Damage Case Compendium Technical Support Document, Volume IIb Part One: Potential Damage Cases - DCN SE04460
Other documents for the same rulemaking
References: 510 extracted, 0 linked to papers
Burton Island OU2 RI (2011). IIb Potential CCR Damage Cases
WGMD News (2010): Indian River Power Plant, NRG Energy. WGMD News, July 15, 2010. Accessed Online August 2014. http://wp.wgmd.com/?p=6885 Shaw Environmental (2012): Feasibility Study, Indian River Generating Station Operable Unit No. 2, Burton Island Historical Ash Disposal Area, Millsboro, Delaware, Site Number DE-1399, Shaw
Environmental, Inc., November 2012. Accessed Online August 2014. Under: Final FS – OU2 – Text, and Appendix A-E: http://www.dnrec.delaware.gov/dwhs/Info/Pages/NRGIndianRiver.aspx IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 PTb05. Big Bend Station, Tampa Electric Company (TECO), Apollo Beach, Hillsborough
CCR disposal areas including one economizer fly ash pond and two bottom ash ponds, a wastewater recycling pond, a flue gas desulfurization (FGD) gypsum by-product pond, a bottom ash dry storage unit, and a waste disposal management unit.93 With the exception of the FGD gypsum storage area, all CCR management units at the site presently have liner systems.94 All of the units, including the FGD gypsum This facility was permitted under an Industrial Wastewater Permit. In 1979, another unit was added and permitted under the Florida Power Plant Siting Act (PPSA). Site Certification PA 79-12 and Industrial Wastewater Permit No. FLA017047. According to TECO Energy, Big Bend Power Station’s web site (http://www.tecoenergy.com/news/powerstation/bigbend/), the first unit began service in 1970; the second and third generating units were added in 1973 and 1976, respectively; and Unit Four was added in 1985. The Tampa Bay Seawater Desalination Plant, the largest Reverse Osmosis Desalination facility in the western hemisphere (95,000 m3/day or 25 MGD), co-located at Tampa Electric’s Big Bend station, was completed in 2002 (Hillsborough, 2002) and came online in March 2003. The intake and discharge of the desalination plant are connected directly to the cooling water discharge outfalls of the Tampa Electric Big Bend Power Station (Desalination: A National
Perspective, 2008). The facility is designed to withdraw up to 44 MGD from power plant cooling water yielding up to 25 MGD of potable water along with about 19 MGD of concentrate discharged back into the cooling water conduits. The withdrawal is a small fraction of the 1.4 billion gallons of cooling water used by the power plant, and the concentrate is returned to Big Bend Power Station’s cooling water stream where it is blended and typically diluted about 70:1 with cooling water before discharge. The salinity levels after dilution are approximately 1.0 to 1.5 percent higher than water in Tampa Bay, which is within normal seasonal fluctuations (Yates et al., 2011; De la Parte (2007). According to Tampa Electric Company (2009, Attachment 1), there are two bottom ash ponds (North and South, 5.7 and 6.0 acres, respectively; both commissioned in 1984 and expanded in 2001), three economizer ash ponds (North, South, both receiving fly ash/pyrite, and Long-Term Flyash, receiving de-minimis amounts of CCR; 5.5, 7.4, and 12.0 acres, respectively; all commissioned in 1984 and expanded in 2001), and three settling-recycle ponds (Settling Pond, North Recycle Pond and South Recycle Pond; 1.0, 2.6, and 8.6 acres, respectively; all receiving
FGD/ash residuals; all commissioned in 2009). Liner was installed in the two bottom ash ponds in 2001; (originally installed before commissioning?) liner was repaired in the North and South economizer ponds in 2002. The three settling-recycle ponds have had liner installed from the outset. The South Economizer Pond has been closed and is no longer receiving CCR. See Dewberry and Davis (2011, Fig. 2.1b) for an air-photo of the waste Units, and
EPA MCL exceedance on a property offsite, which was subsequently purchased by TECO. The report also notes that manganese, sulfate, and chloride were found above EPA SMCLs at this same offsite location. A number of other constituents (chloride, sodium, gross alpha,99 and TDS) were found in the groundwater Zone of Discharge (ZOD) above EPA SMCLs or Florida Department of Environmental Protection (FDEP) Groundwater Clean-up Target Levels (CTLs). Surface water: Surface water samples collected in February 2000 from ditches on-site, from a CCR seepage location, from a process water pond, and from a recycled wastewater pond indicated exceedances of state surface water standards for iron and boron above guidance criteria100 (FDEP, 2001).
