Additional PRIA References
Original sourceAttachment (227 KB)Attachment (343 KB)Attachment (821 KB)Attachment (5.5 MB)Attachment (112 KB)Attachment (2.8 MB)Attachment (3.9 MB)Attachment (2.5 MB)Attachment (583 KB)Attachment (204 KB)Attachment (5.1 MB)Attachment (5.5 MB)Attachment (8.8 MB)
Other documents for the same rulemaking (all, by stage)
References: 373 extracted, 128 linked to papers
Association of American Railroads (AAR). 2016b. What We Haul: Crude Oil by Rail.
Association of American Railroads (AAR). 2015. U.S. Rail Crude Oil Traffic.
California Department of Fish and Wildlife (California DFW). 2015. Refugio Beach Oil Spill Natural Resource Damage Assessment Update: November 2015.
Eifling, S. 2013. The Forgotten in Mayflower. Arkansas Times, August 08, 2013.
Enbridge, Inc. 2015. 2014 Annual Report.
Enbridge, Inc. 2014. Annual Report: 2013.
Fehling, D. 2012. Moving Crude Oil Relies on Aging Pipeline System. State Impact: A Reporting Project of NPR Member Stations.
Frittelli, J. A. Andrews, P.W. Parfomak, R. Pirog, J.L. Ramseur, and M. Ratner. 2014. U.S. Rail Transportation of Crude Oil: Background and Issues for Congress. Congressional Research Service. 7-5700.
Frosch, D. 2013. Oil Spill In North Dakota Raises Detection Concerns, New York Times, October 23, 2013.
Hallenbeck, M.E., A. Goodchild, and J. Drescher. 2014. Travel Costs Associated with Flood Closures of State Highways Near Centralia/Chehalis, Washington. Washington Transportation Center (TRACUW).
Holland, M. 2010. Trans-Alaska Pipeline Spill Toll 5,000 Barrels. AND.Com, May 28, 2010.
Nalder, E. 2010. Old Pipelines Are a Hidden Menace. Houston Chronicle, November 15, 2010.
National Oceanic and Atmospheric Administration (NOAA). 2015. 10 Years After Being Hit by Hurricane Katrina, Seeing an Oiled Marsh at the Center of an Experiment in Oil Cleanup.
Pipeline and Hazardous Materials Safety Administration (PHMSA). 2016b. Hazardous Liquid Pipeline Miles and Tanks by Commodity.
Pipeline and Hazardous Materials Safety Administration (PHMSA). 2012. Emergency Response Guidebook.
Plains All American Pipeline LP. 2016. Form 10-K (Annual Report) Filed 02/25/16 for the Period Ending 12/31/15.
United States Energy Information Administration (U.S. EIA). 2016b. U.S. Crude Oil First Purchase Price. Release date 4/1/2016.
United States Energy Information Administration (U.S. EIA). 2015. Petroleum & Other Liquids: Refinery Receipts of Crude Oil by Method of Transportation. Release date 6/19/2015.
United States Environmental Protection Agency (U.S. EPA). 2016. Sensitivity of Freshwater Habitats.
United States Fish and Wildlife Service (USFWS) et al. 2015. Final Damage Assessment and Restoration Plan/Environmental Assessment for the July 25-26, 2010 Enbridge Line 6B Oil Discharges near Marshall, MI.
Utah Department of Environmental Quality (UDEQ). 2012b. Human Health Risk Assessment: Red Butte Creek, Salt Lake City, Utah. Prepared by McDaniel Lambert, Inc.
Young, L. 2014. Crude oil spills are bigger from trains than pipelines. Global News.
Schleifstein, M. 2010. Extent of Oil Spills from Hurricanes Katrina and Rita is Still Being Assessed. The Times-Picayune, August 19, 2010.
Merten, A.A. and C.B. Henry. 2008. Decision-Making Process to Use In-Situ Burning to Restore an Oiled Intermediate Marsh Following Hurricanes Katrina and Rita.
API RP 1183, Assessment and Management of Dents in Pipelines
GPAC Meeting Tr. 65 –80 (Mar. 28, 2018), https://primis.phmsa.dot.gov/meetings/FilGet.mtg?fil=972.
