EPA Base Case v.5.16 for 2015 Ozone NAAQS Transport NODA Using IPM Incremental Documentation

Docket document2026-01-30 · EPA · report · EPA-HQ-OAR-2025-0192-0059
RIN 2060-AW63 · Docket EPA-HQ-OAR-2025-0192

Other documents for the same rulemaking (all, by stage)

2026-01-30 Federal RegisterInterstate Transport Plan Review for the 2015 Ozone NAAQS
2026-01-30 Docket documentEO 12866 Meeting Documentation
2026-01-30 Docket documentEO 12866 Review Initiated Interim Changes
2026-01-30 Docket documentFinal GNP O3 DVs Contributions
2026-01-30 Docket documentO3 Design Values and Contributions 2011en Modeling
2026-01-30 Docket documentDaily Contributions from Arkansas to Allegan 2023en Modeling
2026-01-30 Docket documentNV Washoe Co 2015 Ozone iSIP
2026-01-30 Docket documentO3 Design Values and Contributions 2016v2 Modeling
2026-01-30 Docket documentKansas Air Quality State Implementation Plan Revision for the Implementation, Maintenance, and Enforcement of the 2015 Ozone (O3) National Ambient Air Quality Standards (NAAQS)
2026-01-30 Docket documentNV NDEP 2015 Ozone iSIP
2026-01-30 Docket documentPreparation of Emissions Inventories for the Version 6.3, 2011 Emissions Modeling Platform
2026-01-30 Docket documentTsirigotis Memo Aug 2018 Analysis of Contribution Thresholds
2026-01-30 Docket documentMinnesota 2015 Ozone Infrastructure SIP
2026-01-30 Docket documentUpdates to Emissions Inventories for the Version 6.3, 2011 Emissions Modeling Platform for the Year 2023
2026-01-30 Docket documentCAMx 2016v2 MDA8 O3 Model Performance Stats
2026-01-30 Docket documentNV Clark Co 2015 Ozone iSIP
2026-01-30 Docket documentInterstate Transport Phase Regulatory Text Changes
2026-01-30 Docket documentMeteorological Modeling for 2016
2026-01-30 Docket documentKansas Public Participation
2026-01-30 Docket documentAllete Inc. dba Minnesota Power et al. v. EPA No. 23-1776 (8th Cir. July 5, 2023) - Stay Order
2026-01-30 Docket documentKansas Authorizing Statutes
2026-01-30 Docket documentAlabama 127 6/21/2022 Submittal For Ozone 2015 ISIP
2026-01-30 Docket documentKentucky et al. v. EPA Nos. 23-3216 and 23-3225 (6th Cir. 2024) - Opinion
2026-01-30 Docket documentKentucky et al. v. EPA Nos. 23-3216 and 23-3225 (6th Cir. Jan. 29 2024) - EPA Merits Brief Petition for Review of Final Agency Action of the United States Environmental Protection Agency
2026-01-30 Docket documentMississippi 2015 Ozone Infrastructure SIP Prongs 1 and 2
2026-01-30 Docket documentNevada Cement Co. v. EPA No. 23-682 (9th Cir. Dec. 17, 2024) - Stay Lift
2026-01-30 Docket documentKansas Submission Form
2026-01-30 Docket documentTexas et al. v. EPA No. 23-60069 (5th Cir. 2025) - Opinion
2026-01-30 Docket documentArizona State Implementation Plan Revision under Clean Air Act Sections 110(a)(1) and 110(a)(2) for the 2015 Ozone National Ambient Air Quality Standards
2026-01-30 Docket documentNMED 2015 Ozone Transport Certification Adoption Order Hearing Transcript
2026-01-30 Docket documentTexas et al. v. EPA No. 23-60069 (5th Cir. Aug. 15, 2023) - EPA Merits Brief
2026-01-30 Docket documentIowa State Implementation Plan Revision for the 2015 Ozone National Ambient Air Quality Standards
2026-01-30 Docket documentNevada Cement Co. v. EPA No. 23-682 (9th Cir. July 3, 2023) - Stay Order
2026-01-30 Docket documentKansas Declaration of Adoption
