{"document":{"doc_id":12312,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Additional PRIA References","date":"2026-08-07","url":"https://www.regulations.gov/document/PHMSA-2025-0019-0043","source_native_id":"PHMSA-2025-0019-0043","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2025-0019"],"rins":["RIN 2137-AF44"],"related":[{"doc_id":3912,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Repair Criteria for Hazardous Liquid and Gas Transmission Pipelines","date":"2025-05-21"},{"doc_id":127312,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"EO 12866 Meeting-API and LEPA, June 10, 2026","date":"2026-06-12"},{"doc_id":3317,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Repair Criteria for Hazardous Liquid and Gas Transmission Pipelines","date":"2026-07-08"},{"doc_id":12308,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Preliminary Regulatory Impact Analysis (PRIA)","date":"2026-07-08"},{"doc_id":127299,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Changes to NPRM during OIRA Review","date":"2026-07-14"}],"references":[{"citation_id":246899,"raw_reference":"CPWR–The Center for Construction Research and Training. [2023]. Fatal and Nonfatal Injuries in Construction. https://www.cpwr.com/research/data-center/data-dashboards/fatal-and-nonfatal-injuries-in-construction/.","cited_authors":"CPWR–The Center for Construction Research and Training","cited_year":"2023","cited_title":"Fatal and Nonfatal Injuries in Construction","cited_venue":"CPWR–The Center for Construction Research and Training","cited_doi":null,"cited_url":"https://www.cpwr.com/research/data-center/data-dashboards/fatal-and-nonfatal-injuries-in-construction/","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246900,"raw_reference":"CPWR–The Center for Construction Research and Training. [n.d.]. Trenches. https://www.cpwr.com/wp-content/uploads/publications/TrenchingPDFforweb.pdf.","cited_authors":"CPWR–The Center for Construction Research and Training","cited_year":"n.d.","cited_title":"Trenches","cited_venue":"CPWR–The Center for Construction Research and Training","cited_doi":null,"cited_url":"https://www.cpwr.com/wp-content/uploads/publications/TrenchingPDFforweb.pdf","ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246901,"raw_reference":"CPWR–The Center for Construction Research and Training. [n.d.]. Trench Safety. https://www.cpwr.com/research/research-to-practice-r2p/r2p-library/other-resources-forstakeholders/trench-safety/.","cited_authors":"CPWR–The Center for Construction Research and Training","cited_year":"n.d.","cited_title":"Trench Safety","cited_venue":"CPWR–The Center for Construction Research and Training","cited_doi":null,"cited_url":"https://www.cpwr.com/research/research-to-practice-r2p/r2p-library/other-resources-forstakeholders/trench-safety/","ref_kind":"web_page","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246902,"raw_reference":"Echt, A., Earnest, S., Garza, E. [2019]. NIOSH Science Blog - Preventing Trenching Fatalities. https://blogs.cdc.gov/nioshscience-blog/2019/06/06/trenching/.","cited_authors":"Echt, A.; Earnest, S.; Garza, E.","cited_year":"2019","cited_title":"NIOSH Science Blog - Preventing Trenching Fatalities","cited_venue":"NIOSH Science Blog","cited_doi":null,"cited_url":"https://blogs.cdc.gov/nioshscience-blog/2019/06/06/trenching/","ref_kind":"web_page","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246903,"raw_reference":"U.S. Bureau of Labor Statistics. [2023]. R71. Selected worker characteristics by number of days by case type (Number). https://www.bls.gov/iif/nonfatal-injuries-and-illnesses-tables/case-and-demographic-characteristics-table-r71-2021-2022.xlsx.","cited_authors":"U.S. Bureau of Labor Statistics","cited_year":"2023","cited_title":"R71. Selected worker characteristics by number of days by case type (Number)","cited_venue":"U.S. Bureau of Labor