{"document":{"doc_id":139688,"source":"docket_item","org":"EPA","doc_type":"report","title":"EPA Base Case v.5.16 for 2015 Ozone NAAQS Transport NODA Using IPM Incremental Documentation","date":"2026-01-30","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2025-0192-0059","source_native_id":"EPA-HQ-OAR-2025-0192-0059","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2025-0192"],"rins":["RIN 2060-AW63"],"related":[{"doc_id":3240,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Interstate Transport Plan Review for the 2015 Ozone NAAQS","date":"2026-01-30"},{"doc_id":127389,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Meeting Documentation","date":"2026-01-30"},{"doc_id":127390,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EO 12866 Review Initiated Interim Changes","date":"2026-01-30"},{"doc_id":139673,"source":"docket_item","org":"EPA","doc_type":"data","title":"Final GNP O3 DVs Contributions","date":"2026-01-30"},{"doc_id":139675,"source":"docket_item","org":"EPA","doc_type":"data","title":"O3 Design Values and Contributions 2011en Modeling","date":"2026-01-30"},{"doc_id":139677,"source":"docket_item","org":"EPA","doc_type":"data","title":"Daily Contributions from Arkansas to Allegan 2023en Modeling","date":"2026-01-30"},{"doc_id":139678,"source":"docket_item","org":"EPA","doc_type":"report","title":"NV Washoe Co 2015 Ozone iSIP","date":"2026-01-30"},{"doc_id":139679,"source":"docket_item","org":"EPA","doc_type":"data","title":"O3 Design Values and Contributions 2016v2 Modeling","date":"2026-01-30"},{"doc_id":139681,"source":"docket_item","org":"EPA","doc_type":"report","title":"Kansas Air Quality State Implementation Plan Revision for the Implementation, Maintenance, and Enforcement of the 2015 Ozone (O3) National Ambient Air Quality Standards (NAAQS)","date":"2026-01-30"},{"doc_id":139682,"source":"docket_item","org":"EPA","doc_type":"report","title":"NV NDEP 2015 Ozone iSIP","date":"2026-01-30"},{"doc_id":139683,"source":"docket_item","org":"EPA","doc_type":"report","title":"Preparation of Emissions Inventories for the Version 6.3, 2011 Emissions Modeling Platform","date":"2026-01-30"},{"doc_id":139684,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Tsirigotis Memo Aug 2018 Analysis of Contribution Thresholds","date":"2026-01-30"},{"doc_id":139685,"source":"docket_item","org":"EPA","doc_type":"report","title":"Minnesota 2015 Ozone Infrastructure SIP","date":"2026-01-30"},{"doc_id":139686,"source":"docket_item","org":"EPA","doc_type":"report","title":"Updates to Emissions Inventories for the Version 6.3, 2011 Emissions Modeling Platform for the Year 2023","date":"2026-01-30"},{"doc_id":139687,"source":"docket_item","org":"EPA","doc_type":"data","title":"CAMx 2016v2 MDA8 O3 Model Performance Stats","date":"2026-01-30"},{"doc_id":139689,"source":"docket_item","org":"EPA","doc_type":"report","title":"NV Clark Co 2015 Ozone iSIP","date":"2026-01-30"},{"doc_id":147368,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Interstate Transport Phase Regulatory Text Changes","date":"2026-01-30"},{"doc_id":147369,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Meteorological Modeling for 2016","date":"2026-01-30"},{"doc_id":147370,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Kansas Public Participation","date":"2026-01-30"},{"doc_id":153725,"source":"docket_item","org":"EPA","doc_type":"other","title":"Allete Inc. dba Minnesota Power et al. v. EPA No. 23-1776 (8th Cir. July 5, 2023) - Stay