Cordiano (2011). The impoundment has been issued in 2005 a National Pollutant Discharge Elimination Program (NPDES) Permit No. FL0000817.
EIP (2010) and references therein. Effects of Phosphate Mineralization (1977), Fig. 1; Altschuler et al., (1964).
EPA-HQ-RCRA-2006-0796-0446. MCL exceedances of arsenic are at x11 the MCL, and of thallium - at x8 the
EIP (2010) and references therein. IIb Potential CCR Damage Cases
EPA-HQ-RCRA-2006-0796-0460 and EPA-HQ-RCRA-2009-0640-10498. According to FCG, The exceedances noted in a 2007 EarthJustice report were detected during a contamination assessment, performed in 2001/2002 to determine the potential for offsite groundwater impacts, the findings of which were utilized in a 2003 FDEP report (Preliminary Evaluation of Analytical Data on CCPs).
EIP (2010): Out of Control: Mounting Damages from Coal Ash Waste Sites, Thirty-One New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Case #4. The Environmental Integrity Project and Earthjustice. February 24, 2010. http://www.environmentalintegrity.org/news_reports/news_02_24_10.php
ICF (2010): Assessment of Previously Identified Proven Damage and Recently Alleged Damage Cases,
Appendix B, Case #4. ICF, 10/2010. Florida DEP Site documents for Tampa Electric Company (TEC) Big Bend Site. Accessed Online July 2012. http://appprod.dep.state.fl.us/WWW_WACS/REPORTS/SW_Facility_Docs.asp?wacsid=95345
TECO’s comment to the 2007 NODA docket: EPA-HQ-RCRA-2006-0796-0460. According to Cordiano (2011), the final project in this program is the Gypsum Storage Area and Conveyor Improvement Project, presently in the preliminary engineering stage. Construction is scheduled for 2013-2015 after approval of the permits. Florida Electric Power Coordinating Group, Inc. (FCG) comment to the docket: EPA-HQ-RCRA-2009-064010498. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 Tampa Electric Company (2009): Tampa Electric Company (TEC) - Big Bend Power Plant Response to Request for Information under CERCLA Section 104(e), March 25, 2009. Accessed Online January 2014. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys/tampa.pdf Dewberry & Davis (2011): Coal Combustion Residue Impoundment, Round 9 – Final Dam Assessment
County, Florida. Dewberry & Davis, LLC, Fairfax, Virginia, December 2011. Accessed Online January 2014. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys2/tec_big_bend_final.pdf Florida Department of Environmental Protection, Consent Order OGC File No. 1275, Tampa Electric Company (Apr. 10, 2001). Florida Department of Environmental Protection, Consent Order OGC File No. 1275, Tampa Electric Company (Jan. 24, 2007). Remedial Action Plan approved. Effects of Phosphate Mineralization (1977): Effects of Phosphate Mineralization and the Phosphate Industry on Radium-226 in Groundwater of Central Florida. R. F. Kaufman and J.D. Bliss, USEPA Office of Radiation Programs, Las Vegas Facility, Las Vegas, Nevada, EPA/520-6-77-010, October 1977. Accessed Online July 2012. http://nepis.epa.gov/Exe/ZyNET.exe/9100Q1RV.txt?ZyActionD=ZyDocument&Client=EPA&Index=197 6%20Thru%201980&Docs=&Query=FNAME%3D9100Q1RV.TXT%20or%20%28%20hawthorne%20o r%20phosphorite%20or%20florida%20or%20grology%20or%20geohydrology%29&Time=&EndTime= &SearchMethod=1&TocRestrict=n&Toc=&TocEntry=&QField=&QFieldYear=&QFieldMonth=&QFiel dDay=&UseQField=&IntQFieldOp=1&ExtQFieldOp=1&XmlQuery=&File=D%3A%5CZYFILES%5CI
Committee, EPA-HQ-RCRA-2009-0640-10498 (Attachment J).