2026-01-30 Docket documentAlabama et al. v. EPA No. 23-11173 (11th Cir. Aug. 17 2023) - Stay Order
2026-01-30 Docket documentEmissions AQ Modeling Data Drives Final GNP
2026-01-30 Docket documentNew Mexico’s Good Neighbor State Implementation Plan Certification for the 2015 Ozone National Ambient Air Quality Standard
2026-01-30 Docket documentEPD AQB Supp Info to EPA for 2015 Good Neighbor SIP
2026-01-30 Docket documentNV Clark Co 2015 Ozone iSIP Transmittal Letter
2026-01-30 Docket documentTsirigotis Memo Oct 2018 Considerations for Identifying Maintenance Receptors
2026-01-30 Docket documentNevada 2015 Ozone Transmittal Letter
2026-01-30 Docket documentPoint of Contact Information Correction
2026-01-30 Docket documentPage Memo Oct 2017 Info for Interstate Transport SIPs 2008 NAAQS
2026-01-30 Docket documentTsirigotis Memo March 2018 Information on Interstate Transport SIP Submissions
2026-01-30 Docket documentKansas Submittal Letter
2026-01-30 Docket documentNV Washoe Co 2015 Ozone iSIP Transmittal Letter
2026-01-30 Docket documentMemo to Docket on Transport Edison Electric Meeting 01-15-2026
2026-01-30 Docket documentKentucky 2019-01-11 2015 Ozone ISIP Final Submittal
2026-01-30 Docket documentPage Memo Sept 2013 Guidance on Infrastructure SIP Elements
2026-02-03 Docket documentCAMx MDA8 Model Performance Stats by Site 2016v3
2026-02-03 Docket document2016v3 projection factors 2023
2026-02-03 Docket document2016v3 projection factors 2026
2026-02-03 Docket documentNEEDS NEI xref 2016 2019stk 13 Apr 22
2026-02-03 Docket document2016v3 projection results
2026-02-03 Docket document2016v3 county monthly emissions summaries
2026-02-03 Docket document2016v3 Point source emissions summaries 2023 2026
2026-02-03 Docket document2016v3 State emissions summaries 2023-2026
2026-02-03 Docket documentContributions from NOx Emissions 2023gf
2026-02-03 Docket documentO3-PM-RH-Modeling Guidance 2018
2026-02-03 Docket documentNevada consent decrees summary

References

Page 1Download these results: CSV · JSON
APC shall not sell, trade, or otherwise exchange any Plant Miller excess SO2 emission allowances outside of the APC system 1/1/21 1) Settlement requires 95% removal efficiency for SO2 or 90% in the event that the unit combust a http://www2.e coal with sulfur content greater pa.gov/enforc than 1% by weight. 2) The ement/alabam settlements require APC to retire a-power$4,900,000 of SO2 emission companyallowances within 45 days of clean-air-actconsent decree entry. 3) EPA settlement assumed a retirement of 7, 538 SO2 allowances based on a current allowance price of $650. Minnkota Power Cooperative Beginning 1/01/2006, Minnkota shall not emit more than 31,000 tons of SO2/year, no more than 26,000 tons beginning 2011, no more than 11,500 tons beginning 1/01/2012. If Unit 3 is not operational by 12/31/2015, then beginning 1/01/2014, the plant wide emission shall not exceed 8,500. Unit 1 Install and 95% if wet continuously FGD, 90% if operate FGD North Dakota Unit 2 Design, upgrade, and continuously operate FGD Indiana Unit 1 North Dakota 12/31/11 Install and continuously operate Over-fire
research reportNot linked to a paper · refsec · cited link
