Oil and Gas and Sulphur Operations in the Outer Continental Shelf-Increased Safety Measures for Energy Development on the Outer Continental Shelf

Federal Register2010-10-14 · DEPARTMENT OF THE INTERIOR; Bureau of Ocean Energy Management, Regulation and Enforcement · Rule · 2010-25256
Interim final rule with request for comments.

This interim final rule implements certain safety measures recommended in the report entitled, "Increased Safety Measures for Energy Development on the Outer Continental Shelf" (Safety Measures Report), dated May 27, 2010. The President directed the Department of the Interior to develop the Safety Measures Report to identify measures necessary to improve the safety of oil and gas exploration and development on the Outer Continental Shelf in light of the Deepwater Horizon event on April 20, 2010, and resulting oil spill. To implement the practices recommended in the Safety Measures Report, the Bureau of Ocean Energy Management, Regulation and Enforcement is amending drilling regulations related to well control, including: subsea and surface blowout preventers, well casing and cementing, secondary intervention, unplanned disconnects, recordkeeping, well completion, and well plugging.

RIN 1010-AD68 · Docket BOEM-2010-0034

Other documents for the same rulemaking

2010-10-14 Regulatory impact analysisBenefit-Cost Analysis for the Interim Final Rule on Increased
2010-12-09 Federal RegisterOil and Gas and Sulphur Operations in the Outer Continental Shelf-Increased Safety Measures for Energy Development on the Outer Continental Shelf; Correction
2010-12-23 Federal RegisterIncreased Safety Measures for Energy Development on the Outer Continental Shelf; Availability, Initial Regulatory Flexibility Analysis
2010-12-27 Regulatory impact analysisINITIAL REGULATORY FLEXIBILITY ANALYSIS,
2013-02-07 Regulatory impact analysisRegulatory Impact Analysis

References: 8 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
Increased Safety Measures for Energy Development on the Outer Continental Shelf (Safety Measures Report), May 27, 2010
government reportNot linked to a paper · Background, Section I · cited link
API RP 65—Part 2, Isolating Potential Flow Zones During Well Construction, First Edition, May 2010
otherNot linked to a paper · Section VI, Documents Incorporated by Reference (§ 250.198)
API RP 53, Recommended Practices for Blowout Prevention Equipment Systems for Drilling Wells, Third Edition, March 1997; reaffirmed September 2004
otherNot linked to a paper · Section VI, Documents Incorporated by Reference (§ 250.198)
API Spec 16A: Specification for Drill-Through Equipment
otherNot linked to a paper · Section VII, Technical Consensus Standards
API Spec 16D: Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment
otherNot linked to a paper · Section VII, Technical Consensus Standards
API Spec 17D: Specification for Subsea Wellhead and Christmas Tree Equipment
otherNot linked to a paper · Section VII, Technical Consensus Standards
API Recommended Practice 17H; ISO 13628-8: Remotely Operated Vehicle (ROV) Interfaces on Subsea Production Systems
otherNot linked to a paper · Section VII, Technical Consensus Standards
National Safety Alert No. 2 (April 30, 2010)
government reportNot linked to a paper · Appendix A, Section 1