Cordiano (2011): Review of Coal Combustion Residual Storage and Disposal Processes of the Florida Electric Industry. Victor Cordiano, December 2011, State of Florida Public Service Commission Office of Auditing and Performance Analysis. PA-0-0-004. Accessed Online July 2012. http://www.psc.state.fl.us/publications/pdf/electricgas/ReviewCoal_2011.pdf Hillsborough County (2002): The Environmental Protection Commission of Hillsborough County 2002 Annual Report (accessed Online April 2012; (No longer accessible). http://www.epchc.org/annual_report_files/Annual%20Report%202002%20Fin al.pdf Desalination: A National Perspective (2008), Water Science and Technology Board (WSTB), the National Academies Press. Accessed Online July 2012. http://www.nap.edu/openbook.php?record_id=12184&page=59 IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 Yates et al., (2011): Yates, K.K., Greening, Holly, and Morrison, Gerold, eds., 2011, Integrating Science and Resource Management in Tampa Bay, Florida: U.S. Geological Survey Circular 1348, 280 p., available at http://pubs.usgs.gov/circ/1348/. Accessed Online July 2012. http://pubs.usgs.gov/circ/1348/pdf/Chapter%206_157-202.pdf De la Parte (2007): Desalination and Reclaimed Water -- Emerging Issues in Eastern Water Law.
PA, September 26-29, 2007. Accessed Online July 2012. http://www.dgfirm.com/pdf/07-08-13_Eastern_Water_Desal-Reuse.pdf Altschuler et al (1964): Field Guidebook: Geology and Geochemistry of the Bone Valley Formation and its Phosphate Deposits, West Central Florida. Z. S. Altschuler, J. B. Cathcart, and E.J. Young, 1964 (revised and reprinted 1994), Miami Geological Society. Accessed Online July 2012. http://sofia.usgs.gov/publications/reports/mgs_altschuler1964/mgs-altschuler-1964.pdf PTb06. CD McIntosh Jr. Power Plant, City of Lakeland, Lakeland, Polk County, Florida Type: Landfills (One on top of a phosphate mine pit), Sludge Dewatering Area, and Process Wastewater Ponds. Background and Description: The C.D. McIntosh Jr. Power Plant Unit 3 is a 365-MW, coal-fired electrical generating unit originally certified under the PPSA in 1978109 and became operational in 1981.110 The McIntosh plant occupies some 450 acres on the northeastern shore of Lake Parker, a wellpopulated lake often used for recreation purposes. The site contains two unlined Coal Combustion Residual (CCR) landfills, as well as a coal storage area, process wastewater ponds and an FGD According to FDEP’s comment to the proposed CCR rule docket: EPA-HQ-RCRA-2009-0640-4846 as well as to
EIP (2010a) claims that that the McIntosh Power Plant used a very high detection limit for arsenic of 0.0113 mg/L, which is higher than the MCL standard of 0.010 mg/L. Therefore, it is impossible to tell from laboratory reports exactly how many wells were contaminated with arsenic at or just below the MCL. IIb Potential CCR Damage Cases
Environment, Thirty-Nine New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Case #4, Environmental Integrity Project, Earthjustice and Sierra Club, August 26, 2010. http://www.environmentalintegrity.org/news_reports/08_26_10.php
Appendix C, Case #4. ICF, 10/2010. None of the data referenced for this alleged damage case satisfies EPA’s criterion of an “exceedance[s] of a primary drinking water standard that [is] measured in groundwater at a sufficient distance from the waste management unit to indicate that hazardous constituents had migrated to the extent that they could cause human health concerns.” Carl Eldred, Hopping Green & Sams - Attorneys and Counselors on behalf of Robert W. Klemans,
FDEP’s comment to the proposed CCR rule docket: EPA-HQ-RCRA-2009-0640-4846 and FDEP’s comment to the October 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0285. Comment to the 2011 NODA docket (EPA-HQ-RCRA-2011-0392-0211): “A 2001 FDEP Consent Order identified constituents on‐site in exceedance of MCLs/SMCLs. The Consent Order required additional downgradient wells, additional off‐site assessment activities, Interim Groundwater Monitoring Plan, Contamination Assessment
PART I (Cases 1-32) December 2014 US EPA, Facility Registry System, Facility Detail Report, CD McIntosh JR Power Plant, Accessed Online Oct 2010. http://oaspub.epa.gov/enviro/fii_query_dtl.disp_program_facility?p_registry_id=110000364882 City Of Lakeland, C.D. McIntosh, Jr. Power Plant, Units 3 And 5, Case No. Pa 74-06p, Conditions of
Certification, Modified 11/24/08. Accessed Online May 2012. http://www.dep.state.fl.us/siting/files/certification/pa74_06_2008_P.pdf Campbell (1986): Geology of Polk County, Florida. Kenneth M. Campbell, Florida Geologic Survey Open File Report 13, 1986. Accessed Online May 2012. http://ufdc.ufl.edu/UF00001012/00001/14j Campbell (1933): Geologic Map of Polk County, Florida. K. Campbell, Florida Geological Survey Open File Map Series 46, 1933. Accessed Online May 2012. http://ufdcimages.uflib.ufl.edu/UF/00/09/43/68/00001/POLK.pdf City of Lakeland Annual Report (2002): Annual Report to Bondholders of the City of Lakeland, Florida, for the Fiscal Year Ended September 30, 2002. Accessed Online May 2012. http://www.lakelandgov.net/Portals/Finance/Bond/2002%20Annual%20Report%20to%20Bondholders.pd Power (2012): Upgraded Controls Position McIntosh Plant for Efficient Operations. Power, Business and Technology for the Global Generation Industry, May 1, 2012. Accessed Online August 2014. http://www.powermag.com/upgraded-controls-position-mcintosh-plant-for-efficient-operations/ Clean Water Action (2012): CD McIntosh JR Power Plant: A Waste Profile of Coal Ash, Clean Water Action Florida (undated, apparently 2012), Environmental Integrity Project. Data Pursuant to Freedom of Information Act Request to U.S. EPA “re: Questionnaire results for Steam Electric Power Generating Effluent Guidelines.” June 2012.
