Damage Case Compendium, Volume III: Rejected Damage Cases - DCN SE04462
Other documents for the same rulemaking
References: 248 extracted, 0 linked to papers
NAPI Project. USWAG’s comment to the 2011 NODA docket (EPA-HQ-RCRA-2011-0392-0211), November 14, 2011: “This case does not meet the criteria for a damage case to surface water because allegations of damage to surface water quality are based on suspect data and interpretations that have not been independently verified or evaluated. The locations, dates, and methods for collection of surface water samples have not been provided. Parameter data are
III. CCR Rejected Damage Cases December 2014 Evaluation against Proven Damage Criteria Criteria Criterion 1: Criterion 2: Criterion 3: Evaluation Onsite water sample from a single “well” in the disposal area (in contact with CCR pore water) had arsenic above the primary EPA MCL and boron above the EPA Child Health Advisory. The operator performs voluntary groundwater monitoring, but has not been willing to share the data with regulatory authorities. Two statistical analyses of surface water data from the Chaco Wash have shown higher concentrations of various metals downstream from the impoundments compared to surface water upstream from the impoundments. However, one of these studies is considered unacceptable due to errors in its statistical methods. Copper and lead were found in downstream surface water at levels above the NNEPA recommended livestock water quality criteria, as well as selenium and zinc above
AWQC. None Resolution/Remediation: According to EarthJustice128 and USWAG,129 an intercept system around the ponds Nos. 3, 4 and 5 was installed in 1977 to intercept seepage and has been continuously operated since that time. In 1992, after seeps from the impoundments were discovered to be discharging to the Chaco Wash and following the finding of high levels of boron in the stream, EPA issued a 1997 compliance schedule that required construction of a groundwater intercept system (extraction wells) around Ponds 3, 4 and 5 and conversion to lined evaporation ponds. Additional extraction wells were installed in 2011. In 2003, compaction and regarding work was launched on top of Pond Nos. 3, 4 and 5, which were no longer in use, to prepare the surface for a synthetic liner. After preparation of the surface on Pond Nos. 3 and 4, a single liner (60 mil polyethylene, HDPE) was placed on about 72 acres in Pond No. 4 before receiving Units 1-2-3 and later Units 4-5 sluiced fly ash and FGD underflow, respectively. A double-lined (60 mil polyethylene, HDPE) 40 acre pond with a leak collection system was installed on top of Pond No. 3 to collect decanted ash sluice water from the single lined area of Pond No. 4. The double-lined water pond was constructed with a pump back system to allow reuse of the decanted process liquor as scrubber makeup (this was also done for pond No. 6, while still in service). A single liner (60 mil polyethylene,
HDPE) for Pond No. 5 was installed in 2009. In October 2011, APS constructed a north intercept trench excavated to the bottom of the shale formation. A review of groundwater level data and water quality data in three wells located down-gradient of the trench show declines in all constituents and groundwater level. APS is currently in the process of installing a second south intercept trench to remediate groundwater (2013). With the operation of the intercept trenches, continued operation and expansion of the DFADAs would have less potential to contaminate local groundwater and water quality in Chaco Wash. compared to several different water quality standards, including Federal Quality Criteria for chronic exposure to aquatic freshwater organisms, Navajo Nation’s water quality standards for fish and wildlife habitat, and New Mexico livestock standards. In addition, the information provided for the site does not contain any documented evidence of off‐site groundwater monitoring data or off‐site groundwater monitoring data showing exceedances of specified health‐based criteria.”
USWAG (2008). III. CCR Rejected Damage Cases December 2014 Surface discharge of fly ash sluicing water was stopped in late 1979. The substitute system decants water
EIP (2010): Out of Control: Mounting Damages from Coal Ash Waste Sites, Thirty-one New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste. Environmental Integrity Project and EarthJustice. February 24, 2010.
See, for instance, Haerer and McPherson (2008): “Our model results to date suggest that existing San Juan permeability measurements are underestimated compared to meaningful basin-scale values. Local measurements typically ignore fractures, faults, and high velocity conduits which are abundant at the basin scale. Simulation results indicate that the Fruitland Coal and other adjacent formations may carry much larger quantities of water and heat than previously anticipated.”
