Best Available Mercury Reduction Technology Evaluation and Mercury Emissions Reduction Plan for Minorca Plant
Other documents for the same rulemaking (all, by stage)
References: 34 extracted, 0 linked to papers
8. Butler, T., et al. Mercury in the environment and patterns of mercury deposition from NADP/MDN Mercury Deposition Network. Final Report. January 2007. 9. Contributions of global and regional sources to mercury deposition in New York State. Seigneur, C., et al. 2003, Environmental Pollution, Vol. 123, pp. 365-373. 10. Modeling atmospheric mercury deposition in the vicinity of power plants. Seigneur, C., Jansen, J. and
Levin, L. 2006, Journal of the Air & Waste Management Association, Vol. 56, pp. 743-751. 11. United Nations Environment Programme/Artic Monitoring and Assessment Programme. Technical Background Report for the Global Mercury Assessment. 2013.
12. Swain, Edward B., et al. Socioeconomic Consequences of Mercury Use and Pollution. s.l. : Royal Swedish Academy of Sciences, February 2007. Vol. 36, 1. 13. Minnesota Pollution Control Agency. Sources of mercury pollution and the methylmercury contamination of fish in Minnesota. 2013.
14. Rae, Douglas. Impact of Mercury Reductions in Minnesota. September 1997.
15. Hongming, Jiang, Arkley, Stuart and Wickman, Trent. Mercury Emissions from Induration of Taconite Concentrate Pellets – Stack Testing Results from Facilities in Minnesota. 2000. 16. Barr Engineering Co. Results of the June 23-25, 2015 Mercury Emissions Tests Performed at the ArcelorMittal Minorca Mine Inc. Located in Virginia, Minnesota. Minneapolis : s.n., 2015. 17. —. Summary of emissions speciation change on potential mercury loading to northeast Minnesota. Minneapolis : s.n., 2018.
18. Laudal, Dennis L. and Dunham, Grant E. Mercury control technologies for the taconite industry. Grand Forks, ND : Energy & Environmental Research Center, June 2007.
Minerals, October 15, 2003. 20. Engesser, Michael Berndt and John. Mercury Transport in Taconite Processing Facilities: (II) Fate of Mercury Captured by Wet Scrubbers. 2005.
21. Ekholm, Corie. Hibbing Taconite Company. 2017 Mercury Reduction Test Report. Phase III - Gap Analysis: Halide Injection on Furnace Line 2. April 13, 2018.
22. Berndt, Michael E. and Engesser, John. Mercury Transport in Taconite Processing Facilities: (III) Control Method Test Results. St. Paul, MN : Minnesota Department of Natural Resources. Division of Lands and Minerals, December 31, 2007.
MN : Minnesota Department of Natural Resources. Division of Lands and Minerals, May 30, 2008. 24. —. A Brief Summary of Hg Control Test Results for Br Injection into Taconite Induration Furnaces. St.
Paul, MN : Minnesota Department of Natural Resources, April 10, 2011.
25. Zhuang, Ye, Dunham, David J. and Pavlish, John H. Assessment of potential corrosion induced by bromine species used for mercury reduction in a taconite facility. Grand Forks, ND : Energy & Environmental Research Center, August 2009.
26. Berndt, Michael and Engesser, John. Mercury Transport in Taconite Processing Facilities: (I) Release and Capture During Induration. St. Paul, MN : Minnesota Department of Natural Resources. Division of Lands and Minerals, August 15, 2005.
27. Zhuang, Ye, Dunham, David J. and Pavlish, John H. Continuation of corrosion potential of bromide injection under taconite operating conditions. Grand Forks, ND : Energy & Environmental Research Center, March 2012.
28. Benson, Steven A., et al. Evaluation of Scrubber Additives and Carbon Injection to Increase Mercury Capture. Grand Forks, ND : University of North Dakota Institute for Energy Studies, August 17, 2012.
29. Berndt, Mike. Data from previous mercury reduction research. Email communication to Ryan Siats, Barr Engineering Co. September 15, 2016.
30. Pavlish, J. H. and Zhuang, Y. Proof-of-concept Testing of Novel Mercury Control Technology for a Minnesota Taconite Plant. Final Report. July 2008.
31. Benson, Steven A., et al. Phase two final report. Grand Forks, ND : University of North Dakota. Institute for Energy Studies, July 26, 2012.
32. Berndt, Michael. Minnesota Taconite Mercury Control Advisory Committee: Summary of Phase One Research Results (2010 - 2012). St. Paul, Minnesota : s.n., November 29, 2012.
33. Miller, J., et al. Mercury Control for Taconite Plants Using Gas-Phase Brominated Sorbents. Final Report. s.l. : Albemarle Environmental Division, July 9, 2012.
34. Bowell, Kyle, et al. Minnesota taconite Phase II research - evaluation of carbon injection to increase mercury capture. ArcelorMittal Minorca Mine Inc. Final Report. Prepared for Iron Mining Association of Minnesota. Highlands Ranch, CO : ADA-ES, Inc., May 16, 2014. 35. Barr Engineering Co. Activated Carbon Injection Testing to Control Mercury Air Emissions: Results of Extended Testing. Prepared for ArcelorMittal Minorca Mine Inc. September 2018.
36. Laudal, Dennis L. Evaluation of a Slipstream Baghouse for the Taconite Industry. Revised Final Report. Grand Forks, ND : University of North Dakota Energy & Environmental Research Center, January 2012.
37. Dunham, Grant E. and Miller, Stanley J. Demonstration of Mercury Capture in a Fixed Bed. Draft Final Report. Grand Forks, ND : University of North Dakota Energy & Environmental Research Center, June 2009.
