DOE G 413.3-4A Technology Readiness Assessment Guide
Other documents for the same rulemaking (all, by stage)
References: 2 extracted, 0 linked to papers
DOE-EM Note: The process/mechanics to follow with the use of the calculator are found in the reference: Nolte, William L., et al., “Technology Readiness Level Calculator,” October 20, 2003, Air Force Research Laboratory (AFRL), presented at the NDIA System Engineering Conference. Tables F-2 – F-7 were primarily based on an EM waste processing facility. DOE programs should modify the tables to fit program needs and/or updated. Table F-1. Top Level Questions for Determining Anticipated TRL Top-Level Question
TRL 1 Have the basic process technology process principles been observed and reported? Yes/No If Yes, Then Basis and Supporting Documentation Note: All TRLs should include compliance with DOE-STD-1189-2008. Testing and validation of safety functions in the relevant environment for the critical technology element is part of the TRA to include worker and public safety considerations. Appendix F