Order","date":"2026-01-30"},{"doc_id":153726,"source":"docket_item","org":"EPA","doc_type":"other","title":"Kansas Authorizing Statutes","date":"2026-01-30"},{"doc_id":153727,"source":"docket_item","org":"EPA","doc_type":"other","title":"Alabama 127 6/21/2022 Submittal For Ozone 2015 ISIP","date":"2026-01-30"},{"doc_id":153728,"source":"docket_item","org":"EPA","doc_type":"other","title":"Kentucky et al. v. EPA Nos. 23-3216 and 23-3225 (6th Cir. 2024) - Opinion","date":"2026-01-30"},{"doc_id":153729,"source":"docket_item","org":"EPA","doc_type":"other","title":"Kentucky et al. v. EPA Nos. 23-3216 and 23-3225 (6th Cir. Jan. 29 2024) - EPA Merits Brief Petition for Review of Final Agency Action of the United States Environmental Protection Agency","date":"2026-01-30"},{"doc_id":153730,"source":"docket_item","org":"EPA","doc_type":"other","title":"Mississippi 2015 Ozone Infrastructure SIP Prongs 1 and 2","date":"2026-01-30"},{"doc_id":153731,"source":"docket_item","org":"EPA","doc_type":"other","title":"Nevada Cement Co. v. EPA No. 23-682 (9th Cir. Dec. 17, 2024) - Stay Lift","date":"2026-01-30"},{"doc_id":153732,"source":"docket_item","org":"EPA","doc_type":"other","title":"Kansas Submission Form","date":"2026-01-30"},{"doc_id":153733,"source":"docket_item","org":"EPA","doc_type":"other","title":"Texas et al. v. EPA No. 23-60069 (5th Cir. 2025) - Opinion","date":"2026-01-30"},{"doc_id":153734,"source":"docket_item","org":"EPA","doc_type":"other","title":"Arizona State Implementation Plan Revision under Clean Air Act Sections 110(a)(1) and 110(a)(2) for the 2015 Ozone National Ambient Air Quality Standards","date":"2026-01-30"},{"doc_id":153735,"source":"docket_item","org":"EPA","doc_type":"other","title":"NMED 2015 Ozone Transport Certification Adoption Order Hearing Transcript","date":"2026-01-30"},{"doc_id":153736,"source":"docket_item","org":"EPA","doc_type":"other","title":"Texas et al. v. EPA No. 23-60069 (5th Cir. Aug. 15, 2023) - EPA Merits Brief","date":"2026-01-30"},{"doc_id":153737,"source":"docket_item","org":"EPA","doc_type":"other","title":"Iowa State Implementation Plan Revision for the 2015 Ozone National Ambient Air Quality Standards","date":"2026-01-30"},{"doc_id":153739,"source":"docket_item","org":"EPA","doc_type":"other","title":"Nevada Cement Co. v. EPA No. 23-682 (9th Cir. July 3, 2023) - Stay Order","date":"2026-01-30"},{"doc_id":153740,"source":"docket_item","org":"EPA","doc_type":"other","title":"Kansas Declaration of Adoption","date":"2026-01-30"},{"doc_id":153741,"source":"docket_item","org":"EPA","doc_type":"other","title":"Alabama et al. v. EPA No. 23-11173 (11th Cir. Aug. 17 2023) - Stay Order","date":"2026-01-30"},{"doc_id":153742,"source":"docket_item","org":"EPA","doc_type":"other","title":"Emissions AQ Modeling Data Drives Final GNP","date":"2026-01-30"},{"doc_id":157095,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"New Mexico’s Good Neighbor State Implementation Plan Certification for the 2015 Ozone National Ambient Air Quality Standard","date":"2026-01-30"},{"doc_id":157096,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"EPD AQB Supp Info to EPA for 2015 Good Neighbor SIP","date":"2026-01-30"},{"doc_id":157097,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"NV Clark Co 2015 Ozone iSIP Transmittal Letter","date":"2026-01-30"},{"doc_id":157098,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Tsirigotis Memo Oct 2018 Considerations for Identifying Maintenance Receptors","date":"2026-01-30"},{"doc_id":157099,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Nevada 