WEPCO WEPCO shall comply with the following system wide average NOx emission rates and total NOx tonnage permissible: by 1/1/2005 an emission rate of 0.27 and 31,500 tons, by 1/1/2007 an emission rate of 0.19 and 23,400 tons, and by 1/1/2013 an emission rate of 0.17 and 17, 400 tons. For SO2 emissions, WEPCO will comply with: by 1/1/2005 an emission rate of 0.76 and 86,900 tons, by 1/1/2007 an emission rate of 0.61 and 74,400 tons, by 1/1/2008 an emission rate of 0.45 and 55,400 tons, and by 1/1/2013 an emission rate of 0.32 and 33,300 tons. Presque Isle Retire or install SO2 and NOx controls Install and continuously operate FGD (or approved equiv. tech) Install SCR (or approved tech) and continually operate Michigan Units Michigan Units 5, Install and operate low NOx burners 12/31/03 Michigan Units 7, Operate existing low NOx burners 12/31/05 Install Baghouse Michigan Unit 9 Operate existing low NOx burners 12/31/06 Install Baghouse 12/31/12 95% or 0.1 12/31/12 12/31/12 The provision did not specify an amount of SO2 allowances to be surrendered. It only provided that excess allowances resulting from compliance with
research reportNot linked to a paper · refsec
VEPCO The Total Permissible NOx Emissions (in tons) from VEPCO system are: 104,000 in 2003, 95,000 in 2004, 90,000 in 2005, 83,000 in 2006, 81,000 in 2007, 63,000 in 2008 – 2010, 54,000 in 2011, 50,000 in 2012, and 30,250 each year thereafter. Beginning 1/1/2013 they will have a system wide emission rate no greater than 0.15 lbs/mmBTU. Mount Storm Chesterfield Chesapeake Energy Clover Possum Point West Virginia Units Construct or 95% or 0.15 improve FGD Virginia Unit 4 Install and continuously operate FGD Virginia Unit 5 Construct or 95% or 0.13 improve FGD Virginia Unit 6 Construct or 95% or 0.13 improve FGD Virginia Units 3, Virginia Units 1, Virginia Units 3, Retire 0.11 01/01/08 Install and continuously operate SCR 01/01/13 10/12/12 Install and continuously operate SCR 01/01/12 01/01/10 Install and continuously operate SCR
research reportNot linked to a paper · refsec
NSR settlement provisions must be retired. Grainger Jeffries 2012
research reportNot linked to a paper · refsec
OHIO EDISON Ohio Edison shall achieve reductions of 2,483 tons NOx between 7/1/2005 and 12/31/2010 using any combination of: 1) low sulfur coal at Burger Units 4 and 5, 2) operating SCRs currently installed at Mansfield Units 1 – 3 during the months of October through April, and/or 3) emitting fewer tons than the Plant-Wide Annual Cap for NOx required for the Sammis Plant. Ohio Edison must reduce 24,600 tons system-wide of SO2 by 12/31/2010. No later than 8/11/2005, Ohio Edison shall install and operate low NOx burners on Sammis Units 1, 2,4,5,6, and 7 and overfired air on Sammis Units 1,2,3,6, and 7. No later than 12/1/2005, Ohio Edison shall install advanced combustion control optimization with software to minimize NOx emissions from Sammis Units 1 – 5. W.H. Sammis Plant Ohio Unit 1 Install Induct Scrubber (or 50% removal approved or 1.1 12/31/08 equiv. lbs/mmBTU control tech) Ohio Unit 2 Install Induct Scrubber (or 50% removal approved or 1.1 12/31/08 equiv. lbs/mmBTU control tech) Operate existing SNCR continuously 0.25 02/15/06 Unit 3 Install Induct Scrubber (or 50% removal approved or 1.1 12/31/08 equiv. lbs/mmBTU control tech) Operate low NOx burners and
research reportNot linked to a paper · refsec
