Ford Motor Company - Ex Parte Communication
Docket document2022-10-17 · FHWA · correspondence · FHWA-2022-0008-0391
Original sourcePDF at sourceAttachment at source
Other documents for the same rulemaking (all, by stage)
2022-06-22 Federal RegisterNational Electric Vehicle Infrastructure Formula Program
2022-06-24 Regulatory impact analysisNational Electric Vehicle Infrastructure Preliminary Regulatory Impact Assessment of Notice of Proposed Rulemaking
2022-08-05 Docket documentJoint Office of Energy and Transportation - Overview of the Joint Office - Steve Lommele (June 28, 2022)
2022-08-05 Docket documentClean Cities Coalition Network - Overview of the National Electric Vehicle Infrastructure Program
2022-08-10 Docket documentU.S. Department of Energy - Vehicle Technologies Office and the Joint Office on Energy Transportation: Planned Publicly Accessible Electric Vehicle Charging Stations Briefing (July 15, 2022)
2022-08-10 Docket documentU.S. DOT/FHWA - Ex Parte Communication with National EV Charging initiative
2023-02-28 Federal RegisterNational Electric Vehicle Infrastructure Standards and Requirements
2023-02-28 Regulatory impact analysisNational Electric Vehicle Infrastructure Standards and Requirements - Final Rule Regulatory Impact Assessment - Draft February 14, 2023
2023-02-28 Docket documentOpen Charge Point Protocol (OCPP) 2.0.1, March 31, 2020, Open Charge Alliance
2023-02-28 Docket documentOpen Charge Point Interface 2.2.1, October 6, 2021, EVRoaming Foundation
2023-02-28 Docket documentSAE J1772 OCT2017, SAE Electric Vehicle and Plug in Hybrid Electric Vehicle Conductive Charge Coupler, SAE International
2023-02-28 Docket documentOpen Charge Point Protocol (OCPP) 1.6J, October 2015, Open Charge Alliance
References
No references to show.