Damage Case Compendium Technical Support Document, Volume IIa: Potential Damage Cases - DCN SE04459
Other documents for the same rulemaking
References: 514 extracted, 0 linked to papers
EPRI (2010) concedes to onsite exceedance of sulfate.
EPRI (2010) claims that the 1987 article reported selenium concentrations in excess of the current MCL of 0.05 mg/L in a leachate well (screened in fly ash), but not in down-gradient monitoring wells. However, according to Figure #4 in Spencer & Drake (1987), Well #10, where that selenium excess was recorded in October 1983 (ibid, Table #4), is located topographically below the SSE confining dam and down-gradient from the old landfill.
EPRI (2010) also claims the exact site location is uncertain, and was tentatively identified using aerial imagery.
However, Google Map resolves these uncertainties by showing that each of the landfills occupies a discrete site. Both landfills are located west of Ward Avenue. However, the inactive, reclaimed landfill is located further away from Ward Avenue, and is bordered to its south-southeast by the pond. Presently, the pond comprises three larger and two smaller discrete basins. The active CCR landfill is confined to its west by the pond and to its east – by an access road that branches off Ward Avenue. Prior to an Iowa rulemaking in 1989, many coal combustion disposal sites were grandfathered and were not required to apply for a permit. After the rulemaking, many pre-existing facilities came under the permit program for the first time.
MW. East Bend is designed to burn low- to high-sulfur eastern bituminous coal. It is equipped with a scrubber (lime-based flue gas desulfurization system) along with a selective catalytic reduction (SCR) control system, which is designed to reduce NOx emissions by 85 percent. According to Dewberry & Davis (2011), these two FGD temporary holding ponds have a surface area of about 2.5 and 2.3 acres, respectively. The impoundments are regulated under an NPDES Permit No. KY 040444.
Duke Energy (2009). Dewberry & Davis (2011) claim that the large fly ash surface impoundment was designed in the ‘mid-1970s’. According to EPRI (2010), (i) the impoundment and most of the landfill have no liner; and (ii) two recent landfill cells have a composite geomembrane/geosynthetic clay liner with leachate collection; these cells received FGD gypsum from another power plant. As cited by Quarles and Segall (2011). Groundwater mounding is supported, according to Quarles and Segall (2011), by July 1998 groundwater sampling in Well MW-4, nearest the ash pond, which yielded groundwater temperature of 73.5 0F, as compared to 590F in typical shallow aquifer well on-site. IIa. CCR Damage Case Reassessment December 2014 In its comment to the docket,327 the Kentucky Department of Environmental Protection (KDEP) states that assessment of monitoring wells data associated with the surface impoundments328 indicates that exposure risk to residential uses would be confined only to wells put next to or under the surface
MW-6, and MW-6D, and for Specific Conductance - in wells MW-5 and MW-6. Initially, the on-site fixated scrubber sludge landfill was the suspected contamination source, but the 2006 groundwater investigation indicated concentrations were higher (and exceeded the SMCLs) in the vicinity of the ash pond.
EPA-HQ-RCRA-2009-0640-6260, pp. 6-7; 29-31. Kentucky has five phases to a groundwater monitoring report indicating that one parameter is above background or above an MCL: confirmation sampling and analysis by the agency, an assessment permit modification, assessment report, corrective action permit modification, and a correction action report. See 401 KAR 45:150 at http://www.lrc.ky.gov/kar/401/045/160.htm. Thirty-six parameters were monitored, including all toxic metals. Monitoring was required of the following indicator parameters, none of which has an EPA MCL standard: temperature, specific conductance, COD, organic carbon, chlorides, TDS, pH, and copper. However, this statement does not comport with monitoring data cited by EPRI (2010) further below for the same time period. For sulfate, the State’s secondary standard is 250 mg/L. According to Quarles and Segall (2011) nine wells (of ten) exceeded at least one standard from 1981 to 1997. Maximum MCL exccedances involved: arsenic – 4 times standard, lead – 1.6 times, and mercury – 450 times. Maximum SMCL exceedances included: iron – 43 times standard, and silver – 66 times.