Eastlake, another plant must achieve these reductions. Repower 12/31/11 with at least biomass fuel, up to 20% 12/31/11 low sulfur coal OR Retire by 12/31/2010
research reportNot linked to a paper · refsec
MIRANT 1,6 System-wide NOx Emission Annual Caps: 36,500 tons 2004; 33,840 tons 2005; 33,090 tons 2006; 28,920 tons 2007; 22,000 tons 2008; 19,650 tons 2009; 16,000 tons 2010 onward. System-wide NOx Emission Ozone Season Caps: 14,700 tons 2004; 13,340 tons 2005; 12,590 tons 2006; 10,190 tons 2007; 6,150 tons 2008 – 2009; 5,200 tons 2010 thereafter. Beginning on 5/1/2008, and continuing for each and every Ozone Season thereafter, the Mirant System shall not exceed a System-wide Ozone Season Emission Rate of 0.150 lbs/mmBTU NOx. Potomac River Plant Virginia Unit 1 Virginia Unit 2 Retire http://www2.e pa.gov/enforc ement/mirantclean-airsettlement 12/21/2012 Settlement Actions Retire/Repower Company and Plant State Virginia Unit Action Effective Date SO2 control Equipment NOx Control Percent Removal or Effective Rate Date Unit 3 Equipment Rate
research reportNot linked to a paper · refsec · cited link
FGD by 6/1/2010 if authorized by court to reject ownership interest in Morgantown Plant, or by no later than 36 months after they lose ownership interest of the Morgantown Plant. [Installed]
research reportNot linked to a paper · refsec
ILLINOIS POWER System-wide NOx Emission Annual Caps: 15,000 tons 2005; 14,000 tons 2006; 13,800 tons 2007 onward. System-wide SO2 Emission Annual Caps: 66,300 tons 2005 – 2006; 65,000 tons 2007; 62,000 tons 2008 – 2010; 57,000 tons 2011; 49,500 tons 2012; 29,000 tons 2013 onward. Illinois Baldwin Illinois Illinois Unit 1 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously Unit 2 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously Unit 3 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously 12/31/11 Operate OFA & existing SCR continuously 12/31/11 Operate OFA & existing SCR continuously 12/31/11 Operate OFA and/or low NOx burners Install & continuously 08/11/05 operate Baghouse 0.015 08/11/05 Install & continuously operate Baghouse 0.015 0.12 until Install & 12/30/12; 08/11/05
research reportNot linked to a paper · refsec
EW Brown Generating Station Kentucky Unit 3 Install FGD 97% or 0.100 0.07 12/31/12 Continuously operate ESP Annual SO2 cap is 31,998 tons through 2010, then 2,300 tons each year thereafter. Annual NOx cap is 4,072 tons. http://www2.e pa.gov/enforc ement/kentuck y-utilitiescompanyclean-air-actsettlement Salt River Project Agricultural Improvement and Power District (SRP) Arizona Unit 1 or Unit 2 Immediately begin
research reportNot linked to a paper · refsec · cited link
LNB by continuous Install and 0.32 prior 06/01/20 New FGD operation of continuously to SCR 09, SCR 95% or 0.08 installed by existing FGDs operate low NOx installation, 1/1/2012 on both units, burner and SCR 0.080 after 06/01/20 install new
research reportNot linked to a paper · refsec