Merriam-Webster dictionary, cluster (last visited Oct. 30, 2020)
https://www.merriam-webster.com/dictionary/group (last visited Oct. 30, 2020)
Tr. of Technical Pipeline Safety Standards Committee, at 248:8-9 (June 24, 1970)
Pipeline Investigation Report NTSB/PIR-22/02, Enbridge Inc. Natural Gas Transmission Pipeline Rupture and Fire, Danville, Kentucky, August 1, 2019
Kiefner and Associates, Inc. 2007, Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines
Sillars, D. N. and J. Riedl, "Framework Model for Determining Incentive and Disincentive Amounts," Transportation Research Record No. 2040, Journal of the Transportation Research Board, Transportation Research Board, Washington, D.C., 2007.
Ullman, G. L., M. D. Finley, J.E. Bryden, R. Srinivasan and F.M. Council, Traffic Safety Evaluation of Nighttime and Daytime Work Zones, NCHRP Report 627, National Cooperative Highway Research Program, Transportation Research Board, Washington, DC, 2008.
A. Atalah, “The Ground Vibration Associated With Pipe Bursting in Rock Conditions,” paper presented at North American Society for Trenchless Technology, NO-DIG 2004, New Orleans, Louisiana, March 22-24, 2004.
PHMSA report from 2007, No. 05-12R, Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines
Pacific Gas and Electric Company, Pipeline Public Awareness Plan, Procedure No. RMP-12, dated January 26, 2010.
Wildenthal, M.T. and J.L. Buffington, “Estimated Construction Period Impact of Widening State Highway 21, in Caldwell, Texas,” Transportation Research Record No. 1559, Journal of the Transportation Research Board, Washington, D.C, 1996.
Traffic Monitoring Guide, Report No FHWA-PL-01-021, Office of Highway Policy Information, Federal Highway Administration, Washington, DC, 2001.
Highway Capacity Manual 2010, Transportation Research Board, Washington DC, 2010.
Jiang, Y. Traffic capacity, Speed and Queue-discharge rate for Indiana’s Four-lane Freeway Work Zones. Transportation Research Record No. 1657, Journal of the Transportation Research Board, Washington, D.C.,1999
Alexiadis, V., K. Jeannotte and A. Chandra, Traffic Analysis Toolbox Volume I: Traffic Analysis Tools Primer, Report No. FHWA-HRT-04-038, Office of Operations, Federal Highway Administration, Washington, DC, 2004.
Ellis, R., J. Pyeon, Z. Herbsman, E. Minchin, and K. Molenaar, Evaluation of Alternative Contracting Techniques on Florida DOT Construction Projects, Final Report, Contract No. FDOT BDC51, 2007.
Thomas, H. R., R. D. Ellis, and S. K. Sinha, Improving the Time Performance of Highway Construction Contracts, Final Report, NCHRP Project No. 20-24(12)A, 2006.
Crossett, J., and Hines, Comparing State Dots' Construction Project Cost & Schedule Performance – 28 Best Practices from 9 States, Final Report, NCHRP Project 20-24, Task 37A, 2007.
Shr, J. F., B. P.Thompson, J. S. Russell, B. Ran, and H. P. Tserng, “Determining Minimum Contract Time for Highway Projects,” Transportation Research Record No. 1742, 2000.
Herbsman, Z. J., W. T. Chen, and W. C. Epstein, “Time is Money: Innovative Contracting Methods in Highway Construction,” Journal of Construction Engineering and Management, Vol. 121, No. 3, 1995.
Caputo, F., and S. Scott, Criteria and Guidelines for Innovative Contracting, Final Report, Study No. SD95-07, South Dakota Department of Transportation, Pierre, SD, 1996.
Lovett, A. H., Dick, C. T., & Barkan, C. P. L. (2017). Predicting the Cost and Operational Impacts of Slow Orders on Rail Lines in North America. 13.
Dingler, M. H. (2010). The Impact of Operational Strategies and New Technologies on Railroad Capacity [Thesis, University of Illinois at Urbana-Champaign]. https://www.ideals.illinois.edu/bitstream/handle/2142/18362/Dingler_Mark.pdf?sequence=1&isAllowed=y
Krueger, H. (1999). Parametric modeling in rail capacity planning. WSC'99. 1999 Winter Simulation Conference Proceedings.