EPA (2007). Initially, this site was classified as indeterminate because the commenters did not identify the source of the information and no quantitative data or further information about this site was available. Subsequently, additional information was obtained through KDEP that has resulted in its classification as a potential damage case. Between 1999 and the end of 2006, the required sampling parameter list was drastically reduced to only include
Temperature, chloride, Specific conductance, total dissolved solids (TDS), Chemical Oxygen Demand (COD), pH, and copper, none of which has an EPA MCL standard. IIa. CCR Damage Case Reassessment December 2014 When the results of data from 1999 through the July 2009 sampling event are compared to the 1981 results, the data indicate that: • Wells down-gradient of the ash pond and the sludge pond are no longer sampled. As a result, there are no wells to monitor the MCL exceedances that were reported in 1981for mercury in down-gradient wells at the ash pond or the sludge pond. • TDS concentrations have increased since 1981, particularly down-gradient of the capped portion of the special waste landfill (MW-3); • Statistically significant increases (SSIs) of chloride have also occurred in 1999 in MW-4 and
MW-6D, which are down-gradient of the special waste landfill; and • SSIs of Chemical Oxygen Demand (COD) have occurred in January 2008 at wells MW-4, MW5, MW-6, and MW-6D, and for specific conductance in wells MW-5 and MW-6. A revised groundwater assessment plan that also included a risk assessment was submitted to the KPDES in December 2009. The risk assessment concluded that (i) the only constituents of probable concern (COPCs) were iron, manganese, and sulfate that are classified by the EPA as only SMCLs; (ii) the only possible human exposure pathway was from ingesting water containing the three COPCs from plant production wells that supply drinking water to the plant. The human health risk was acceptable for onsite workers but that any future residential use would not be acceptable; and (iii) there was no risk to ecological receptors. Quarles and Segall (2011) claim, however, that the assessment was substantially flawed, because it failed to consider heavy metals that have been detected at high concentrations in the groundwater, failed to consider groundwater discharge to a nearby small receiving stream, and included very limited ash pond water samples.
EPRI’s (2010) tabulation of exceedances/elevated levels in groundwater334 is based on database provided by the power company containing analytical results collected from 1996 through January 2009. Resolution: In response to the SMCL exceedances, in 1999 the state required the facility to: (1) expand its list of semi-annual monitoring parameters, (2) prepare a groundwater assessment plan to determine the existence, quality, quantity, areal extent, and depth of groundwater degradation, and (3) establish the rate and direction of migration of contaminants in groundwater.
EPRI (2010) did not identify any Consent Orders or State /federal List (2010), but claims that ‘mitigation measures’ have been performed. Basis for Consideration as a Potential Damage Case: Based on the on-site exceedances of nonhealth-based standards for total dissolved solids, iron, and sulfate at this site, and subsequent state regulatory action based on these exceedances, this case is a potential damage case.335 References
EPA (2007): Coal Combustion Waste Damage Case Assessments, Case #35 and reference therein (Memorandum from SAIC to Dennis Ruddy regarding Final Revised Report on Resolution of 18 Previously Indeterminate Candidate Damage Cases, March 5, 2003). http://www.regulations.gov/#!documentDetail;D=EPA-HQ-RCRA-2006-0796-0015 According to the utility: Onsite exceedance attributed to CCRs: sulfate; onsite exceedances with source uncertain: iron and manganese; constituent concentrations below WQSs: arsenic, barium, cadmium, chloride, fluoride, chromium, copper, lead, selenium, and zinc. Note that EPRI’s statement about the constituent concentrations ‘below WQSs’ contradicts the statement by Quarles and Segall (2011), whereby beginning in 1999 and through the end of 2006, with the exception of copper, no monitoring of toxic metals was required.
EPRI (2010) also claims that iron and manganese are listed as ‘source uncertain’ because their highest concentrations occur at wells with low CCR leachate indicator (boron) concentrations.
