Technical Development Document for the Final Regulations Addressing Cooling Water Intake Structures for New Facilities [W-00-03-DCN-3-0002]
Other documents for the same rulemaking
References: 257 extracted, 0 linked to papers
Joskow, Paul L. 1997. "Restructuring, Competition and Regulatory Reform in the U.S. Electricity Sector," Journal qf Economic Perspectives, Volume 11, Number 3 - Summer 1997 - Pages 119-138. U.S. Department of Energy (DOE). 2000a. Energy Information Administration (EIA). Electric Power Industry Overview. (a), http://www.eia.doe.gov/cneaf/electricity/page/prim2.html. U.S. Department of Energy (DOE). 2000b. Energy Information Administration (EIA). Status of State Electric Industry Restructuring Activity as of September 2000. @ http://www.eia.doe.gov/cneaf/electricitv/chg •str/regmap.html. U.S. Department of Energy (DOE). 1999a. Energy Information Administration (EIA). "Market Trends." Annual Energy Outlook 2000. Report#DOE/EIA-0383(2000). December 19. U.S. Department of Energy (DOE). 1999b. Energy Infonnation Administration (EIA). Electric Power Annual 1998
Volume I. Report#DOE/EIA-0348(98)/l. U.S. Department of Energy (DOE). 1999c. Energy Information Administration (EIA). Electric Power Annual 1998
Volume II. Report#DOE/EIA-0348(98)/2. U.S. Department of Energy (DOE). 1998. Energy Information Administration (EIA). Form EIA-860A and Form EIA860B Annual Electric Generator Reports, Form EIA-861 Annual Electric Utility Report, @ http://www.eia.doe.gov/cneaf/electricity/page/data.html. U.S. Department of Energy (DOE). 1997. Energy Information Administration (EIA). Form EIA-767 Steam-Electric Plant Operation and Design Report, @ http://www.eia.doe.gov/cneaf/electricitv/page/data.html. U.S. Department of Energy (DOE). 1996a. Energy Information Administration (EIA) Electric Power Annual 1995 Volume U.S. Department of Energy (DOE). 1996b. Energy Information Administration (EIA). Electric Power Annual 1995
Volume II. U.S. Department of Energy (DOE). 1996. Energy Information Administration (EIA). Impacts of Electric Power Industry Restructuring on the Coal Industry, (cb, http://www.eia.doe.gov/cneaf/electricitv/chg str fuel/html/chapter 1 .html. U.S. Environmental Protection Agency (EPA). 1999. Industry Screener Questionnaire: Phase I Cooling Water Intake Structures. U.S. Geological Survey (USGS). 1995. http://water.usgs.gov/watuse/pdfl995/html. Estimated Use of Water in the United States in 1995. @ U.S. Environmental Protection Agency. 2001. Economic Analysis ofthe Final Regulations Addressing Cooling Water Intake Structures for New Facilities 1-23 § 316(b) TDD Chapter 1 for New Facilities Baseline Projections of New Facilities This Page Intentionally Left Blank 1-24 Costing Methodology § 316(b) TDD Chapter 2 for New Facilities Chapter 2: Costing Methodology
EPA used unit cost curves to develop facility-level capital and O&M cost estimates for 41 model facilities. These model facilities were then scaled to represent total industry compliance costs for the 121 facilities projected to begin operation between 2001 and 2020. Individual facilities will incur only a subset of the unit costs, depending on the extent to which they would have already complied with the requirements as originally designed (in the baseline) and on the compliance response they select. To account for this, EPA established a number of baseline scenarios (reflecting different baseline cooling water system types and waterbody types) so that the unit costs could be applied to the various model facilities to obtain facility-level costs. The cost estimates developed for various technologies are intended to represent a National "typical average" cost estimate. The cost estimates should not be used as a project pricing tool as they cannot account for all the site-specific conditions for a particular project. The facility-level capital and O&M costs presented in this chapter represent the net increase in costs for each set of compliance technology performance requirements as compared to the technology the facility would have installed absent this regulation. To calculate net costs for each model facility, EPA first calculated the cost for the entire cooling system for the baseline technology,
Anderson, R. 2000. Personal communication (February, and March) between Roland Anderson, Price Brothers, Dayton, OH and Faysal Bekdash, SAIC.