III. CCR Rejected Damage Cases December 2014 http://www.environmentalintegrity.org/news_reports/news_02_24_10.php
ICF (2010a): Assessment of Previously Identified Proven Damage and Recently Alleged Damage Cases,
Appendix B, Case #17. ICF, October 2010.
GEI (2009): Final Coal Ash Impoundment –Specific Site Assessment Report, Arizona Public Service, Four Corners Power Plant, GEI Consultants, Inc., Project No. 091330, September 2009. Accessed Online March 2013. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/surveys2/aps4crn-final.pdf Myers and Villanueva (1986): Myers, R.G., and Villanueva, E.D., 1986, Geohydrology of the aquifers that may be affected by the surface mining of coal in the Fruitland Formation in the San Juan Basin, northwestern New Mexico: U.S. Geological Survey Water-Resources Investigations Report 85-4251, 41 p. Accessed Online March 2013. http://pubs.usgs.gov/wri/1985/4251/report.pdf Kaiser et al., (1994): Kaiser, W.R., Swartz, T.E., and Hawkins, G.J., Hydrologic Framework of the Fruitland Formation, San Juan Basin. New Mexico Bureau of Mines and Minerals Bulletin 146: Coalbed methane in the upper Cretaceous Fruitland Formation, San Juan Basin, New Mexico and Colorado, pp. 133-164, 1994. Accessed Online March 2013. http://geosurvey.state.co.us/pubs/online/Documents/1994%20RS-31.pdf
EPA Region 9 Response to NPDES Comments (2008): EPA Region 9 Response to Comments BHP Billiton Navajo Coal Company - Navajo Mine NPDES Permit No. NN0028193. Accessed Online March 2013. http://www.epa.gov/region9/water/npdes/pdf/navajo/navajo-resp-comments-2-14-08-final.pdf
NPDES BHP Navajo (2008): National Pollutant Discharge Elimination System Permit No NN0028193. Accessed Online March 2013. http://www.epa.gov/region9/water/npdes/pdf/navajo/bhp-navajo-final-permit-02-13-08.pdf Ross (2007): Effects of Four Corner Power Plant Coal Combustion Waste Disposal on Surface and Groundwater Quality. Glenrose Engineering, Austin, Texas. Ross, L., submitted to Lisa Evans,
Norwest Applied Hydrology (2007): Technical Review of a Report Prepared by D.A.
Zimmerman (2005) entitled ‘A Preliminary Evaluation of the Potential for Surface Water Quality Impacts from Fly Ash Disposal at the Navajo Mine, New Mexico’, Norwest Applied Hydrology prepared for BHP Navajo Coal
Company, October 2007. Accessed Online March 2013. http://www.epa.gov/region9/water/npdes/pdf/navajo/bhp-comments.pdf Zimmerman (2005): A Preliminary Evaluation of the Potential for Surface Water Quality Impacts from Fly Ash Disposal at the Navajo Mine, New Mexico, Zimmerman, D.A. Prepared for Submission to the National Academy of Sciences Committee on Mine Placement of Coal Combustion Wastes. SETA, Inc. Cedar Crest NM, May 25, 2005. Accessed Online March 2013. http://www.setainc.com/
III. CCR Rejected Damage Cases December 2014 EarthJustice (2008): Comments on U.S. Environmental Protection Agency’s Coal Combustion Waste Damage Case Assessment (July, 2007). Prepared (February 11, 2008) by EathJustice, Clean Air Task Force et al., in response to U.S EPA, Notice of Data Availability 72 Fed. Reg. 49714, RCRA Docket Document No. EPA-HQ-RCRA-2006-0796-0446.
USWAG (2008): Supplementary Information to EarthJustice Allegations of Additional CCW Damage
Cases, Utility Solid Waste Activities Group, July 30, 2008, RCRA Docket Document No. EPA-HQRCRA-2006-0796-0468.