2015 Ozone Transmittal Letter","date":"2026-01-30"},{"doc_id":157100,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Point of Contact Information Correction","date":"2026-01-30"},{"doc_id":157101,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Page Memo Oct 2017 Info for Interstate Transport SIPs 2008 NAAQS","date":"2026-01-30"},{"doc_id":157103,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Tsirigotis Memo March 2018 Information on Interstate Transport SIP Submissions","date":"2026-01-30"},{"doc_id":157104,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Kansas Submittal Letter","date":"2026-01-30"},{"doc_id":157105,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"NV Washoe Co 2015 Ozone iSIP Transmittal Letter","date":"2026-01-30"},{"doc_id":157106,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memo to Docket on Transport Edison Electric Meeting 01-15-2026","date":"2026-01-30"},{"doc_id":157107,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Kentucky 2019-01-11 2015 Ozone ISIP Final Submittal","date":"2026-01-30"},{"doc_id":157108,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Page Memo Sept 2013 Guidance on Infrastructure SIP Elements","date":"2026-01-30"},{"doc_id":139655,"source":"docket_item","org":"EPA","doc_type":"data","title":"CAMx MDA8 Model Performance Stats by Site 2016v3","date":"2026-02-03"},{"doc_id":139656,"source":"docket_item","org":"EPA","doc_type":"data","title":"2016v3 projection factors 2023","date":"2026-02-03"},{"doc_id":139659,"source":"docket_item","org":"EPA","doc_type":"data","title":"2016v3 projection factors 2026","date":"2026-02-03"},{"doc_id":139661,"source":"docket_item","org":"EPA","doc_type":"data","title":"NEEDS NEI xref 2016 2019stk 13 Apr 22","date":"2026-02-03"},{"doc_id":139663,"source":"docket_item","org":"EPA","doc_type":"data","title":"2016v3 projection results","date":"2026-02-03"},{"doc_id":139665,"source":"docket_item","org":"EPA","doc_type":"data","title":"2016v3 county monthly emissions summaries","date":"2026-02-03"},{"doc_id":139667,"source":"docket_item","org":"EPA","doc_type":"data","title":"2016v3 Point source emissions summaries 2023 2026","date":"2026-02-03"},{"doc_id":139669,"source":"docket_item","org":"EPA","doc_type":"data","title":"2016v3 State emissions summaries 2023-2026","date":"2026-02-03"},{"doc_id":139671,"source":"docket_item","org":"EPA","doc_type":"data","title":"Contributions from NOx Emissions 2023gf","date":"2026-02-03"},{"doc_id":147367,"source":"docket_item","org":"EPA","doc_type":"publication","title":"O3-PM-RH-Modeling Guidance 2018","date":"2026-02-03"},{"doc_id":153721,"source":"docket_item","org":"EPA","doc_type":"other","title":"Nevada consent decrees summary","date":"2026-02-03"}],"references":[{"citation_id":943339,"raw_reference":"APC shall not sell, trade, or otherwise exchange any Plant Miller excess SO2 emission allowances outside of the APC system 1/1/21 1) Settlement requires 95% removal efficiency for SO2 or 90% in the event that the unit combust a http://www2.e coal with sulfur content greater pa.gov/enforc than 1% by weight. 2) The ement/alabam settlements require APC to retire a-power$4,900,000 of SO2 emission companyallowances within 45 days of clean-air-actconsent decree entry. 