Ranch, CO : ADA Environmental Solutions, September 2012. 39. Barr Engineering Co. Minnesota Taconite Mercury Reduction Research. GORE(TM) Demonstrations Summary Report. Duluth, MN : Barr Engineering Co., September 24, 2015.
40. Engesser, John. Evaluation of Minnesota Taconite Wet Scrubbers at Minntac, Keewatin Taconite, Hibbing Taconite, and United Taconite. s.l. : Minnesota Department of Natural Resources, Division of Lands & Minerals, 2006. 41. Florida Department of Environmental Protection. Integrating atmospheric mercury deposition with aquatic cycling in South Florida: An approach for conducting a Total Maximum Daily Load analysis for an atmospherically derived pollutant. November 2003.
42. Evers, D.C., et al. Biological mercury hotspots in the northeastern United States and southeastern Canada. BioScience. 2007. pp. 29-43, 57. 43. Reducing mercury in the northeast United States. King, S, S Hochbrunn, P Miller, J. Graham, T
Goldberg, A Wienert, and M Wilcox. May 2008, Air & Waste Mangement, pp. 9-13. 44. Barr Engineering Co. Results of the September 4-6, 2013 Particulate Matter and Nitrogen Oxides Performance Tests on the Indurating Furnace Line at ArcelorMittal Minorca Mine Inc. Located in Virgina, Minnesota. Minneapolis : s.n., 2013. 45. —. Results of the June 23-25 and 29-30, 2015 MACT and Title V MN IPER Particulate Matter and Nitrogen Oxides at the ArcelorMittal Minorca Mine Inc. Located in Virgina, Minnesota. Minneapolis : s.n., 2015. 46. —. Results of the July 11-14, 2017 MACT and IPER Particulate Matter Tests Performed at the ArcelorMittal Minorca Mine Inc. Located in Virginia, Minnesota. Minneapolis : s.n., 2017. 47. —. Results of the June 24 - July 31, 2013 Particulate Matter, Hydrogen Bromide and Bromine Emissions Engineering Tests Performed During the Phase II Mercury Reduction Study at ArcelorMittal Minorca Mine Inc. Located in Virginia, Minnesota. Minneapolis : s.n., 2013.
48. Jiang, Hongming and Severin, Marc. Phase II ACI Testing Review (DRAFT). St. Paul, MN : Minnesota Pollution Control Agency, November 21, 2014.
49. Berndt, Michael E. Review of Phase II Hg Control Reports. Letter to Hongming Jiang, Pollution Control Agency. St. Paul, MN : Minnesota Department of Natural Resources, October 31, 2014.
50. Eisenbraun, Boyd, Haugen, Chad and Sosalla, Nick. Technical Memorandum. Minorca Mine Scrubber Solids Mass Balance. Hibbing, MN : Barr Engineering Co., September 13, 2018. 51. U.S. Environmental Protection Agency. National Emission Standards for Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants (proposed rule, to be codified at 40 CFR Part 63). Federal Register. March 14, 2011. Vol. 76, 49, p. 13862. EPA–HQ–OAR–2002–0017. 52. —. National Emissions Standards for Hazardous Air Pollutants: Ferroalloys Production (final rule, to be codified at 40 CFR Part 63). Federal Register. June 30, 2015. Vol. 80, 125, p. 37384. EPA–HQ–OAR–2010– 0895. 53. —. National Emission Standards for Hazardous Air Pollutants: Gold Mine Ore Processing and Production Area Source Category and Addition to Source Category List for Standards (proposed rule, to be codified at 40 CFR Parts 9 and 63). Federal Register. April 28, 2010. Vol. 75, 81, p. 22483. EPA–HQ–OAR– 2010–0239. 54. —. National Emission Standards for Hazardous Air Pollutants for the Portland Cement Manufacturing Industry and Standards of Performance for Portland Cement Plants (proposed rule, to be codified at 40
CFR Parts 60 and 63). Federal Register. July 18, 2012. Vol. 77, 138, p. 42373. EPA–HQ–OAR–2011–0817. 55. —. National Emission Standards for Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants (proposed rule, to be codified at 40 CFR Part 63). March 14, 2011. Vol. 76, 49, p. 13858.
Methodology. 2017. 64. —. Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze (final rule, to be codified at 40 CFR Part 52). Federal Register. January 30, 2014. Vol. 79, 20, p. 5154. EPA–R08–OAR–2012–0026.
65. International, AACE. Cost Estimate Classification System - As Applied in Enginering, Procurement, and Construction for the Process Industries. 2005. Vols. AACE International Recommended Practice No. 18R-97. 66. U.S. Environmental Protection Agency. Procedure 5: Quality Assurance Requirements For Vapor Phase Mercury Continuous Emissions Monitoring Systems And Sorbent Trap Monitoring Systems Used For Compliance Determination At Stationary Sources. August 7, 2017. Appendices Appendix A
North, St. Paul, Minnesota 55155. Mercury Reduction Plan The goal of the Mercury TMDL is to reduce statewide mercury air emissions to 789 pounds per year. To achieve this goal, the MPCA undertook rulemaking and adopted rules regarding mercury reduction plans in Minn. R. 7007.0502. These rules established a mercury emission reduction, for ferrous mining or processing, of 72% from the amount of mercury emitted in 2008 or 2010. As stated in the Mercury TMDL Implementation Plan and reiterated in the MPCA’s Response to Comments for the rulemaking, “The technology developed to achieve the target must be technically and economically feasible, it must not impair pellet quality, and it must not cause excessive corrosion to pellet furnaces and associated ducting and emission-control equipment. Criteria for determining economic feasibility will be developed through a collaborative effort by the taconite industry and the