OSMRE (2012): Cumulative Hydrologic Impact Assessment (CHIA) of the BHP Navajo Coal Company’s (BNCC) Navajo Mine, Office of Surface Mining Reclamation and Enforcement, 2012. Accessed Online March 2013. http://www.wrcc.osmre.gov/Current_Initiatives/CHIA/Navajo/Chapter1.pdf http://www.wrcc.osmre.gov/Current_Initiatives/CHIA/Navajo/Chapter2.pdf http://www.wrcc.osmre.gov/Current_Initiatives/CHIA/Navajo/Chapter3.pdf http://www.wrcc.osmre.gov/Current_Initiatives/CHIA/Navajo/Chapter4.pdf http://www.wrcc.osmre.gov/Current_Initiatives/CHIA/Navajo/Chapter5.pdf
Application, Permit Number NM0003F, Office of Surface Mining Reclamation and Enforcement. Accessed Online March 2013. http://www.wrcc.osmre.gov/Current_Initiatives/Navajo_Mine/Permit.shtm Animas-La Plata Project FSEIS (2000): Animas-La Plata Project, Colorado – New Mexico Final Supplemental Environmental Impact Statement, Volume 1. U.S. Department of the Interior Bureau of
Reclamation, Upper Colorado region, 2000. Accessed Online March 2013. http://www.usbr.gov/uc/envdocs/eis/animas/fseis/index.html
NPDES Permit No. NN0028193 Fact Sheet, U.S. Environmental Protection Agency, Region IX, CWA Standards & Permits Office. Accessed Online March 2013. http://www.epa.gov/region9/water/npdes/pdf/navajo/bhp-navajo-final-fs.pdf
EPA Navajo Minefill Site Visit (2001): Coal Combustion Waste Minefill Management Practices - Navajo Nation - U.S. EPA Site Visit Draft Report, December 13, 2001. Accessed Online April 2013. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/sites/nn-visit.pdf Siemers and King (1974): Macroinvertebrate Paleoecology of a Transgressive Marine Sandstone, Cliff House Sandstone (Upper Cretaceous), Chaco Canyon, Northwestern New Mexico, Charles T. Siemers and Norman R. King. Pages 67-77 in New Mexico Geol. Soc. Guidebook, 25th Field Conf., Ghost Ranch (Central-Northern N.M.) and Contribution Number 6 of the Chaco Center Series, National Park Service and the University of New Mexico, 1974. Accessed Online April 2013. http://nmgs.nmt.edu/publications/guidebooks/downloads/25/25_p0267_p0277.pdf
NNEPA DEIS (2007): Navajo Nation Environmental Protection Agency Water Quality Data, Desert Rock Energy Project Draft EIS, Appendix F, May 2007. Accessed Online April 2013. http://teeic.anl.gov/documents/docs/library/DesertRockDraftEIS_AppendixF.pdf
OSMRE DEIS (2014): Draft Environmental Impact Assessment (DEIS) for the Four Corners Power Plant and Navajo Mine Energy Project. Office of Surface Mining and Enforcement, U.S. Department of the
Interior, March 28, 2014. Accessed Online April 2014. http://www.wrcc.osmre.gov/initiatives/fourCorners/documentLibrary.shtm
Fasset J.E. (2000): Geology and Coal Resources of the Upper Cretaceous Fruitland Formation, San Juan
Mexico, and Utah. Accessed Online April 2014.
Dubiel, R.F. (2013): Geology, sequence stratigraphy, and oil and gas assessment of the Lewis Shale Total Petroleum System, San Juan Basin, New Mexico and Colorado, Chap. 5 of U.S. Geological Survey San Juan Basin Assessment Team, Total petroleum systems and geologic assessment of undiscovered oil and gas resources in the San Juan Basin Province, exclusive of Paleozoic rocks, New Mexico and Colorado: U.S. Geological Survey Digital Data Series 69–F, p. 1–45.
