Memorandum Regarding Taconite Iron Ore Processing - Ample Margin of Safety (AMOS) Analysis. April 9, 2020
Other documents for the same rulemaking (all, by stage)
References
1. Putney, David, US Environmental Protection Agency, Memorandum, “Development of the Residual Risk Review Emissions Dataset for the Taconite Iron Ore Processing Source Category,” March 29, 2019. 2. Hibbing Taconite Analysis of Best Available Control Technology (BART), no date. 3. Minntac BART Report, September 8, 2006. 4. United Taconite Analysis of Best Available Retrofit Technology (BART), August 30, 2006. 5. Northshore Mining Company Analysis of Best Available Retrofit Technology (BART), September 6, 2006. 6. Keetac BART Report, September 8, 2006. 7. Mittal Steel BART Report, September 8, 2006. 8. U.S. EPA, Wet Electrostatic Precipitator (ESP) – Wire-Pipe Type, Air Pollution Control Technology Fact Sheet, EPA-452/F-03-029, no date. Attachment 1 Capitol and Annual Costs ($2006) of Wet Walled ESPs (WWESP) for Taconite Iron Ore Processing Facility Hibbing Location Minntac Hibbing Mountain Iron United Taconite Northshore4 Keetac5 ArcelorMittal Eveleth Line No. Capitol cost ($/Line) Annual Cost ($/Line) 42,951,640 9,337,928 43,604,738 9,559,244 44,500,959 9,848,188 27,948,027 5,322,323 39,347,773 8,448,332 39,347,773 8,448,332 36,370,821 7,939,628 37,793,453 8,123,761 29,805,809 7,441,650 Capitol cost ($/facility) Annual Cost ($/facility) 131,057,337 28,745,360 180,807,847 38,282,376 71,427,421