EPRI (2010): Evaluation of Coal Combustion Product Damage Cases, Volume 2: Site Information. EPRI 1020554, Final Report, September 2010. Accessed Online July 2012. http://www.epri.com/search/Pages/results.aspx?sq=1&k=Evaluation%20of%20Coal%20Combustion%20 Product%20Damage%20Cases Duke Energy (2009): Response to a CERCLA 104(e) Request for Information, East Bend Generating
EPA (2007): 2007 CCW Damage Case Assessments #25 and references therein (Compendium of nineteen alleged CCW damage cases, US EPA, May 3, 2007). http://www.regulations.gov/#!documentDetail;D=EPA-HQ-RCRA-2006-0796-0015
EPRI (2010): Evaluation of Coal Combustion Product Damage Cases, Volume 2: Site Information. EPRI 1020554, Final Report, September 2010. Accessed Online February 2013. http://www.epri.com/search/Pages/results.aspx?sq=1&k=Evaluation%20of%20Coal%20Combustion%20 Product%20Damage%20Cases
USGS (2002): Ground-Water levels in Massachusetts, October 2001 to September 2002. Accessed Online February 2013. http://pubs.usgs.gov/wdr/WDR_MA-RI-02-1/pdfs/excerpt4.pdf IIa. CCR Damage Case Reassessment December 2014 According to EPA (2007) and a reference therein and based on the Supplemental Final Environmental Impact Report (2008), the project was the subject of Draft and Final EIR in 1976 for the land-filling of approximately 800 tons per day (tpd) of coal fly ash on a 35-acre portion of a 60.2-acre former sand and gravel quarrying site located off Route 79A (South Main Street) in Freetown. The Rezendes landfill was originally approved as a 14-acre monofill by the Freetown Board of Health and by permit from the MADEP. The Board of Health granted approval for the remaining 21 acres in 1990, and approved a request for expansion to within 250 feet of Assonet Bay in 1993. The final permit for the site was issued by MADEP in 1994, in which year the daily tonnage of coal fly ash received at the site was increased to 1,500 tons. The project site is bordered by Route 24, the Assonet River, Payne's Cove and South Main Street. The Proponent also proposed to develop an industrial park within the project site comprised of the former sand and gravel and completed fly ash landfill containing approximately 3.7 million square feet of light manufacturing and commercial space.
EPA (2007). IIa. CCR Damage Case Reassessment December 2014 Lapham (1988): Yield and Quality of Ground Water from Stratified-Drift Aquifers, River Basin,
Massachusetts, Wayne W. Lapham, U.S. Geological Survey Water-Resources Investigations Report 864053, prepared in cooperation with the Massachusetts Department of Environmental Management Division of Water Resources, Boston, Massachusetts, 1988. Accessed Online February 2013. http://pubs.usgs.gov/wri/1986/4053/report.pdf Simcox (1992): Water Resources of Massachusetts, Alison C. Simcox, U.S. Geological Survey Water-Resources Investigations Report 90-4144, prepared in cooperation with the Commonwealth of
Massachusetts, 1992. Accessed Online February 2013. http://pubs.usgs.gov/wri/wri904144/pdfs/wrir904144.pdf The Gulf of Main Times (2004): Tighter rules in store for coal ash disposal. The Gulf of Main Times, Winter 2004, Vo. 8, No. 3. Accessed Online July 2014. http://www.gulfofmaine.org/times/winter2004/coal.html Certificate on Project Change (2008): Certificate of the Secretary of Energy and Environmental Affairs on the Third Notice of Project Change, Payne’s Crossing, Freetown, Massachusetts, Ian A. Bowles, Secretary. Executive Office of Energy & Environmental Affairs, the Commonwealth of Massachusetts, January 9, 2008. Accessed Online January 2014. http://www.env.state.ma.us/mepa/pdffiles/certificates/010908/1982npc.pdf Supplemental Final Environmental Impact Report (2008): Certificate of the Secretary of Energy and Environmental Affairs of the Second Supplemental Final Environmental Impact Report, Payne’s