Statistics","cited_doi":null,"cited_url":"https://www.bls.gov/iif/nonfatal-injuries-and-illnesses-tables/case-and-demographic-characteristics-table-r71-2021-2022.xlsx","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246904,"raw_reference":"U.S. Bureau of Labor Statistics. [2023]. Survey of Occupational Injuries and Illnesses Handbook of Methods. https://www.bls.gov/opub/hom/soii/pdf/soii.pdf.","cited_authors":"U.S. Bureau of Labor Statistics","cited_year":"2023","cited_title":"Survey of Occupational Injuries and Illnesses Handbook of Methods","cited_venue":"U.S. Bureau of Labor Statistics","cited_doi":null,"cited_url":"https://www.bls.gov/opub/hom/soii/pdf/soii.pdf","ref_kind":"other","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246905,"raw_reference":"U.S. Bureau of Labor Statistics. [2023]. Table 1. Fatal Occupational Injuries by Selected Demographic Characteristics, 2018-22. https://www.bls.gov/news.release/cfoi.t01.htm.","cited_authors":"U.S. Bureau of Labor Statistics","cited_year":"2023","cited_title":"Table 1. Fatal Occupational Injuries by Selected Demographic Characteristics, 2018-22","cited_venue":"U.S. Bureau of Labor Statistics","cited_doi":null,"cited_url":"https://www.bls.gov/news.release/cfoi.t01.htm","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246906,"raw_reference":"U.S. Department of Labor [2022]. OSHA National News Release - Alarming rise in trench-related fatalities spurs US Department of Labor to announce enhanced nationwide enforcement, additional oversight. https://www.osha.gov/news/newsreleases/national/07142022.","cited_authors":"U.S. Department of Labor","cited_year":"2022","cited_title":"OSHA National News Release - Alarming rise in trench-related fatalities spurs US Department of Labor to announce enhanced nationwide enforcement, additional oversight","cited_venue":"OSHA","cited_doi":null,"cited_url":"https://www.osha.gov/news/newsreleases/national/07142022","ref_kind":"news","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246907,"raw_reference":"U.S. Department of Labor [2023]. OSHA News Release – Region 7 – Investigators find Cheney contractor exposed employees to potentially fatal hazards as two workers avoid tragedy in Salina trench collapse. https://www.osha.gov/news/newsreleases/region7/07102023.","cited_authors":"U.S. Department of Labor","cited_year":"2023","cited_title":"OSHA News Release – Region 7 – Investigators find Cheney contractor exposed employees to potentially fatal hazards as two workers avoid tragedy in Salina trench collapse","cited_venue":"OSHA","cited_doi":null,"cited_url":"https://www.osha.gov/news/newsreleases/region7/07102023","ref_kind":"news","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246908,"raw_reference":"Hedmond, Shade. [2018]. Construction Junkie. OSHA Identifies Trenching and Excavation Hazard Reduction as Priority Goal for 2018. https://www.constructionjunkie.com/blog/2018/3/12/osha-identifies-trenching-and-excavationhazard-reduction-as-priority-goal-for-2018.","cited_authors":"Hedmond, Shade","cited_year":"2018","cited_title":"OSHA Identifies Trenching and Excavation Hazard Reduction as Priority Goal for 2018","cited_venue":"Construction Junkie","cited_doi":null,"cited_url":"https://www.constructionjunkie.com/blog/2018/3/12/osha-identifies-trenching-and-excavationhazard-reduction-as-priority-goal-for-2018","ref_kind":"web_page","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246909,"raw_reference":"National Utility Contractors Association. [n.d.] Trench Safety Stand Down. https://www.nuca.com/tssd.","cited_authors":"National Utility Contractors Association","cited_year":"n.d.","cited_title":"Trench Safety Stand Down","cited_venue":"National Utility Contractors Association","cited_doi":null,"cited_url":"https://www.nuca.com/tssd","ref_kind":"web_page","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246910,"raw_reference":"National Institute for Occupational Safety and Health [2022]. Trenching and Excavation. https://www.cdc.gov/niosh/topics/trenching/default.html.","cited_authors":"National