3) EPA settlement assumed a retirement of 7, 538 SO2 allowances based on a current allowance price of $650. Minnkota Power Cooperative Beginning 1/01/2006, Minnkota shall not emit more than 31,000 tons of SO2/year, no more than 26,000 tons beginning 2011, no more than 11,500 tons beginning 1/01/2012. If Unit 3 is not operational by 12/31/2015, then beginning 1/01/2014, the plant wide emission shall not exceed 8,500. Unit 1 Install and 95% if wet continuously FGD, 90% if operate FGD North Dakota Unit 2 Design, upgrade, and continuously operate FGD Indiana Unit 1 North Dakota 12/31/11 Install and continuously operate Over-fire","cited_authors":"APC shall not sell, trade, or otherwise exchange any Plant Miller excess SO2 emission allowances outside of the APC system 1/1/21 1) Settlement requires 95% removal efficiency for SO2 or 90% in the event that the unit combust a http://www2.e coal with sulfur content greater pa.gov/enforc than 1% by weight. 2) The ement/alabam settlements require APC to retire a-power$4,900,000 of SO2 emission companyallowances within 45 days of clean-air-actconsent decree entry. 3) EPA settlement assumed a retirement of 7, 538 SO2 allowances based on a current allowance price of $650. Minnkota Power Cooperative Beginning 1/01/2006, Minnkota shall not emit more than 31,000 tons of SO2/year, no more than 26,000 tons beginning","cited_year":"2011","cited_title":"no more than 11,500 tons beginning 1/01/2012","cited_venue":null,"cited_doi":null,"cited_url":"http://www2.e","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943340,"raw_reference":"WEPCO WEPCO shall comply with the following system wide average NOx emission rates and total NOx tonnage permissible: by 1/1/2005 an emission rate of 0.27 and 31,500 tons, by 1/1/2007 an emission rate of 0.19 and 23,400 tons, and by 1/1/2013 an emission rate of 0.17 and 17, 400 tons. For SO2 emissions, WEPCO will comply with: by 1/1/2005 an emission rate of 0.76 and 86,900 tons, by 1/1/2007 an emission rate of 0.61 and 74,400 tons, by 1/1/2008 an emission rate of 0.45 and 55,400 tons, and by 1/1/2013 an emission rate of 0.32 and 33,300 tons. Presque Isle Retire or install SO2 and NOx controls Install and continuously operate FGD (or approved equiv. tech) Install SCR (or approved tech) and continually operate Michigan Units Michigan Units 5, Install and operate low NOx burners 12/31/03 Michigan Units 7, Operate existing low NOx burners 12/31/05 Install Baghouse Michigan Unit 9 Operate existing low NOx burners 12/31/06 Install Baghouse 12/31/12 95% or 0.1 12/31/12 12/31/12 The provision did not specify an amount of SO2 allowances to be surrendered. It only provided that excess allowances resulting from compliance with","cited_authors":null,"cited_year":null,"cited_title":"WEPCO WEPCO shall comply with the following system wide average NOx emission rates and total NOx tonnage permissible: by 1/1/2005 an emission rate of 0.27 and 31,500 tons, by 1/1/2007 an emission rate of 0.19 and 23,400 tons, and by 1/1/2013 an emission rate of 0.17 and 17, 400 tons","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943341,"raw_reference":"VEPCO The Total Permissible NOx Emissions (in tons) from VEPCO system are: 104,000 in 2003, 95,000 in 2004, 90,000 in 2005, 83,000 in 2006, 81,000 in 2007, 63,000 in 2008 – 2010, 54,000 in 2011, 50,000 in 2012, and 30,250 each year thereafter. Beginning 1/1/2013 they will have a system wide emission rate no greater than 0.15 lbs/mmBTU. Mount Storm Chesterfield Chesapeake Energy Clover Possum Point West Virginia Units Construct or 95% or 0.15 improve FGD Virginia Unit 4 Install and continuously operate FGD Virginia Unit 5 Construct or 95% or 0.13 improve FGD Virginia Unit 6 Construct or 95% or 0.13 improve FGD Virginia Units 3, Virginia