EIP (2010) noted that onsite data from surface water discharges had five constituents above FDEP Orlando Utilities Commission (chartered in 1923) is a municipally-owned public utility providing water and electric service to Orlando, Florida and portions of adjacent unincorporated areas of Orange County, as well as St.
Cloud, Florida, in Osceola County. This facility was permitted under the Florida Electrical Power Plant Siting Act (PPSA), Chapter 403 Florida Statutes, Part II, in 1981. According to FDEP’s comment to the proposed CCR rule docket: EPA-HQ-RCRA-2009-0640-06846 and
TDS: 130-140 mg/L, sulfate: 5.3-13 mg/L, chloride: 6.1-10 mg/L, strontium: 240 µg/L, iron: 30-70 µg/L, copper: 10 µg/L, and manganese: 10µg /L (Rosenau et al., 1977). IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 Surface Water CTLs, including aluminum, sodium, chloride, sulfate, and gross alpha. Overall, since 2003, there have been multiple substantive exceedances of groundwater and surface water clean-up target levels and secondary MCLs.130 Considering that the underlying Hawthorn Group contains economic phosphorite that is being mined in the adjacent Polk County, it is reasonable to assume that the acidic water effluents discharged by the facility end dissolving some of the carbonate and phosphate rocks, releasing uranium and its daughter radionuclides,131 and causing elevated levels of gross alpha and Ra-226.132
EIP (2010) noted that FDEP inspections of the Curtis Stanton Energy Center since 2008 have revealed compliance problems such as: the CCR landfill was operating without a required permit, inadequate freeboard in ash ponds, unpermitted discharge of pollutants to a wetland, failure to collect stormwater samples, and water discharges of pH 4.0. Resolution: EIP (2010) noted that FDEP inspections of the Curtis Stanton Energy Center since 2008 have revealed compliance problems such as: the CCR landfill was operating without a required permit, inadequate freeboard in ash ponds, unpermitted discharge of pollutants to a wetland, failure to collect stormwater samples, and water discharges of pH 4.0.