FGD. Coronado Generating Station Arizona Unit 1 or Unit 2 Install new 95% or 0.08 01/01/13 Annual Cap (tons) Year Install and continuously operate low NOx burner 0.32 06/01/11 Optimization continuous operation of existing ESPs. Annual plant-wide NOx cap is 7,300 tons after 6/1/2014. http://www2.e pa.gov/enforc ement/saltriver-projectagricultureimprovementand-powerdistrictsettlement American Electric Power 145,000 Eastern System-Wide [Modified Limits for SO2] 113,000 110,000 102,000 2016-2018 2019-2021 2022-2025 http://www.ct.g ov/ag/lib/ag/pr ess_releases/ 2013/2013022 5_aep_cdmod .pdf 2026-2028 Settlement Actions Retire/Repower Company and Plant State Unit Action Effective Date SO2 control Equipment Percent Removal or Effective Rate Date 94,000 Annual Cap (tons) 450,000 450,000 420,000 350,000 Eastern System-Wide 340,000 Amos Effective Equipment Date 2010 96,000 Effective Date Allowance Restriction Retirement Restriction Effective Date Notes 2011 92,500 2012 92,500 2013 85,000 2014 260,000 2016 235,000 2017 85,000 85,000 75,000
research reportNot linked to a paper · refsec · cited link
FGD for 90% removal and update FGD for 98% removal by 2012 Unit 2 Continuously run current
research reportNot linked to a paper · refsec
FGD for 90% removal and update FGD for 98% removal by 2014 Indiana 0.25 12/31/20 Continuously operate ESP and achieve PM rate no greater than 0.007 by 6/1/12 2012 Continuously operate existing SCRs http://www2.epa.go v/enforcement/hoos ier-energy-ruralelectriccooperative-incsettlement Continuously operate ESP Annually surrender any NOx and SO2 allowances that Hoosier does not need in order to meet its regulatory obligations 0.12 Continuously operate ESP and achieve PM rate no greater than 0.007 by 6/1/13 2014 Northern Indiana Public Service Co. 95% by 01/01/11 97% by 01/01/14 (95% if Upgrade low sulfur coal only is existing FGD burned)
research reportNot linked to a paper · refsec · cited link
OFA & SCR 0.15 lbs/mmBTU by 12/31/10 0.13 lbs/mmBTU by 12/31/13 0.12 lbs/mmBTU by 12/31/15 lbs/mmBT U (0.015 if 12/31/20 Baghouse is installed) Bailly Indiana Units 7 & Michigan City Indiana Unit 12 12/31/2018 lbs/mmBTU
research reportNot linked to a paper · refsec
SNCR Continuously Continuously Operate the Low 0.120 0.015 Operate 07/16/14 05/31/16 NOx Burners, OFA lbs/mmBT lb/mmBTU Baghouses system and SCR http://www2.e pa.gov/enforc ement/minnes ota-powersettlement Continuously 0.160 0.30 Operate the ROFA 7/16/201 12/31/2015 lbs/mmBT systems and lbs/mmBTU Continuously
research reportNot linked to a paper · refsec · cited link
SNCR 07/16/14 Operate ESP lb/mmBTU Retire/Repo wer/Refuelin 12/31/2015 0.200 lb/mmBTU Laskin Minnesota Continuously Continuously Operate the ROFA 6/30/201 0.015 Operate 07/16/14 0.20 lb/mmBTU Baghouses lbs/mmBT
research reportNot linked to a paper · refsec
SO Allowances allocated to Allen Unit 1, Allen Unit 2, Buck Unit 3, Buck Unit 4, Buck Unit 5, Cliffside Unit 1, Cliffside Unit 2, https://www.ep a.gov/sites/pro duction/files/2 01509/documents/ duke-energyconsentdecree-civil- Settlement Actions Retire/Repower Company and Plant Dan River Riverbend SO2 control State Unit Action Effective Date North Carolina Unit 3 Retire 09/2015 North Carolina Unit 4 Retire 09/2015 North Carolina Unit 6 Retire 09/2015 North Carolina Unit 7 Retire 09/2015 Retire Continuously 12/31/2024 Operate the existing FGD North Carolina Unit 1 North Carolina Unit 2 Retire Allen Equipment Continuously 12/31/2024 Operate the existing FGD NOx Control Percent Removal or Effective Rate Date 0.120 lb/mmBTU
research reportNot linked to a paper · refsec · cited link
LN Concentric Firing Meets System Wide RACT New York Unit 1 Retired 2010 Install BACT
research reportNot linked to a paper · refsec