Units 1, Virginia Units 3, Retire 0.11 01/01/08 Install and continuously operate SCR 01/01/13 10/12/12 Install and continuously operate SCR 01/01/12 01/01/10 Install and continuously operate SCR","cited_authors":"VEPCO The Total Permissible NOx Emissions (in tons) from VEPCO system are: 104,000 in","cited_year":"2003","cited_title":"95,000 in 2004, 90,000 in 2005, 83,000 in 2006, 81,000 in 2007, 63,000 in 2008 – 2010, 54,000 in 2011, 50,000 in 2012, and 30,250 each year thereafter","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943342,"raw_reference":"NSR settlement provisions must be retired. Grainger Jeffries 2012","cited_authors":null,"cited_year":null,"cited_title":"NSR settlement provisions must be retired","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943343,"raw_reference":"OHIO EDISON Ohio Edison shall achieve reductions of 2,483 tons NOx between 7/1/2005 and 12/31/2010 using any combination of: 1) low sulfur coal at Burger Units 4 and 5, 2) operating SCRs currently installed at Mansfield Units 1 – 3 during the months of October through April, and/or 3) emitting fewer tons than the Plant-Wide Annual Cap for NOx required for the Sammis Plant. Ohio Edison must reduce 24,600 tons system-wide of SO2 by 12/31/2010. No later than 8/11/2005, Ohio Edison shall install and operate low NOx burners on Sammis Units 1, 2,4,5,6, and 7 and overfired air on Sammis Units 1,2,3,6, and 7. No later than 12/1/2005, Ohio Edison shall install advanced combustion control optimization with software to minimize NOx emissions from Sammis Units 1 – 5. W.H. Sammis Plant Ohio Unit 1 Install Induct Scrubber (or 50% removal approved or 1.1 12/31/08 equiv. lbs/mmBTU control tech) Ohio Unit 2 Install Induct Scrubber (or 50% removal approved or 1.1 12/31/08 equiv. lbs/mmBTU control tech) Operate existing SNCR continuously 0.25 02/15/06 Unit 3 Install Induct Scrubber (or 50% removal approved or 1.1 12/31/08 equiv. lbs/mmBTU control tech) Operate low NOx burners and","cited_authors":null,"cited_year":null,"cited_title":"OHIO EDISON Ohio Edison shall achieve reductions of 2,483 tons NOx between 7/1/2005 and 12/31/2010 using any combination of: 1) low sulfur coal at Burger Units 4 and 5, 2) operating SCRs currently installed at Mansfield Units 1 – 3 during the months of October through April, and/or 3) emitting fewer tons than the Plant-Wide Annual Cap for NOx required for the Sammis Plant","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943344,"raw_reference":"Eastlake, another plant must achieve these reductions. Repower 12/31/11 with at least biomass fuel, up to 20% 12/31/11 low sulfur coal OR Retire by 12/31/2010","cited_authors":null,"cited_year":null,"cited_title":"Eastlake, another plant must achieve these reductions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943345,"raw_reference":"MIRANT 1,6 System-wide NOx Emission Annual Caps: 36,500 tons 2004; 33,840 tons 2005; 33,090 tons 2006; 28,920 tons 2007; 22,000 tons 2008; 19,650 tons 2009; 16,000 tons 2010 onward. System-wide NOx Emission Ozone Season Caps: 14,700 tons 2004; 13,340 tons 2005; 12,590 tons 2006; 10,190 tons 2007; 6,150 tons 2008 – 2009; 5,200 tons 2010 thereafter. Beginning on 5/1/2008, and continuing for each and every Ozone Season thereafter, the Mirant System shall not exceed a System-wide Ozone Season Emission Rate of 0.150 lbs/mmBTU NOx. Potomac River Plant Virginia Unit 1 Virginia Unit 2 Retire http://www2.e pa.gov/enforc ement/mirantclean-airsettlement 12/21/2012 Settlement Actions