Policy Replication

Additional PRIA References

Regulatory impact analysis2026-08-07 · PHMSA · regulatory_impact_analysis · PHMSA-2025-0019-0043
RIN 2137-AF44 · Docket PHMSA-2025-0019

Other documents for the same rulemaking (all, by stage)

2025-05-21 Federal RegisterPipeline Safety: Repair Criteria for Hazardous Liquid and Gas Transmission Pipelines
2026-06-12 Docket documentEO 12866 Meeting-API and LEPA, June 10, 2026
2026-07-07 Docket documentRepair Criteria NPRM-Gas Transmission and Hazardous Liquid Annual Report Forms and Instructions
2026-07-08 Federal RegisterPipeline Safety: Repair Criteria for Hazardous Liquid and Gas Transmission Pipelines
2026-07-08 Regulatory impact analysisPreliminary Regulatory Impact Analysis (PRIA)
2026-07-08 Docket documentDraft Environmental Assessment (DEA)
2026-07-14 Docket documentSubstantive Changes to NPRM during OIRA Review
2026-11-16 Docket documentBriefing Slides-Gas and Liquid Pipeline Advisory Committees-Dec 2-3

References: 373 extracted, 128 linked to papers

Page 7Download these results: CSV · JSON
Association of American Railroads (AAR). 2016b. What We Haul: Crude Oil by Rail.
web pageNot linked to a paper · References · cited link
Association of American Railroads (AAR). 2015. U.S. Rail Crude Oil Traffic.
datasetNot linked to a paper · References
California Department of Fish and Wildlife (California DFW). 2015. Refugio Beach Oil Spill Natural Resource Damage Assessment Update: November 2015.
government reportNot linked to a paper · References
Eifling, S. 2013. The Forgotten in Mayflower. Arkansas Times, August 08, 2013.
newsNot linked to a paper · References · cited link
Enbridge, Inc. 2015. 2014 Annual Report.
otherNot linked to a paper · References
Enbridge, Inc. 2014. Annual Report: 2013.
otherNot linked to a paper · References
Fehling, D. 2012. Moving Crude Oil Relies on Aging Pipeline System. State Impact: A Reporting Project of NPR Member Stations.
newsNot linked to a paper · References · cited link
Frittelli, J. A. Andrews, P.W. Parfomak, R. Pirog, J.L. Ramseur, and M. Ratner. 2014. U.S. Rail Transportation of Crude Oil: Background and Issues for Congress. Congressional Research Service. 7-5700.
Frosch, D. 2013. Oil Spill In North Dakota Raises Detection Concerns, New York Times, October 23, 2013.
newsNot linked to a paper · References · cited link
Hallenbeck, M.E., A. Goodchild, and J. Drescher. 2014. Travel Costs Associated with Flood Closures of State Highways Near Centralia/Chehalis, Washington. Washington Transportation Center (TRACUW).
Holland, M. 2010. Trans-Alaska Pipeline Spill Toll 5,000 Barrels. AND.Com, May 28, 2010.
newsNot linked to a paper · References · cited link
Nalder, E. 2010. Old Pipelines Are a Hidden Menace. Houston Chronicle, November 15, 2010.
newsNot linked to a paper · References · cited link
National Oceanic and Atmospheric Administration (NOAA). 2015. 10 Years After Being Hit by Hurricane Katrina, Seeing an Oiled Marsh at the Center of an Experiment in Oil Cleanup.
web pageNot linked to a paper · References · cited link
Pipeline and Hazardous Materials Safety Administration (PHMSA). 2016b. Hazardous Liquid Pipeline Miles and Tanks by Commodity.
datasetNot linked to a paper · References · cited link
Pipeline and Hazardous Materials Safety Administration (PHMSA). 2012. Emergency Response Guidebook.
otherNot linked to a paper · References
Plains All American Pipeline LP. 2016. Form 10-K (Annual Report) Filed 02/25/16 for the Period Ending 12/31/15.
otherNot linked to a paper · References
United States Energy Information Administration (U.S. EIA). 2016b. U.S. Crude Oil First Purchase Price. Release date 4/1/2016.
datasetNot linked to a paper · References · cited link