Wilson, T.H. et al., (2012): Fracture and 3D seismic interpretations of the Fruitland Formation and cover strata: Implications for CO2 retention and tracer movement, San Juan Basin Pilot test, Thomas H. Wilson, Art Wells, Dwight Peters, Andrew Mioduchowski, Gabriela Martinez, George Koperna, Bill N. Akwari, Jason Heath, International Journal of Coal Geology, Volume 99, 1 September 2012, Pages 35–53. Accessed Online April 2014. http://www.sciencedirect.com/science/article/pii/S0166516212000432
McCord, J. et al., (1992): Heat-flow data suggest large ground-water fluxes through Fruitland coals of the northern San Juan basin, Colorado-New Mexico, John McCord, Marshall Reiter and Fred Phillips, Geology, v. 20 no. 5, 1992, p. 419-422. Accessed Online April 2014. http://dx.doi.org/10.1016/j.coal.2012.02.007 Haerer and McPherson (2008): Evaluating the impacts and capabilities of long term subsurface storage in the context of carbon sequestration in the San Juan basin, NM and CO. Drew Haerer, Brian McPherson, Energy Procedia, Volume 1, Issue 1, February 2009, Pages 2991–2998. Greenhouse Gas Control Technologies 9, Proceedings of the 9th International Conference on Greenhouse Gas Control Technologies (GHGT-9), 16–20 November 2008, Washington DC, USA. Accessed Online April 2014. http://www.sciencedirect.com/science/article/pii/S187661020900719X Thomas et al., (1998): Detailed study of selenium and selected constituents in water, bottom sediment, soil, and biota associated with irrigation drainage in the San Juan River area, New Mexico, 1991-1995.
Thomas, C.L., R.M. Wilson, J.D. Lusk, R.S. Bristol, and A.R. Shineman, 1998. U.S. Geological Survey Open-File Report 98-4213, Albuquerque, NM. 84 pp. In Endangered Species Act – Section 7
Affairs, October 15, 2009. Accessed Online April 2014. http://www.biologicaldiversity.org/programs/public_lands/energy/dirty_energy_development/coal/pdfs/E X_B.pdf Abell (1994): San Juan River Basin Water Quality and Contaminants Review, Volume I. Robin Abell, Museum of Southwestern Biology, Department of Biology, University of New Mexico, April 1994. Accessed Online April 2014.
III. CCR Rejected Damage Cases December 2014 R09. Antelope Valley Station - Basin Electric Power Cooperative, Beulah, Mercer County, North Dakota Type: Landfills (and non-implicated) Surface Impoundments. Background and Description: The Antelope Valley Station (AVS), located seven miles northwest of
Beulah, North Dakota, has disposed of CCR from the Basin Electric Power Cooperative since 1984.133 The Station contains five impoundments. Two of these, located northeast and north of the power plant, are permitted to store fly ash/flue gas emission and bottom ash. There are also two above-grade ponds which do not accept CCR: the Spray Drier Ash Water Make-Up Pond (SDA Pond)134 and the SDA Decantation Pond.135 The CCR byproducts generated at AVS are hauled to a nearby landfill,136 which is operated under the same permit issued by the North Dakota Department of Health for the SDA Pond and
Basin Electric, 2009b). The SDA Decantation Pond accepts dredged material and water from the SDA Pond when the SDA Pond is taken off-line and dredged every five to ten years, depending on the accumulated waste volume. The SDA Decantation Pond is re-lined (on the base and interior sidewalls) with two feet of compacted clay prior to each time it is used. Documented permeability tests indicate the specified permeability is 1 x 10 -7 cm/sec. Solid Waste Permit #SP-02. An older landfill, active between 1984 and 1998, is lined with clay. According to
EPA Minefill Site visit (2001), the 150-acre landfill has a life expectancy of 28 years and is divided into four cells, with cell one being active in 2001. There is a 2-foot compacted clay liner (permeability of less than 10 -7 cm/sec) and side-wall liners, as well as 100 feet of tight natural clays below the liner. The only water on the site is storm water runoff, but no water and/or leachate from the dry fill itself. The storm water is managed in two “zones:” (1) storm water in the CCR area stays onsite and is recycled for dust control on the landfill (the coarser bottom ash is also used as a cover for dust control), and (2) storm water outside of the CCR area is directed to a ditch and then pumped to an
NPDES permitted pond with a 60 mil HDPE liner. According to GEI (2011), the Antelope Valley Station is a dry ash facility. Raw water used in the power plant is pumped from Lake Sakakawea through a 42-inch-diameter pipe and stored in the raw water ponds located on the south side of the site. Water used in the power plant is discharged to the SDA Pond and is reused as make-up water in the ash water system, the SO2 removal system, and coal handling dust suppression systems. AVS does not discharge water to any waterway and is not located on a waterway. According to Basin Electric Power Cooperative comment to the proposed CCR rule, November 18, 2009, Pp. 1821, the Beulah Bed was mined (removed) beneath the landfill and is no longer present there. The landfill was located in this mined out area to take advantage of the existing mine pit. http://www.uswag.org/pdf/2010/CCR%20Comments/BasinElectric11192010pdf.pdf
EPA Minefill Site visit (2001).
