Compendium-NAPSR-Second-Edition-CLEAN-gl-100313
Original sourcePDF at sourceAttachment at source
Other documents for the same rulemaking
References: 2 extracted, 0 linked to papers
September, 1946. 9) "Orifice Metering of Natural Gas", Report No.3 of the
PSC 133.03 When commission authorization or National Association of Pipeline Safety Representatives (NAPSR) 2013 Summary Report of State Pipeline Safety Initiatives and Requirements Providing Increased Public Safety compared to Code of Federal Regulations. Page 317 Wisconsin State Page Last Revised: Sept 2013 Category Federal Regulation Part/SubPart Valves Part 192.747 Valves Part 192.747 Valves Part 192.365 Valves Part 192.355 Page 318 Additional or More Stringent State Requirement addition to plant the cost of which exceeds $1,500,000 or 4% of the utility’s gross gas operating revenue received during the previous calendar year. 5 Other scenarios requiring notification are specified. Inspection shall include checking of alignment to permit use of a key or wrench and clearing from the valve box or vault any debris which would interfere or delay the operation of the valve. Records shall be maintained to show specific valve location and such records shall be made continuously accessible to authorized personnel for use under emergency conditions.. The by−pass valves in district regulator stations supplying gas to a low pressure distribution system shall be sealed, locked or otherwise be