United States Energy Information Administration (U.S. EIA). 2015. Petroleum & Other Liquids: Refinery Receipts of Crude Oil by Method of Transportation. Release date 6/19/2015.
datasetNot linked to a paper · References · cited link
United States Environmental Protection Agency (U.S. EPA). 2016. Sensitivity of Freshwater Habitats.
web pageNot linked to a paper · References · cited link
United States Fish and Wildlife Service (USFWS) et al. 2015. Final Damage Assessment and Restoration Plan/Environmental Assessment for the July 25-26, 2010 Enbridge Line 6B Oil Discharges near Marshall, MI.
government reportNot linked to a paper · References
Utah Department of Environmental Quality (UDEQ). 2012b. Human Health Risk Assessment: Red Butte Creek, Salt Lake City, Utah. Prepared by McDaniel Lambert, Inc.
government reportNot linked to a paper · References
Young, L. 2014. Crude oil spills are bigger from trains than pipelines. Global News.
newsNot linked to a paper · References · cited link
Schleifstein, M. 2010. Extent of Oil Spills from Hurricanes Katrina and Rita is Still Being Assessed. The Times-Picayune, August 19, 2010.
newsNot linked to a paper · fn 73 · cited link
Merten, A.A. and C.B. Henry. 2008. Decision-Making Process to Use In-Situ Burning to Restore an Oiled Intermediate Marsh Following Hurricanes Katrina and Rita.
API RP 1183, Assessment and Management of Dents in Pipelines
otherNot linked to a paper · Section I, ECA methods (Part 7 text)
GPAC Meeting Tr. 65 –80 (Mar. 28, 2018), https://primis.phmsa.dot.gov/meetings/FilGet.mtg?fil=972.
otherNot linked to a paper · fn 46 · cited link
Merriam-Webster dictionary, cluster (last visited Oct. 30, 2020)
web pageNot linked to a paper · Part VI.A, fn 63 · cited link
https://www.merriam-webster.com/dictionary/group (last visited Oct. 30, 2020)
web pageNot linked to a paper · Part VI.A, fn 65 · cited link
Tr. of Technical Pipeline Safety Standards Committee, at 248:8-9 (June 24, 1970)
otherNot linked to a paper · Part VI.A, fn 60 · cited link
Pipeline Investigation Report NTSB/PIR-22/02, Enbridge Inc. Natural Gas Transmission Pipeline Rupture and Fire, Danville, Kentucky, August 1, 2019
government reportNot linked to a paper · NTSB report following the Part 7 document
Kiefner and Associates, Inc. 2007, Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines
research reportNot linked to a paper · NTSB Analysis Section 2.2
Sillars, D. N. and J. Riedl, "Framework Model for Determining Incentive and Disincentive Amounts," Transportation Research Record No. 2040, Journal of the Transportation Research Board, Transportation Research Board, Washington, D.C., 2007.
journal articleFramework Model for Determining Incentive and Disincentive Amounts (2007) · Chapter 4.4.4 (Sillars 2007 cited in text)
Ullman, G. L., M. D. Finley, J.E. Bryden, R. Srinivasan and F.M. Council, Traffic Safety Evaluation of Nighttime and Daytime Work Zones, NCHRP Report 627, National Cooperative Highway Research Program, Transportation Research Board, Washington, DC, 2008.
research reportTraffic Safety Evaluation of Nighttime and Daytime Work Zones (2008) · 5.1.3.4 Work Zone Crash Rate
A. Atalah, “The Ground Vibration Associated With Pipe Bursting in Rock Conditions,” paper presented at North American Society for Trenchless Technology, NO-DIG 2004, New Orleans, Louisiana, March 22-24, 2004.
conference paperNot linked to a paper · fn 49
PHMSA report from 2007, No. 05-12R, Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines
research reportNot linked to a paper · Section 1.7.5.3
Pacific Gas and Electric Company, Pipeline Public Awareness Plan, Procedure No. RMP-12, dated January 26, 2010.
otherNot linked to a paper · fn 95