Croft (1973). According to EPA Minefill Site visit (2001), the mine has a 110-foot layer of overburden and a 17foot coal seam. Since 1998, the mine has relied on fly ash as a stabilizer in constructing onsite haul roads and dragline repair pads used for heavy equipment such as 290 ton coal trucks and the massive dragline. This probably explains why, according to GEI (2011), none of the site’s design boreholes, including one that extends to nearly 220 feet, has reached bedrock: according to Croft (1973), the deposits forming the aquifer are less than one mile in width, and are about 250 feet thick. Subsurface soils underneath the AVS consist mostly of medium stiff to stiff sandy clays underlain by inter-bedded lenses of clays, sands and silts. Overlying the sand and gravel is about 20 feet of alluvium composed of dark sandy silt and clay.
Carlson (1973). According to GEI (2011), construction drawings indicate that the Antelope Valley property was built up with fill to the current grades at the locations of the SDA Pond and SDA Decantation Pond. The SDA Pond appears to be excavated into the fill down to the natural soils, while the SDA Decantation Pond appears to be founded on the fill material.
Finally, concerning EIP’s (2010a) ‘population at risk’ argument, BE claims that the North Dakota State Water Commission's Groundwater Data Query does not contain references to "public wells." Since groundwater flow is to the west, a well located "2.2 miles northeast of the station" would be up gradient of the site and thus could not be affected by the landfill. A well "located 4.4 miles southeast of the site" would similarly be up gradient and could not be affected by the landfill. USWAG claims that the site does not qualify as a damage case.148 Resolution/Remediation: No regulatory corrective actions, administrative rulings, or court decisions. According to EIP (2010a), the closed CCR landfill will remain in the post-closure monitoring phase through 2015.
EIP (2010a). According to EIP (2010a), arsenic levels were first measured in on-site groundwater above the federal MCL in 1986. Basin Electric Power Cooperative comment to the CCR rule’s docket, ibid. According to Croft (1973), water from the lignite aquifers is highly variable in its chemical quality: conductivity measurements of several hundred water samples generally range from 500 to 7,000 micromhos per centimeter; water samples from wells 145-86-1 1CDD and 146-88-10DDC were soft and very hard , respectively, and contained 1,050 and 1,810 ppm total dissolved solids. The samples contained 3.6 and 3.3 ppm iron and 0.2 and 0.4 ppm fluoride, respectively. The water was commonly reddish brown, because of organic compounds. Comment to the 2011 NODA docket (EPA-HQ-RCRA-2011-0392-0211), November 14, 2011: “This case does not meet the criteria for a damage case because the allegations do not contain any documented evidence of off‐site groundwater monitoring data or off‐site groundwater monitoring data showing exceedances of specified health‐ based criteria.”
III. CCR Rejected Damage Cases December 2014 Evaluation:149 ”Groundwater exceedances of the primary EPA MCL for arsenic have been found onsite. There has not been any assessment of groundwater or surface water offsite and there are no other impact or damage claims. There are no regulatory corrective actions, administrative rulings, or court decisions associated with the site.” Rationale for Rejection: Landfill located in a mined out lignite pit. References
EIP (2010a): In Harm’s Way: Lack Of Federal Coal Ash Regulations Endangers Americans and Their
Environment, Thirty-nine New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Environmental Integrity Project, EarthJustice and Sierra Club, Case # 19, August 26, 2010. http://www.environmentalintegrity.org/news_reports/08_26_10.php
Appendix C, Case #19. ICF, October 2010.
Basin Electric (2009a): Basin Electric Power Cooperative Response to a Request for Information under Section 104(e) of the Comprehensive Environmental Response, Compensation and Liability Act, 42
U.S.C. 9604(e), March 24, 2009. Accessed Online March 2013. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/surveys/basin-elect.pdf Basin Electric (2009b): Basin Electric Power Cooperative Response to a Request for Information under Section 104(e) of the Comprehensive Environmental Response, Compensation and Liability Act, 42