TDS, sodium, chloride, gross alpha, and radium-226. Coal storage area wells have exceeded Clean-Up Target Levels for aluminum, iron, and pH (<3). Wells at the coal ash landfill’s eastern area have exceeded FDEP clean-up target levels for aluminum, iron, manganese, TDS, chloride, sulfate, gross alpha, radium-226, and pH. Surface water discharges exceeded FDEP Freshwater Clean-up Target levels for aluminum: 40,000 μg/L (standard: 13 μg/L); sodium: 770 mg/L (standard: 160 mg/L); chloride: 3,200 mg/L (standard: 250 mg/L); sulfate: 750 mg/L (standard: 250 mg/L); and gross alpha: 27.9 pCi/L (standard: 15 pCi/L). In addition, secondary MCLs were exceeded for iron: 3.5 mg/L (standard: 0.3 mg/L); manganese: 0.086 mg/L (standard: 0.05 mg/L); TDS: 6,500 mg/L (standard: 500 mg/L); and pH: 4.06 (standard: 6 -9). Furthermore, inspections of Curtis Stanton Energy Center revealed compliance problems such as the un-permitted discharge of pollutants to a wetland and water discharges of pH 4.0. A separate, additional data review by FDEP concluded that groundwater monitoring results since 1987 at four wells along the eastern side of the landfill (MW-11, 12, 13, and 15) were influenced by leachate from the coal ash landfill – as indicated by increases in beryllium, chloride, calcium, magnesium, sodium, sulfate, total dissolved solids (TDS), manganese, and vanadium. The FDEP concluded that the groundwater in those wells was characteristic of
CCR. According to Osmond et al (1986) the median value for the uranium content of the Florida phosphates is from 100 to 200 ppm. Whereas in the tetravalent state uranium is quite immobile, in the hexavalent state, uranium is relatively mobile as the uranyl ion, UO2+2. Further complexation can occur depending on pH and the presence of other ions. The most stable uranyl carbonate complex in the pH range 4-10 is UO2(CO3)2-2 Effects of Phosphate Mineralization (1977). IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 contamination and conduct corrective actions if necessary. FDEP states that it will also require bottomliner systems for any future disposal units at their on-site landfill. 133 Evaluation against Proven Damage Criteria134 Criteria Criterion 1: Documented exceedances of Evaluation Onsite groundwater data exceeded primary EPA MCLs primary maximum contaminant levels (MCLs) or for gross alpha radiation. other health-based standards measured in Onsite groundwater data exceeded FDEP Groundwater groundwater at sufficient distance from the waste CTLs for several constituents. management unit to indicate that hazardous constituents have migrated to the extent that they No offsite groundwater data are available. could cause human health concerns Criterion 2: Where a scientific study provides documented evidence of another type of damage to human health or the environment (e.g., ecological damage) Criterion 3: Where there has been an administrative ruling or court decision with an explicit finding of specific damage to human health or the environment Onsite surface water data exceeded FDEP Surface Water CTLs for aluminum, sodium, chloride, sulfate, and gross alpha. FDEP has reportedly required various operational and monitoring actions associated with compliance problem identified during inspections.
ICF (2010) rationale: Potential Damage. <Ground water exceedances of the primary EPA MCL for gross alpha have been found on site. While onsite surface water samples have exceeded FDEP Surface Water CTLs, there is no risk assessment or scientific study available that explicitly documents evidence of damage to human health or the environment. The status of enforcement activities is unclear, and there are no administrative rulings or court decisions associated with the site.> References
EIP (2010): Out of Control: Mounting Damages from Coal Ash Waste Sites, Thirty-one New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Case #2. Environmental Integrity Project and Earthjustice. February 24, 2010. http://www.environmentalintegrity.org/news_reports/news_02_24_10.php
Appendix B, Case #2. ICF, 10/2010.
FDEP (2008): State Of Florida Department Of Environmental Protection Orlando Utilities Commission
Curtis H. Stanton Energy Center Units 1 & 2, Combined Cycle Units A And Unit B PA 81-14K Supplemental Conditions Of Certification Modified 07/24/08. Accessed Online March 2012. http://www.dep.state.fl.us/siting/files/certification/pa81_14_2008_K.pdf Guidelines for Water Reuse (2004). Technology Transfer and Support Division, National Risk Management Research Laboratory, Office of Research and Development Cincinnati, OH, U.S.
FDEP Comments to the proposed CCR rule Docket: EPA-HQ-RCRA-2009-0640-6846 and FDEP’s comment to the October 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0285.
PART I (Cases 1-32) December 2014 Environmental Protection Agency, Municipal Support Division Office of Wastewater Management Office of Water Washington, DC , and U.S. Agency for International Development, Washington, DC.