Retire/Repower Company and Plant State Virginia Unit Action Effective Date SO2 control Equipment NOx Control Percent Removal or Effective Rate Date Unit 3 Equipment Rate","cited_authors":null,"cited_year":null,"cited_title":"MIRANT 1,6 System-wide NOx Emission Annual Caps: 36,500 tons 2004; 33,840 tons 2005; 33,090 tons 2006; 28,920 tons 2007; 22,000 tons 2008; 19,650 tons 2009; 16,000 tons 2010 onward","cited_venue":null,"cited_doi":null,"cited_url":"http://www2.e","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943346,"raw_reference":"FGD by 6/1/2010 if authorized by court to reject ownership interest in Morgantown Plant, or by no later than 36 months after they lose ownership interest of the Morgantown Plant. [Installed]","cited_authors":null,"cited_year":null,"cited_title":"FGD by 6/1/2010 if authorized by court to reject ownership interest in Morgantown Plant, or by no later than 36 months after they lose ownership interest of the Morgantown Plant","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943347,"raw_reference":"ILLINOIS POWER System-wide NOx Emission Annual Caps: 15,000 tons 2005; 14,000 tons 2006; 13,800 tons 2007 onward. System-wide SO2 Emission Annual Caps: 66,300 tons 2005 – 2006; 65,000 tons 2007; 62,000 tons 2008 – 2010; 57,000 tons 2011; 49,500 tons 2012; 29,000 tons 2013 onward. Illinois Baldwin Illinois Illinois Unit 1 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously Unit 2 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously Unit 3 Install wet or dry FGD (or approved equiv. alt. tech) & operate continuously 12/31/11 Operate OFA & existing SCR continuously 12/31/11 Operate OFA & existing SCR continuously 12/31/11 Operate OFA and/or low NOx burners Install & continuously 08/11/05 operate Baghouse 0.015 08/11/05 Install & continuously operate Baghouse 0.015 0.12 until Install & 12/30/12; 08/11/05","cited_authors":null,"cited_year":null,"cited_title":"ILLINOIS POWER System-wide NOx Emission Annual Caps: 15,000 tons 2005; 14,000 tons 2006; 13,800 tons 2007 onward","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943348,"raw_reference":"EW Brown Generating Station Kentucky Unit 3 Install FGD 97% or 0.100 0.07 12/31/12 Continuously operate ESP Annual SO2 cap is 31,998 tons through 2010, then 2,300 tons each year thereafter. Annual NOx cap is 4,072 tons. http://www2.e pa.gov/enforc ement/kentuck y-utilitiescompanyclean-air-actsettlement Salt River Project Agricultural Improvement and Power District (SRP) Arizona Unit 1 or Unit 2 Immediately begin","cited_authors":"EW Brown Generating Station Kentucky Unit 3 Install FGD 97% or 0.100 0.07 12/31/12 Continuously operate ESP Annual SO2 cap is 31,998 tons through","cited_year":"2010","cited_title":"then 2,300 tons each year thereafter","cited_venue":null,"cited_doi":null,"cited_url":"http://www2.e","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943349,"raw_reference":"LNB by continuous Install and 0.32 prior 06/01/20 New FGD operation of continuously to SCR 09, SCR 95% or 0.08 installed by existing FGDs operate low NOx installation, 1/1/2012 on both units, burner and SCR 0.080 after 06/01/20 install new","cited_authors":null,"cited_year":null,"cited_title":"LNB by continuous Install and 0.32 prior 06/01/20 New FGD operation of continuously to SCR 09, SCR 95% or 0.08 installed by existing FGDs operate low NOx installation, 1/1/2012 on both units, burner and SCR 0.080 after 06/01/20 install new","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943350,"raw_reference":"FGD. Coronado