Antaya, Bill. 1999. Personal communication between Bill Antaya, The Coon-De Visser Company and Faysal Bekdash,
SAIC. Boles, D.E., et al. 1973. Technical and Economic Evaluations of Cooling Systems Blowdown Control Techniques.
Burns, J.M., and Micheletti, W.C. Comparison of Wet and Dry Cooling Systems for Combined Cycle Power Plants. November 4, 2000.
Campbell, Thomas A. 2001. Correspondence from Thomas A. Campbell, Managing Partner, Campbell, George & Strong,
LLP, to the Cooling Water Intake Structure (New Facilities) Proposed Rule Comment Docket Clerk, Water Docket, EPA. Subject: Submission of Comments Regarding May 25, 2001 Federal Register Notice of Data Availability; National Pollutant Discharge Elimination System-Regulations Addressing Cooling Water Intake Structures for New Facilities. June 25, 2001.
Coss, Tim. 2000. Personal communication (February, and March) between Tim Coss, the Boulder Trenchless Group and Faysal Bekdash, SAIC. U.S. Department of Energy (DOE). 1994. Environmental Mitigation at Hydroelectric Projects: Volume II. Benefits and Costs of Fish Passage and Protection. Francfort, J.E., Cada, G.F., Dauble, D.D., Hunt, R.T., Jones, D.W., Rinehart, B.N.,
Sommers, G.L. Costello, R.J. Idaho National Engineering Laboratory. U.S. EPA. Economic and Engineering Analyses ofthe Proposed §316(b) New Facility Rule. Office of Water. August 2000. U.S. EPA (EPA). (1996). Technology Transfer Handbook - Management of Water Treatment Plant Residuals, EPA/625/R95/008, April 1996. Edison Electric Institute (EEI). Environmental Directory of U.S. Power Plants. 1996. Electric Power Research Institute (EPRI). 1995. Proceedings: Cooling Tower and Advanced Cooling Systems Conference. Summary of Report TR-104867, obtained from EPRI's Web site at http://www.epri.com on 12/1/99.
EPRI. 1986a. Performance ofa Capacitive Cooling System for Dry Cooling. Summary of Report CS-4322, obtained from
EPRI. 1986b. Wet-Dry Cooling Demonstration: Test Results. Summary of Report CS-4321, obtained from EPRI's Web site at http://www.epri.com on 12/1/99. 2-57 § 316(b) TDD Chapter 2 for New Facilities Costing Methodology Federal Energy Regulatory Commission (FERC). 1995. Preliminary Assessment of Fish Entrainment at Hydropower
Flory, A. FlowServe Pump Division. Telephone Contact with John Sunda, SAIC. Regarding equipment costs for intake pumps and variable frequency drives. May 14, 2001.
Gerwick, B.C. Jr. 2000. Construction of Marine And offshore structures. 2nd edition. CRC Press.
Hensley, J.C. Undated. Cooling Tower Fundamentals. 2nd Edition. The Marley Cooling Tower Company (Mission, Kansas). 1985.
Huber, Gary. 2000. Personal communication (February, and March) between Gary Huber, Permalok and Faysal Bekdash,
SAIC. Kaplan, Charles. Memo to Martha Segall. April 18, 2000. Subject: Flow Reduction. (Water Docket #1-1073-TC).
Mirsky, G.R., et al. 1992. The Latest Worldwide Technology in Environmentally Designed Cooling Towers. Cooling Tower Institute 1992 Annual Meeting Technical Paper Number TP92-02.
Mirsky, G. and Bautier, J. 1997. Designs for Cooling Towers and Air Cooled Steam Conensers that Meet Today's Stringent Environmental Requirements. Presented at the EPRI 1997 Cooling Tower Conference (St. Petersburg, Florida) and ASME 1997 Joint Power Conference (Denver, Colorado).