Wildenthal, M.T. and J.L. Buffington, “Estimated Construction Period Impact of Widening State Highway 21, in Caldwell, Texas,” Transportation Research Record No. 1559, Journal of the Transportation Research Board, Washington, D.C, 1996.
journal articleEstimated Construction Period Impact of Widening State Highway 21 in Caldwell, Texas (1996) · 2.7.2 Business and Local Community Impacts
Traffic Monitoring Guide, Report No FHWA-PL-01-021, Office of Highway Policy Information, Federal Highway Administration, Washington, DC, 2001.
research reportNot linked to a paper · 2.8.2 Traffic composition · cited link
Highway Capacity Manual 2010, Transportation Research Board, Washington DC, 2010.
bookNot linked to a paper · 2.8.4 Work Zone Capacity
Jiang, Y. Traffic capacity, Speed and Queue-discharge rate for Indiana’s Four-lane Freeway Work Zones. Transportation Research Record No. 1657, Journal of the Transportation Research Board, Washington, D.C.,1999
Alexiadis, V., K. Jeannotte and A. Chandra, Traffic Analysis Toolbox Volume I: Traffic Analysis Tools Primer, Report No. FHWA-HRT-04-038, Office of Operations, Federal Highway Administration, Washington, DC, 2004.
research reportTRAFFIC ANALYSIS TOOLBOX VOLUME I: TRAFFIC ANALYSIS TOOLS PRIMER (2004) · 2.9.1.1 Sketch-Planning and HCM Methodologies
Ellis, R., J. Pyeon, Z. Herbsman, E. Minchin, and K. Molenaar, Evaluation of Alternative Contracting Techniques on Florida DOT Construction Projects, Final Report, Contract No. FDOT BDC51, 2007.
research reportNot linked to a paper · 4.1 Overview
Thomas, H. R., R. D. Ellis, and S. K. Sinha, Improving the Time Performance of Highway Construction Contracts, Final Report, NCHRP Project No. 20-24(12)A, 2006.
research reportIMPROVING THE TIME PERFORMANCE OF HIGHWAY CONSTRUCTION CONTRACTS (2006) · 4.2.1 Need for Schedule-focused Alternative Contracting Strategies
Crossett, J., and Hines, Comparing State Dots' Construction Project Cost & Schedule Performance – 28 Best Practices from 9 States, Final Report, NCHRP Project 20-24, Task 37A, 2007.
research reportNot linked to a paper · 4.2.1 Need for Schedule-focused Alternative Contracting Strategies
Shr, J. F., B. P.Thompson, J. S. Russell, B. Ran, and H. P. Tserng, “Determining Minimum Contract Time for Highway Projects,” Transportation Research Record No. 1742, 2000.
journal articleDetermining Minimum Contract Time for Highway Projects (2000) · 4.4 Establish Key I/D Parameters
Herbsman, Z. J., W. T. Chen, and W. C. Epstein, “Time is Money: Innovative Contracting Methods in Highway Construction,” Journal of Construction Engineering and Management, Vol. 121, No. 3, 1995.
Caputo, F., and S. Scott, Criteria and Guidelines for Innovative Contracting, Final Report, Study No. SD95-07, South Dakota Department of Transportation, Pierre, SD, 1996.
research reportCriteria and guidelines for innovative contracting (1996) · 4.2.2.3 Lane Rental
Lovett, A. H., Dick, C. T., & Barkan, C. P. L. (2017). Predicting the Cost and Operational Impacts of Slow Orders on Rail Lines in North America. 13.
otherNot linked to a paper · Additional PRIA References, Lovett et al. (2017)
Dingler, M. H. (2010). The Impact of Operational Strategies and New Technologies on Railroad Capacity [Thesis, University of Illinois at Urbana-Champaign]. https://www.ideals.illinois.edu/bitstream/handle/2142/18362/Dingler_Mark.pdf?sequence=1&isAllowed=y
otherNot linked to a paper · Modeling Congestion-Related Delay / Simulation Congestion Modeling · cited link
Krueger, H. (1999). Parametric modeling in rail capacity planning. WSC'99. 1999 Winter Simulation Conference Proceedings.
conference paperParametric modeling in rail capacity planning (2003) · Parametric Models of Delay
← PreviousNext →