Generating Station Arizona Unit 1 or Unit 2 Install new 95% or 0.08 01/01/13 Annual Cap (tons) Year Install and continuously operate low NOx burner 0.32 06/01/11 Optimization continuous operation of existing ESPs. Annual plant-wide NOx cap is 7,300 tons after 6/1/2014. http://www2.e pa.gov/enforc ement/saltriver-projectagricultureimprovementand-powerdistrictsettlement American Electric Power 145,000 Eastern System-Wide [Modified Limits for SO2] 113,000 110,000 102,000 2016-2018 2019-2021 2022-2025 http://www.ct.g ov/ag/lib/ag/pr ess_releases/ 2013/2013022 5_aep_cdmod .pdf 2026-2028 Settlement Actions Retire/Repower Company and Plant State Unit Action Effective Date SO2 control Equipment Percent Removal or Effective Rate Date 94,000 Annual Cap (tons) 450,000 450,000 420,000 350,000 Eastern System-Wide 340,000 Amos Effective Equipment Date 2010 96,000 Effective Date Allowance Restriction Retirement Restriction Effective Date Notes 2011 92,500 2012 92,500 2013 85,000 2014 260,000 2016 235,000 2017 85,000 85,000 75,000","cited_authors":null,"cited_year":null,"cited_title":"FGD. Coronado Generating Station Arizona Unit 1 or Unit 2 Install new 95% or 0.08 01/01/13 Annual Cap (tons) Year Install and continuously operate low NOx burner 0.32 06/01/11 Optimization continuous operation of existing ESPs","cited_venue":null,"cited_doi":null,"cited_url":"http://www2.e","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943351,"raw_reference":"FGD for 90% removal and update FGD for 98% removal by 2012 Unit 2 Continuously run current","cited_authors":null,"cited_year":null,"cited_title":"FGD for 90% removal and update FGD for 98% removal by 2012 Unit 2 Continuously run current","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943352,"raw_reference":"FGD for 90% removal and update FGD for 98% removal by 2014 Indiana 0.25 12/31/20 Continuously operate ESP and achieve PM rate no greater than 0.007 by 6/1/12 2012 Continuously operate existing SCRs http://www2.epa.go v/enforcement/hoos ier-energy-ruralelectriccooperative-incsettlement Continuously operate ESP Annually surrender any NOx and SO2 allowances that Hoosier does not need in order to meet its regulatory obligations 0.12 Continuously operate ESP and achieve PM rate no greater than 0.007 by 6/1/13 2014 Northern Indiana Public Service Co. 95% by 01/01/11 97% by 01/01/14 (95% if Upgrade low sulfur coal only is existing FGD burned)","cited_authors":null,"cited_year":null,"cited_title":"FGD for 90% removal and update FGD for 98% removal by 2014 Indiana 0.25 12/31/20 Continuously operate ESP and achieve PM rate no greater than 0.007 by 6/1/12 2012 Continuously operate existing SCRs http://www2.epa.go v/enforcement/hoos ier-energy-ruralelectriccooperative-incsettlement Continuously operate ESP Annually surrender any NOx and SO2 allowances that Hoosier does not need in order to meet its regulatory obligations 0.12 Continuously operate ESP and achieve PM rate no greater than 0.007 by 6/1/13 2014 Northern Indiana Public Service Co","cited_venue":null,"cited_doi":null,"cited_url":"http://www2.epa.go","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943353,"raw_reference":"OFA & SCR 0.15 lbs/mmBTU by 12/31/10 0.13 lbs/mmBTU by 12/31/13 0.12 lbs/mmBTU by 12/31/15 lbs/mmBT U (0.015 if 12/31/20 Baghouse is installed) Bailly Indiana Units 7 & Michigan City Indiana Unit 12 12/31/2018 lbs/mmBTU","cited_authors":null,"cited_year":null,"cited_title":"OFA & SCR 0.15 lbs/mmBTU by 12/31/10 0.13 lbs/mmBTU by 12/31/13 0.12 lbs/mmBTU by 