Crossing, Freetown, Ian A. Bowles, Secretary, Executive Office of Energy & Environmental Affairs, The Commonwealth of Massachusetts, November 14, 2008. Accessed Online February 2013. http://www.env.state.ma.us/mepa/pdffiles/certificates/111408/01982ssfeir.pdf SourceWatch (2013): Fly Ash Disposal in Freetown, MA, in Massachusetts and Coal, SourceWatch, last modified on 15 May 2013. Accessed July 2014. http://www.sourcewatch.org/index.php?title=Massachusetts_and_coal#Fly_Ash_Disposal_in_Freetown.2 C_MA PTa22. Xcel Energy/Southern Minnesota Municipal Power Agency – Sherburne County (Sherco) Generating Plant, Becker, Minnesota351 http://216.92.66.74/index.php?title=Sherburne_County_Plant#cite_note-iss-8; http://www.xcelenergy.com/About_Us/Our_Company/Power_Generation/Sherburne_County_(Sherco)_Generating_ Station. The Sherco base-load Plant, the single largest in Minnesota, comprises three generation units: Unit 1: 660
EPA (2007): 2007 Coal Combustion Waste Damage Case Assessments, Case #41 and reference therein (Compendium of nineteen alleged coal combustion wastes damage cases, May 3, 2007: EPA-HQ-RCRA2006-0796-0022). http://www.regulations.gov/#!documentDetail;D=EPA-HQ-RCRA-2006-0796-0015
EPA-HQ-RCRA-2006-0796-0022, citing a U.S. EPA analysis.
Minnesota Pollution Control Agency (2012).
EPA-HQ-RCRA-2006-0796-0022. IIa. CCR Damage Case Reassessment December 2014
Monitoring, July 30, 1993. Available from the docket for the 1999 Regulatory Determination for Fossil Fuel Combustion (Part 1), EPA-HQ-RCRA-1993-0042-1642.
Plants, Appendix E: Arthur D. Little Study of Waste Disposal at Coal-Fired Power Plants. EPA/530-SW88-002. Accessed Online August 2012. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/coal-rtc.pdf XcelEnergy (2009): Northern States Power (NSP) Company Response. Request for Information relating to Surface Impoundments under 104 (e) of the Comprehensive Environmental Response, Compensation, and Liability Act, 42 U.S.C. 9604(e), March 26, 2009. Accessed Online August 2012. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys/northern-states.pdf
CHA (2009): Coal Combustion Surface Impoundments (Task 3) Final Report, Northern States Power Company – Minnesota, Sherburne County Power Station, Becker, Minnesota, December 9, 2009
CHA Project No. 20085.2010.1510. Accessed Online August 2012. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/surveys2/ns-sherburne-final.pdf Minnesota Pollution Control Agency (2012): Proposed Becker Ash Landfill Expansion, Sherburne
County, Minnesota Environmental Assessment Worksheet, the Minnesota Pollution Control Agency (MPCA), August 17, 2012. Accessed Online February 2013. http://www.pca.state.mn.us/index.php/view-document.html?gid=18391 XcelEnergy (2014): Sherburne County (Sherco) Generating Station Sheer size sets this plant apart with three units; ScelEnergy’s website, 2014. Accessed Online January 2014. http://www.xcelenergy.com/About_Us/Our_Company/Power_Generation/Sherburne_County_(Sherco)_ Generating_Station PTa23. Central Hudson Gas & Electric Corp.371 Danskammer Waste Management
Facility, Newburgh, Orange County, New York372 Type: Coal Ash Landfill. Background and Description: This old, unlined landfill (established: 1959) is located on the west shore of the Hudson River in the Town of Newburgh, Orange County.373 The Danskammer power plant Dynegy Northeast Generation Inc. acquired the facility from Central Hudson Gas & Electric Corp. on January 30, 2001: http://google.brand.edgaronline.com/EFX_dll/EDGARpro.dll?FetchFilingHtmlSection1?SectionID=1806754-688025215&SessionID=kbeZFS_o2H3Gll7 And see EPA (2007), Case #28 and references therein. According to the New York State Department of Environmental Conservation Division of Materials Management Solid Waste Management Facilities Active Industrial/Commercial Landfills website: http://www.dec.ny.gov/docs/materials_minerals_pdf/indlist.pdf, the facility is located at 994 River Road, Newburgh,
NY 12550. Its current operational permit was issued in April 2013 and would expire in August 2018. IIa. CCR Damage Case Reassessment December 2014 withdrew water from the Hudson River for cooling purposes via an intake canal.374 Units 3 and 4 of this four-unit power plant burned either coal or natural gas with a combined generation capacity of 370