Mirsky, G. 2000. Personal communication between Gary Mirsky, Hamon Cooling Towers and Faysal Bekdash, SAIC. Email dated 3/27/00.
Montdardon, S. 2000. Personal communication (February, and March) between Stephan Montdardon, Torch Inc. and Faysal
Bekdash, SAIC. Nicholson, J.M. (Stone & Webster Engineering Corp.) 1993. Preliminary Engineering Evaluation. Public Service Electric and Gas Company Salem Generating Station, NJPDES Permit No. NJ0005622, Public Hearing. Congress ofthe United States, Office of Technology Assessment (OTA). 1995. Fish Passage Technologies: Protection at Hydropower Facilities. OTA-ENV-641.
Paroby, Rich. 1999. Personal communication between Rich Paroby, District Sales Manager, Water Process Group and Deborah Nagle, U.S. EPA. E-mail dated May 12, 1999. Power Plant Research Program (PPRP) for Maryland. 1999. Cumulative Environmental Impact Report (CEIR), 10th Annual. Obtained from Maryland's PPRP Web site at http://www.dnr.md.us/bay/pprp/ on 11/18/99. R.S. Means Company, Inc. (R.S. Means). 1997a. Plumbing Cost Data 1998. 21st Annual Edition. R.S. Means. 1997b. Heavy Construction Cost Data 1998. 12th Annual Edition. § 316(b) TDD Chapter 2 for New Facilities Costing Methodology R.S. Means. 1997c. Environmental Remediation Cost Data 1998. Science Applications International Corporation (SAIC). 1994. Background Paper Number 3: Cooling Water Intake Technologies. Prepared by SAIC for U.S. EPA. Washington, DC.
SAIC. 1996. Supplement to Background Paper 3: Cooling Water Intake Technologies. Prepared by SAIC for U.S. EPA.
Washington, DC. SAIC. 2000. Cost Research and Analysis of Cooling Water Technologies for 316(b) Regulatory Options, Prepared by SAIC for Tetra Tech, for U.S. EPA. Washington, DC. Stone & Webster Engineering Corporation. 1992. Evaluation ofthe Potential Costs and Environmental Impacts of Retrofitting Cooling Towers on Existing Steam Electric Power Plants that Have Obtained Variances Under Section 316(a) of the Clean Water Act. Prepared by Stone & Webster for the Edison Electric Institute (EEI).
Tallon, B. GEA Power Systems Inc. Telephone Contact with John Sunda, SAIC. Regarding Air Cooled Condenser Fans. October 22, 2001.
Tatar, G. El Dorado Energy. Telephone Contact with John Sunda, SAIC. Regarding operation ofthe air cooled condenser fans. October 19, 2001.
Taylor, S. Bechtel. Telephone Contact with John Sunda, SAIC. Regarding cooling water pumping and condenser operation. May 11, 2001.
US Filter/Johnson Screens (US Filter). 1998. Surface Water Intake Screen Technical Data. Brochure. Utility Data Institute (UDI). 1995. EEI Power Statistics Database. Prepared by UDI for EEI. Washington, DC. The Utility Water Action Group (UWAG). 1978. Thermal Control Cost Factors. Chapter 2 - Report on the Capital Costs of Closed-Cycle Cooling Systems. Prepared by Stone & Webster Engineering Corporation for UWAG. Additional References Used for General Information But Not Specifically Cited
Envirex Inc. 1973. Traveling screens to protect fish in water intake systems. Bulletin No. 316-300.
Gathright, Trent. 1999. Personal communication between Trent Gathright, Marketing Manager, Brackett Green and Faysal Bekdash, SAIC. Letter dated November 16, 1999.
Norell, Bob. 1999. Personal communication between Bob Norell, US Filter/Johnson Screens and Tracy Scriba, SAIC.
Puder, M.G. and J.A. Veil. 1999. Summary Data on Cooling Water Use at Utilities and Nonutilities. Prepared by Puder and Veil, Argonne National Laboratory for U.S. DOE.
