{"document":{"doc_id":14614,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Ocean Energy Management, Regulation and Enforcement","doc_type":"Rule","title":"Oil and Gas and Sulphur Operations in the Outer Continental Shelf-Increased Safety Measures for Energy Development on the Outer Continental Shelf","date":"2010-10-14","url":"https://www.federalregister.gov/documents/2010/10/14/2010-25256/oil-and-gas-and-sulphur-operations-in-the-outer-continental-shelf-increased-safety-measures-for","source_native_id":"2010-25256","status":"fetched","abstract":"This interim final rule implements certain safety measures recommended in the report entitled, \"Increased Safety Measures for Energy Development on the Outer Continental Shelf\" (Safety Measures Report), dated May 27, 2010. The President directed the Department of the Interior to develop the Safety Measures Report to identify measures necessary to improve the safety of oil and gas exploration and development on the Outer Continental Shelf in light of the Deepwater Horizon event on April 20, 2010, and resulting oil spill. To implement the practices recommended in the Safety Measures Report, the Bureau of Ocean Energy Management, Regulation and Enforcement is amending drilling regulations related to well control, including: subsea and surface blowout preventers, well casing and cementing, secondary intervention, unplanned disconnects, recordkeeping, well completion, and well plugging.","action":"Interim final rule with request for comments."},"dockets":["BOEM-2010-0034"],"rins":["RIN 1010-AD68"],"related":[{"doc_id":69138,"source":"ria","org":"BOEM","doc_type":"benefit_cost_analysis","title":"Benefit-Cost Analysis for the Interim Final Rule on Increased","date":"2010-10-14"},{"doc_id":14444,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Ocean Energy Management, Regulation and Enforcement","doc_type":"Rule (administrative)","title":"Oil and Gas and Sulphur Operations in the Outer Continental Shelf-Increased Safety Measures for Energy Development on the Outer Continental Shelf; Correction","date":"2010-12-09"},{"doc_id":14400,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Ocean Energy Management, Regulation and Enforcement","doc_type":"Rule","title":"Increased Safety Measures for Energy Development on the Outer Continental Shelf; Availability, Initial Regulatory Flexibility Analysis","date":"2010-12-23"},{"doc_id":69133,"source":"ria","org":"BOEM","doc_type":"regulatory_flexibility_analysis","title":"INITIAL REGULATORY FLEXIBILITY ANALYSIS, ","date":"2010-12-27"},{"doc_id":65294,"source":"ria","org":"BSEE","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis","date":"2013-02-07"}],"references":[{"citation_id":143322,"raw_reference":"Increased Safety Measures for Energy Development on the Outer Continental Shelf (Safety Measures Report), May 27, 2010","cited_authors":"Department of the Interior","cited_year":"2010","cited_title":"Increased Safety Measures for Energy Development on the Outer Continental Shelf","cited_venue":"Department of the Interior","cited_doi":null,"cited_url":"http://www.doi.gov/news/pressreleases/loader.cfm?csModule=security/getfile&PageID=33646","ref_kind":"government_report","section":"Background, Section I","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":143323,"raw_reference":"API RP 65—Part 2, Isolating Potential Flow Zones During Well Construction, First Edition, May 2010","cited_authors":"American Petroleum Institute","cited_year":"2010","cited_title":"Isolating Potential Flow Zones During Well Construction","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section VI, Documents Incorporated by Reference (§ 250.198)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":143324,"raw_reference":"API RP 53, Recommended Practices for Blowout Prevention Equipment Systems for Drilling Wells, Third Edition, March 1997; reaffirmed September 2004","cited_authors":"American Petroleum Institute","cited_year":"1997","cited_title":"Recommended Practices for Blowout Prevention Equipment Systems for Drilling Wells","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section VI, Documents Incorporated by Reference (§ 250.198)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":143325,"raw_reference":"API Spec 16A: Specification for Drill-Through Equipment","cited_authors":"American Petroleum Institute","cited_year":null,"cited_title":"Specification for Drill-Through Equipment","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section VII, Technical Consensus Standards","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":143326,"raw_reference":"API Spec 16D: Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment","cited_authors":"American Petroleum Institute","cited_year":null,"cited_title":"Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section VII, Technical Consensus Standards","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":143327,"raw_reference":"API Spec 17D: Specification for Subsea Wellhead and Christmas Tree Equipment","cited_authors":"American Petroleum Institute","cited_year":null,"cited_title":"Specification for Subsea Wellhead and Christmas Tree Equipment","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section VII, Technical Consensus Standards","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":143328,"raw_reference":"API Recommended Practice 17H; ISO 13628-8: Remotely Operated Vehicle (ROV) Interfaces on Subsea Production Systems","cited_authors":"American Petroleum Institute","cited_year":null,"cited_title":"Remotely Operated Vehicle (ROV) Interfaces on Subsea Production Systems","cited_venue":"American Petroleum Institute; ISO","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section VII, Technical Consensus Standards","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":143329,"raw_reference":"National Safety Alert No. 2 (April 30, 2010)","cited_authors":"USCG and BOEMRE","cited_year":"2010","cited_title":"National Safety Alert No. 2","cited_venue":"USCG and BOEMRE","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Appendix A, Section 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}