Institute for Occupational Safety and Health","cited_year":"2022","cited_title":"Trenching and Excavation","cited_venue":"NIOSH","cited_doi":null,"cited_url":"https://www.cdc.gov/niosh/topics/trenching/default.html","ref_kind":"web_page","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246911,"raw_reference":"Occupational Safety and Health Administration. [2015]. Trenching and Excavation Safety. https://www.osha.gov/sites/default/files/publications/osha2226.pdf.","cited_authors":"Occupational Safety and Health Administration","cited_year":"2015","cited_title":"Trenching and Excavation Safety","cited_venue":"OSHA","cited_doi":null,"cited_url":"https://www.osha.gov/sites/default/files/publications/osha2226.pdf","ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246912,"raw_reference":"U.S. Bureau of Labor Statistics. [2012]. Occupational Injury and Illness Classification Manual Version 2.01. https://wwwn.cdc.gov/Wisards/oiics/Doc/OIICS%20Manual%202012%20v201.pdf.","cited_authors":"U.S. Bureau of Labor Statistics","cited_year":"2012","cited_title":"Occupational Injury and Illness Classification Manual Version 2.01","cited_venue":"U.S. Bureau of Labor Statistics","cited_doi":null,"cited_url":"https://wwwn.cdc.gov/Wisards/oiics/Doc/OIICS%20Manual%202012%20v201.pdf","ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246913,"raw_reference":"Sarah Flood, Miriam King, Renae Rodgers, Steven Ruggles, J. Robert Warren, and Michael Westberry. Integrated Public Use Microdata Series, 2011-2021 Current Population Survey: Version 9.0 [dataset]. Minneapolis, MN: IPUMS, 2022. https://doi.org/10.18128/D030.V9.0.","cited_authors":"Sarah Flood; Miriam King; Renae Rodgers; Steven Ruggles; J. Robert Warren; Michael Westberry","cited_year":"2022","cited_title":"Integrated Public Use Microdata Series, 2011-2021 Current Population Survey: Version 9.0","cited_venue":"IPUMS","cited_doi":"10.18128/d030.v9.0","cited_url":"https://doi.org/10.18128/D030.V9.0","ref_kind":"dataset","section":"Data Sources","page":null,"context_sentence":null,"paper_id":27454,"paper_title":"Integrated Public Use Microdata Series, Current Population Survey: Version 9.0","paper_year":2021,"paper_doi":"10.18128/d030.v9.0"},{"citation_id":246914,"raw_reference":"U.S. Bureau of Labor Statistics (BLS), 2011-2022 Census of Fatal Occupational Injuries (CFOI) Public and Restricted Use Data. https://www.bls.gov/iif/.","cited_authors":"U.S. Bureau of Labor Statistics","cited_year":"2022","cited_title":"Census of Fatal Occupational Injuries (CFOI) Public and Restricted Use Data, 2011-2022","cited_venue":"U.S. Bureau of Labor Statistics","cited_doi":null,"cited_url":"https://www.bls.gov/iif/","ref_kind":"dataset","section":"Data Sources","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246915,"raw_reference":"U.S. Bureau of Labor Statistics (BLS), 2011-2022 Survey of Occupational Injuries and Illnesses (SOII). https://www.bls.gov/iif/.","cited_authors":"U.S. Bureau of Labor Statistics","cited_year":"2022","cited_title":"Survey of Occupational Injuries and Illnesses (SOII), 2011-2022","cited_venue":"U.S. Bureau of Labor Statistics","cited_doi":null,"cited_url":"https://www.bls.gov/iif/","ref_kind":"dataset","section":"Data Sources","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246916,"raw_reference":"U.S. Department of Labor, OSHA Enforcement Data, 2011-2023. https://enforcedata.dol.gov/views/data_catalogs.php.","cited_authors":"U.S. Department of Labor","cited_year":"2023","cited_title":"OSHA Enforcement Data, 2011-2023","cited_venue":"U.S. Department of Labor","cited_doi":null,"cited_url":"https://enforcedata.dol.gov/views/data_catalogs.php","ref_kind":"dataset","section":"Data Sources","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246917,"raw_reference":"Occupational Fatalities During Trenching and Excavation Work --- United States, 1992--2001. MMWR Weekly, April 23, 2004 / 53(15);311-314.","cited_authors":null,"cited_year":"2004","cited_title":"Occupational