Swanekamp, Robert, PE. 1998. Parallel condensing combines best of all-wet, all-dry methods. Power. July/August 1998 issue. U.S. Filter. 1999. Raw Water Screening Intake Systems. Brochure. 2-59 P.37 § 316(b) TDD Chapter 2 for New Facilities Costing Methodology
Bums, J. M. and W. C. Micheletti. November 2000. Comparison of Wet and Dry Cooling Systems for Combined Cycle Power Plants. Version 2.1. Submitted as Appendix F to the comments ofthe Utility Water Act Group on
EPA's Proposed Section 316(b) Rule for New Facilities. Department of Energy. May 2000. Statement of Jay E. Hakes Administrator, Energy Information Administration, Department of Energy before the Committee on Energy and Natural Resources, United States Senate.
Durand, A et al. May 1999. Updated Rules for Pipe Sizing. Chemical Engineering. Entergy Nuclear Generation Company (Entergy). February 2001. Condenser Performance Analysis - Additional Data; Pilgrim Nuclear Power Station. Submitted by J.F. Alexander, to Nicholas Prodany, EPA Region 1. Environmental Protection Agency. September 2001. The Emissions & Generation Resource Integrated Database 2000 (E-GRID 2000). Version 2.0. http://www.epa.gov/airmarkets/egrid/index.html
Fleming, Robert. 2001. Personal communications between Robert Fleming, The Mariey Cooling Tower Co., and Faysal Bekdash, SAIC. General Electric. No Date. Steam Turbine Technology. Field Engineering Development Center Mechanical & Nuclear. Heat Exchanger Systems, Inc (HES). 2001. Condenser Performance Analysis.
Hensley, J.C. 1985. Cooling Tower Fundamentals. 2nd Edition. The Mariey Cooling Tower Company (Mission, Kansas).
Hess, Dale. June 2001. Condenser Cost Study. Graham Corporation.
Ishigai, S. 1999. Steam Power Engineering - Thermal Hydraulic Design Principles. Cambridge university Press. Kirk-Othmer. 1997. Encyclopedia of Chemical Technology. Fourth Edition. Volume 22. John Wiley and Sons, Inc. New York.
Mirsky, Gary. 2001. Personal communications between Gary Mirsky, Hamon Cooling Towers, and Faysal Bekdash,
SAIC. Nuclear Regulatory Commission. 1996. Generic Environmental Impact Statementfor License Renewal of Nuclear Plants. NUREG-1437 Vol. 1. http://www.nrc.gOv/docs/nuregs/staff/srl437/Vl/srl437vl.html#_l_128
Tatar, G. October 2001. Telephone Contact with John Sunda, SAIC. Regarding operation ofthe air cooled condenser fans. El Dorado Energy.
Taylor, S. May 2001. Telephone Contact with John Sunda, SAIC. Regarding cooling water pumping and condenser operation. Bechtel.
Woodruff, E.B.,Lammers,H.B.,Lammers,T.F. 1998. Steam Plant Operation. Seventh Edition. McGraw-Hill. New York. Stone & Webster Engineering Corporation. April 1992. Evaluation ofthe Potential Costs and Environmental Impacts ofRetrofitting Cooling Towers on Existing Steam Electric Power Plants that Have Obtained Variances under Section 316(a) ofthe Clean Water Act. Prepared for the Edison Electric Institute. 3-38 § 316(b) TDD Chapter 3 for New Facilities Attachments
POWER PLANT (Source: Ishigai 1999) Attachments ::-. i ::. Combustion loss Sensible Ileal ul air 0.08 Exhaust gas 25.21 2.39 Heal iransler loss 21.24 Turbine loss I'iping loss 0.13 6.60 Turbine unil Boiler unil Chemical cxergy ol fuel 99.92 / H o i reheated steair!"" m 41.99 Main steam 56.63 loSC Water spray 0.08 °" Feed waler ' 'P ,n 8 | ()SS Valve 7.89 2.25 1.44 0.10 2.95. . 2 . 9 5 , 0.98 10.84 Mixing loss P'P'ng „ , „ loss002 0.53 0.002 0.60 0.78 0.03