EPA (2007): 2007 CCW Damage Case Assessments, Case #28 and reference therein (Memorandum from
SAIC to Dennis Ruddy regarding Final Revised Report on Resolution of 18 Previously Indeterminate Candidate Damage Cases, March 5, 2003). http://www.regulations.gov/#!documentDetail;D=EPA-HQ-RCRA-2006-0796-0015
NYDEC (2004): Ruling on Proposed Issues and Adjudication and Petition for Party Status, Renewal and Modification of an SPDES (NY-0006262), Dynegy NE Generation, Inc., on behalf of Dynegy
Danskammer, LLC, Permittee, March 25, 2004. Accessed Online July 2012. http://www.dec.ny.gov/docs/legal_protection_pdf/danskammerr2.pdf Danskammer Ash Landfill Annual Report (2010): Dynegy Danskammer LLC Solid Waste Ash Landfill (994 River Road, Newburgh, Orange County, NY) Permit No. 3-3346-00011/00018, Annual Report, January 1, 2009 to December 31, 2010. Accessed Online January 2013. ftp://ftp.dec.state.ny.us/dshm/SWMF/Landfill/Landfill%20Annual%20Reports/Landfill%20Annual%20R eports%20-%202010/R3/36N01%20Dynergy%20Danskammer.ind%20R3%202010.pdf
Ellis (2013): Notice of Intent to Retire Dynegy Danskammer, L.L.C. Units 1 – 6, Letter via Electronic Mail from Dean M. Ellis, Sr. Director, Government Affairs, Dynegy Danskammer, L.L.C. – Debtor In Possession, to Hon. Jeffrey C. Cohen, Acting Secretary, New York Public Service IIa. CCR Damage Case Reassessment December 2014
Commission, Three Empire State Plaza, Albany, New York 12223, January 3, 2013. Accessed Online January 2013. http://www.nyiso.com/public/webdocs/markets_operations/services/planning/Documents_and_Resources /Planned_Generation_Retirements/Planned_Retirement_Notices/Danskammer_Retirement_Notice.pdf Cherry et al., (2000): Review of the Global Adverse Environmental Impacts to Ground Water and Aquatic Ecosystems from Coal Combustion Wastes. Donald S. Cherry, Rebecca J. Currie, and David J.
Soucek, Biology Department, Virginia Tech., Blacksburg, Virginia, prepared for Hoosier Environmental Council and Citizens Coal Council, Indianapolis, Indiana, March 28, 2000. Accessed Online August 2012. For State of New York DEC AJD May 24, 2006 Decision in the Matter of a Renewal and Modification of a State Pollutant Discharge Elimination System (SPDES) Permit Pursuant to Article 17 of the Environmental Conservation Law and Title 6 of the Official Compilation of Codes, Rules and Regulations of the State of New York Parts 704 and 750, see http://www.dec.ny.gov/hearings/11167.html. This hearing had been triggered by the plant’s request for retrofitting the Facility with a closed-cycle cooling system. The hearing concluded that the installation of seasonal sonic deterrent equipment, and the implementation of a flow reduction and outage program, as conditioned by the revised draft SPDES permit, would be the best technology available at the Danskammer Generating Facility for minimizing adverse environmental impacts,.
NYDEC (2004). The Danskammer power station was rendered inoperable as a result of Hurricane Sandy (October 29-30, 2012, http://www.faqs.org/sec-filings/121217/DYNEGY-INC_8-K/a12-29402_1ex99d2.htm, page 21), and was subsequently auctioned for demolition on December 14, 2012. Following closing of the sale and retirement notification process, ICS NY Holdings, LLC who won the bid were to demolish any remaining structures and remediate the site (http://www.marketwatch.com/story/dynegy-announces-results-of-roseton-and-danskammerauction-2012-12-10, and Dean M. Ellis, 2013). This was preceded by Dynegy Holdings and four of its subsidiaries having filed, on Nov. 7, 2011, for Chapter 11 bankruptcy protection in the Southern District Court of New York in Poughkeepsie. The company, which was $4.2 billion in debt, blamed falling electric prices for the filing. In July 2012, Dynegy Inc., the parent company, filed for Chapter 11. On Sept. 30, Dynegy Inc. and Dynegy Holdings merged, with Dynegy Inc. being the surviving entity. The company emerged from bankruptcy Oct. 1, 2012.