12/31/15 lbs/mmBT U (0.015 if 12/31/20 Baghouse is installed) Bailly Indiana Units 7 & Michigan City Indiana Unit 12 12/31/2018 lbs/mmBTU","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943354,"raw_reference":"SNCR Continuously Continuously Operate the Low 0.120 0.015 Operate 07/16/14 05/31/16 NOx Burners, OFA lbs/mmBT lb/mmBTU Baghouses system and SCR http://www2.e pa.gov/enforc ement/minnes ota-powersettlement Continuously 0.160 0.30 Operate the ROFA 7/16/201 12/31/2015 lbs/mmBT systems and lbs/mmBTU Continuously","cited_authors":null,"cited_year":null,"cited_title":"SNCR Continuously Continuously Operate the Low 0.120 0.015 Operate 07/16/14 05/31/16 NOx Burners, OFA lbs/mmBT lb/mmBTU Baghouses system and SCR http://www2.e pa.gov/enforc ement/minnes ota-powersettlement Continuously 0.160 0.30 Operate the ROFA 7/16/201 12/31/2015 lbs/mmBT systems and lbs/mmBTU Continuously","cited_venue":null,"cited_doi":null,"cited_url":"http://www2.e","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943355,"raw_reference":"SNCR 07/16/14 Operate ESP lb/mmBTU Retire/Repo wer/Refuelin 12/31/2015 0.200 lb/mmBTU Laskin Minnesota Continuously Continuously Operate the ROFA 6/30/201 0.015 Operate 07/16/14 0.20 lb/mmBTU Baghouses lbs/mmBT","cited_authors":null,"cited_year":null,"cited_title":"SNCR 07/16/14 Operate ESP lb/mmBTU Retire/Repo wer/Refuelin 12/31/2015 0.200 lb/mmBTU Laskin Minnesota Continuously Continuously Operate the ROFA 6/30/201 0.015 Operate 07/16/14 0.20 lb/mmBTU Baghouses lbs/mmBT","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943356,"raw_reference":"SO Allowances allocated to Allen Unit 1, Allen Unit 2, Buck Unit 3, Buck Unit 4, Buck Unit 5, Cliffside Unit 1, Cliffside Unit 2, https://www.ep a.gov/sites/pro duction/files/2 01509/documents/ duke-energyconsentdecree-civil- Settlement Actions Retire/Repower Company and Plant Dan River Riverbend SO2 control State Unit Action Effective Date North Carolina Unit 3 Retire 09/2015 North Carolina Unit 4 Retire 09/2015 North Carolina Unit 6 Retire 09/2015 North Carolina Unit 7 Retire 09/2015 Retire Continuously 12/31/2024 Operate the existing FGD North Carolina Unit 1 North Carolina Unit 2 Retire Allen Equipment Continuously 12/31/2024 Operate the existing FGD NOx Control Percent Removal or Effective Rate Date 0.120 lb/mmBTU","cited_authors":null,"cited_year":null,"cited_title":"SO Allowances allocated to Allen Unit 1, Allen Unit 2, Buck Unit 3, Buck Unit 4, Buck Unit 5, Cliffside Unit 1, Cliffside Unit 2, https://www.ep a.gov/sites/pro duction/files/2 01509/documents/ duke-energyconsentdecree-civil- Settlement Actions Retire/Repower Company and Plant Dan River Riverbend SO2 control State Unit Action Effective Date North Carolina Unit 3 Retire 09/2015 North Carolina Unit 4 Retire 09/2015 North Carolina Unit 6 Retire 09/2015 North Carolina Unit 7 Retire 09/2015 Retire Continuously 12/31/2024 Operate the existing FGD North Carolina Unit 1 North Carolina Unit 2 Retire Allen Equipment Continuously 12/31/2024 Operate the existing FGD NOx Control Percent Removal or Effective Rate Date 0.120 lb/mmBTU","cited_venue":null,"cited_doi":null,"cited_url":"https://www.ep","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943357,"raw_reference":"LN Concentric Firing Meets System Wide RACT New York Unit 1 Retired 2010 Install BACT","cited_authors":null,"cited_year":null,"cited_title":"LN Concentric Firing Meets System Wide RACT New York Unit 1 Retired 2010 Install BACT","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}