EPA/625/R-04/108 September 2004. Accessed Online March 2012. http://www.epa.gov/nrmrl/wswrd/dw/smallsystems/pubs/625r04108.pdf Effects of Phosphate Mineralization (1977): Effects of Phosphate Mineralization and the Phosphate Industry on Radium-226 in Groundwater of Central Florida. R. F. Kaufman and J.D. Bliss, USEPA Office of Radiation Programs, Las Vegas Facility, Las Vegas, Nevada, EPA/520-6-77-010, October 1977. Accessed Online March 2012. http://nepis.epa.gov/Exe/ZyNET.exe/9100Q1RV.txt?ZyActionD=ZyDocument&Client=EPA&Index=197 6%20Thru%201980&Docs=&Query=FNAME%3D9100Q1RV.TXT%20or%20%28%20hawthorne%20o r%20phosphorite%20or%20florida%20or%20grology%20or%20geohydrology%29&Time=&EndTime= &SearchMethod=1&TocRestrict=n&Toc=&TocEntry=&QField=&QFieldYear=&QFieldMonth=&QFiel dDay=&UseQField=&IntQFieldOp=1&ExtQFieldOp=1&XmlQuery=&File=D%3A%5CZYFILES%5CI
NDEX%20DATA%5C76THRU80%5CTXT%5C00000017%5C9100Q1RV.txt&User=ANONYMOUS& Password=anonymous&SortMethod=h%7C&MaximumDocuments=10&FuzzyDegree=0&ImageQuality=r75g8/r75g8/x150y150g16/i425&Display= p%7Cf&DefSeekPage=x&SearchBack=ZyActionL&Back=ZyActionS&BackDesc=Results%20page&M aximumPages=1&ZyEntry=1&SeekPage=x Kuhns et al., (2003): Deep Foundations in the Challenging Geology of Central Florida. Gary Kuhns, Mohamad Hussein, Kathy Gray, pp. 33-43, in Proceedings of the 28th Annual Conference on Deep
Foundations, 2003, Miami Beach, Florida, Deep Foundations in Compressible Soil and Soft Rock. Accessed Online November 2012. http://www.pile.com/reference/DeepFoundations2003/DeepFoundationsChallengingGeology.pdf Rosenau et al., (1977): Springs of Florida, Jack C. Resenau, Glen L. Faulkner, Charles W. Hendry, Jr., and Robert W. Hull, State of Florida Bureau of Geology Bulletin 31, prepared by US Geological Survey, in cooperation with Florida Bureau of Geology, Division of Resource Management, Department of Natural Resources, and Bureau of Water Resources Management, Florida Department of Environmental
Regulation, Tallahassee, Florida, 1977. Accessed Online January 2013. http://ufdc.ufl.edu/UF00000232/00002/3j Osmond et al (1986): Radioelement Migration in Natural and Mined Phosphate Terrains, final report. J. K. Osmond et al., Department of geology, Florida State University, Tallahassee, Florida, June 1984. Accessed Online March 2012. http://www1.fipr.state.fl.us/fipr/fipr1.nsf/129fc2ac92d337ca85256c5b00481502/915e25dec051bbf785256 b2f00595399/$FILE/05-002-027Final.pdf IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 PTb08. Seminole Generating Station, Seminole Electric Cooperative Inc. (SECI), Palatka, Putnam County, Florida Type: FGD Landfill and Runoff Ponds. Background and Description: The Seminole Generating Station (SGS)135 site contains an active, unlined flue gas desulfurization (FGD) landfill,136 three lined process wastewater ponds, and two unlined storm water runoff ponds. The FGD sludge is dewatered and stabilized with lime and fly ash. Excess water from the FGD system is collected in the process wastewater ponds. The site is located within onehalf mile of the St. Johns River. Deep and shallow aquifers are contaminated far above FDEP standards and secondary drinking water standards, and contaminated groundwater has affected on-site wetlands. The SGS site is underlain by rock units ranging in age from Paleocene to Recent. Rocks of the Hawthorn
Group, located some 30 to 200 feet below the unconsolidated, surficial deposits, are vulnerable to the development of karst phenomena such as sinkholes.137 A shallow surficial aquifer of a fine to silty sand exists to a depth ranging from 23.5 to 48.5 feet below ground surface. A deeper surficial aquifer occurs underneath this shallow aquifer at an average depth of 43 feet BGS. Eleven groundwater monitoring wells were drilled in the shallow surficial aquifer, and six wells - in the deeper portion of the surficial water table aquifer.138 As part of an Interim Remedial Action Plan approved by Florida Department of Environmental Protection (FDEP) in 2004, Seminole Electric Cooperative was required to construct a contaminated groundwater capture system and perform groundwater monitoring. The groundwater monitoring is ongoing since 2004 with results reported quarterly to FDEP. Impact and Damage Claims: According to FDEP report139 there are exceedances of primary and secondary drinking water and water quality standards in groundwater and surface water. Groundwater contamination at the SEP FGD landfill measured arsenic at x19 MCL and lead at over x10, boron at over x40 its guidance concentration, aluminum at over x20 SMCL, and sulfate at over x3 SMCL. Some of The Seminole Generating Station (SGS) is located on 2,000 acres about six miles north of Palatka on U.S. Highway 17. This facility was permitted under the PPSA in 1978. Units and in-Service Dates: 715 MW (1984), 715