EPA (2007). IIa. CCR Damage Case Reassessment December 2014 http://www.citizenscoalcouncil.org/wp-content/uploads/2012/07/A-REVIEW-OF-THE-ADVERSEENVIRONMENTAL-IMPACTS-OF-COAL-COMBUS.htm Public Service Commission, NY (2014): In The Matter of the Verified Joint Application of Helios Power
Therefore, this case is a potential damage case.388 According to EPRI (2010), there were also onsite exceedances of magnesium and ammonia, as well as elevated (but below MCL) cadmium and arsenic. References
EPA (2007): 2007 CCW Damage Case Assessments, Case #27 and reference therein (Memorandum from
EPRI (2010) claims that iron concentrations also exceeded standards at times in an up-gradient well; manganese exceedances reportedly due to natural conditions; sodium concentrations were highest in an up-gradient well, reportedly due to road salting; and ammonia concentrations decreased after capping in all except one monitoring well; the plant has a selective catalytic reduction (SCR) system.
EPRI (2010): Evaluation of Coal Combustion Product Damage Cases, Volume 2: Site Information. EPRI 1020554, Final Report, September 2010. Accessed Online July 2012. http://www.epri.com/search/Pages/results.aspx?sq=1&k=Evaluation%20of%20Coal%20Combustion%20 Product%20Damage%20Cases Cherry et al., (2000): Review of the Global Adverse Environmental Impacts to Ground Water and Aquatic Ecosystems from Coal Combustion Wastes, Donald S. Cherry, Rebecca J. Currie, and David J.
Soucek, Biology Department, Virginia Tech, Blacksburg, Virginia 24061-0406, prepared for: Hoosier Environmental Council and Citizens Coal Council, Indianapolis, Indiana 46202, March 28, 2000. Accessed Online December 2012. http://www.citizenscoalcouncil.org/wp-content/uploads/2012/07/A-REVIEW-OF-THE-ADVERSEENVIRONMENTAL-IMPACTS-OF-COAL-COMBUS.htm Stearns & Wheler (2010): Broome County Local Solid Waste Management Plan Update, Draft Report submitted to Broome County Division of Waste Management, Stearns & Wheler, February 10, 2010. Accessed Online December 2012. http://www.gobroomecounty.com/files/dpw/pdfs/Draft%20Online%20Version%20Redo.pdf
AES Eastern Energy, L.P. (2001): AES Eastern Energy, L.P., FORM 10-K, Annual Report Pursuant to Section 13 or 15 (d) of the Securities Exchange Act of 1934, for the fiscal year ended December 31, 2000, Commission file number 333-89725. Accessed Online December 2012. http://www.getfilings.com/o0000893838-01-500081.html PTa25. C.R. Huntley Flyash Landfill, Tonawanda, Erie County, New York389 Type: Offsite Coal Ash Landfill. Background and Description: The Huntley Fly Ash off-site landfill 117-acre disposal facility is located 1,000 feet from the Niagara River south of Buffalo, in a heavily industrial area.390 Since the early 1970s, the site has been used for the disposal of fly- and bottom ash, pyrites, and dewatered wastewater treatment sludge from the Huntley power plant.391 The site consists of five disposal areas: two areas closed prior to 1987, one area closed in 1987, another one (the Phase I area) operated from about 1987 to Owned by NRG Energy; formerly owned by Niagara Mohawk.
See EPA (2007), Case #28 and references therein. For EPA’s Facility Detail Report, see http://iaspub.epa.gov/enviro/fii_query_detail.disp_program_facility?p_registry_id=110009162850.