/publications/detail/sp/800-57-part-1/rev-4/final [18]
research reportNot linked to a paper · refsec · cited link
OCPP 1.6. Interface description between Charging Station and CSMS. October 2015. http://www.openchargealliance.org/downloads/ [21]
research reportNot linked to a paper · refsec · cited link
Eekelen, M. van, Poll, E., Hubbers, E., Vieira, B., Broek, F. van den: An end-to-end security design for smart EV-charging for Enexis and ElaadNL by LaQuSo1. December 2, 2014. https://www.elaad.nl/smart-charging-end2end-securitydesign/ [22]
research reportNot linked to a paper · refsec · cited link
Santesson, et al. "X.509 Internet Public Key Infrastructure Online Certificate Status Protocol - OCSP" RFC 6960. June 2013. https://tools.ietf.org/html/rfc6960 [25]
research reportNot linked to a paper · refsec · cited link
OCPP 2.0.1 - © Open Charge Alliance 2020 12/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 Generic Transaction Energy Offer Energy Flow Transaction Transaction start is configured via configuration Variable: TxStartPoint EnergyOfferPeriod Energy Offer Period starts when the EVSE is ready and willing to supply energy. EnergyTransferPeriod Energy is transferred. During an EnergyOfferPeriod there may be periods the EV is not charging due to for instance, warm/full battery or EV internal smart charging. EnergyTransferPeriod Energy is transferred. EnergyOfferSuspendPeriod During a transaction, there may be periods the EnergyOffer to EV is suspended by the
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 13/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 Generic one functional block, but are included in multiple chapters throughout the specification. ISO 15118 authorization is included in the functional block Authorization and the Smart Charging use cases for ISO 15118 are included in the chapter Smart Charging. Certificate handling is described in a separate functional block. Implementors of 15118 need to be aware of timeout constraints enforced by 15118, see [ISO15118-1] (Page: 127, Table: 109) For reference, the current timing constrains for 15118 edition 1 are: Table 9. ISO 15118 Timing constrains Timeout Default Sequence Timeouts 60 seconds Sequence Performance Timeouts 40 seconds PaymentDetailsReq/Res 5 seconds CertificateUpdateReq/Res 5 seconds CertificateInstallationReq/Res 5 seconds
datasetNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 14/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 Generic 3. Generic Requirements This section is normative. The generic requirements build the basis for defining the use case elements described in the Functional Blocks. Table 10. Generic requirements Precondition Requirement definition Note
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 88/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 C. Authorization Charging Station
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 91/449 Part 2 - Specification
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 92/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 C. Authorization 2.3. GroupId C09 - Authorization by GroupId Table 75. C09 - Authorization by GroupId Type Description Name Authorization by GroupId Functional block C. Authorization Objective(s) To enable 2 EV drivers with different IdTokens to be authorized using the same GroupId. Description This use cases covers how a Charging Station can authorize an action for an EV Driver based on GroupId information. This could for example be used if 2 people regularly use the same EV: they can use their own IdToken (e.g. RFID card), and can deauthorize transactions that were started with the other idToken (with the same GroupId). Actors Charging Station, CSMS, EV Driver1, EV Driver2 Scenario description
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 163/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 E. Transactions Charging Station
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 The Charging Station MAY drop meter data in the TransactionEventRequest(eventType = Ended) message. When dropping meter data, the Charging Station SHALL drop intermediate values first (1st value, 3th value, 5th etc), not start dropping values from the start of the list or stop adding values to the list. After receiving a SessionStopReq message from the EV, the CS
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 F. RemoteControl F. RemoteControl
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 165/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 F. RemoteControl 1. Introduction This Functional Block describes three types of use cases for remote control management from the CSMS: 1. Remote Transaction Control. These use cases describe the functionality which enable the CSO (or indirect a third party) to start/stop a transaction with a remote command. 2. Unlocking a Connector. These use cases describe the functionality that enables the CSO (or indirect a third party) to unlock the Connector with a remote command. This can for example be used to assist customers when they have problems unplugging their cable. 3. Remote Trigger. These use cases describe all the remote trigger functionality of OCPP. This functionality enables remote triggering of messages. For example, requesting messages to be resend or request current status of some ongoing processes in the Charging Station.
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 166/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 F. RemoteControl 2. Use cases & Requirements 2.1. Remote Transaction Control F01 - Remote Start Transaction - Cable Plugin First Table 124. F01 - Remote Start Transaction - Cable Plugin First Type Description Name Remote Start Transaction - Cable Plugin First Functional block F. Remote Control Objective(s) 1. To remotely start a transaction by the CSMS. 2. To enable a CSO to help an EV Driver that has problems starting a transaction. 3. To enable third parties (e.g. mobile apps) to control charging transactions via the CSMS. Description This use case describes how the CSMS remotely requests the Charging Station to start a transaction by sending RequestStartTransactionRequest. Upon receipt, the Charging Station responds with RequestStartTransactionResponse and a status indicating whether it is able to try to start a transaction or not. Actors Charging Station, CSMS, CSO Scenario description 1. The EV Driver plugs in the cable at the Charging Station. 2. The Charging Station sends a StatusNotificationRequest to the CSMS to inform it about a Connector that became Occupied. 3. The CSMS responds with a StatusNotificationResponse, confirming that the StatusNotificationRequest was received. 4. The Charging Station sends a TransactionEventRequest (eventType = Started) notifying the
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 167/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 EV Driver F. RemoteControl Charging Station
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 168/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 F. RemoteControl F01 - Remote Start Transaction - Cable Plugin First - Requirements Table 125. F01 - Requirements Precondition Requirement definition Note F01.FR.01 If the value of AuthorizeRemoteStart = true. The Charging Station SHALL behave as if in response to a local action at the Charging Station to start a transaction with the IdToken given in RequestStartTransactionRequest message. This means that the Charging Station will first try to authorize the
research reportNot linked to a paper · refsec
EV, EVSE, Charging Station OCPP 2.0.1 - © Open Charge Alliance 2020 174/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 F. RemoteControl Type Description Prerequisites - If authorization according use cases in Functional Block C is applied, it SHALL be finished successfully. See ISO15118-1, use case Prerequisites F2, page 38. Combined scenario description
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 221/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 J. MeterValues Charging Station
research reportNot linked to a paper · refsec
OCPP 2.0.1 - © Open Charge Alliance 2020 222/449 Part 2 - Specification
research reportNot linked to a paper · refsec
FINAL, 2020-03-31 K. SmartCharging K. SmartCharging
research reportNot linked to a paper · refsec
Next →