Fatalities During Trenching and Excavation Work --- United States, 1992--2001","cited_venue":"MMWR Weekly 53(15)","cited_doi":null,"cited_url":"https://www.cdc.gov/mmwr/preview/mmwrhtml/mm5315a2.htm","ref_kind":"journal_article","section":"Morbidity and Mortality Weekly Report","page":null,"context_sentence":null,"paper_id":59527,"paper_title":"Occupational fatalities during trenching and excavation work--United States, 1992-2001.","paper_year":2004,"paper_doi":null},{"citation_id":246918,"raw_reference":"National Institute for Occupational Safety and Health. NIOSH analyses of the Bureau of Labor Statistics' Census of Fatal Occupational Injuries special research file. Morgantown, West Virginia: CDC, NIOSH, 2004.","cited_authors":"National Institute for Occupational Safety and Health","cited_year":"2004","cited_title":"NIOSH analyses of the Bureau of Labor Statistics' Census of Fatal Occupational Injuries special research file","cited_venue":"NIOSH","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"MMWR References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":246919,"raw_reference":"National Institute for Occupational Safety and Health. Two Hispanic construction laborers (ages fifteen and sixteen) die after trench collapse---South Carolina. Morgantown, West Virginia: CDC, NIOSH, 2003. (Fatality Assessment and Control Evaluation program report 2003-07).","cited_authors":"National Institute for Occupational Safety and Health","cited_year":"2003","cited_title":"Two Hispanic construction laborers (ages fifteen and sixteen) die after trench collapse---South Carolina","cited_venue":"NIOSH FACE program report 2003-07","cited_doi":"10.26616/nioshface200307","cited_url":null,"ref_kind":"research_report","section":"MMWR References","page":null,"context_sentence":null,"paper_id":27455,"paper_title":"Two Hispanic construction laborers (ages fifteen and sixteen) die after trench collapse - South Carolina.","paper_year":2004,"paper_doi":"10.26616/nioshface200307"},{"citation_id":246920,"raw_reference":"National Institute for Occupational Safety and Health. Hispanic pipe layer dies after being struck by excavator (track hoe) bucket on construction site---South Carolina. Morgantown, West Virginia: CDC, NIOSH, 2003. (Fatality Assessment and Control Evaluation program report 2003-12).","cited_authors":"National Institute for Occupational Safety and Health","cited_year":"2003","cited_title":"Hispanic pipe layer dies after being struck by excavator (track hoe) bucket on construction site---South Carolina","cited_venue":"NIOSH FACE program report 2003-12","cited_doi":"10.26616/nioshface200312","cited_url":null,"ref_kind":"research_report","section":"MMWR References","page":null,"context_sentence":null,"paper_id":50176,"paper_title":"Hispanic pipe layer dies after being struck by excavator (track hoe) bucket on construction site - South Carolina.","paper_year":2004,"paper_doi":"10.26616/nioshface200312"},{"citation_id":246921,"raw_reference":"Suruda A, Whitaker B, Bloswick D, Phillips P, Sesek R. Impact of the OSHA trench and excavation standard on fatal injury in the construction industry. J Occup Environ Med 2002:44:902--5.","cited_authors":"Suruda A; Whitaker B; Bloswick D; Phillips P; Sesek R","cited_year":"2002","cited_title":"Impact of the OSHA trench and excavation standard on fatal injury in the construction industry","cited_venue":"Journal of Occupational and Environmental Medicine","cited_doi":"10.1097/00043764-200210000-00007","cited_url":null,"ref_kind":"journal_article","section":"MMWR References","page":null,"context_sentence":null,"paper_id":27456,"paper_title":"Impact of the OSHA Trench and Excavation Standard on Fatal Injury in the Construction Industry","paper_year":2002,"paper_doi":"10.1097/00043764-200210000-00007"},{"citation_id":247062,"raw_reference":"Mubarak, S. Construction Project Scheduling and Control, Second Edition, John Wiley & Sons, Inc., 2010.","cited_authors":"Mubarak, S.","cited_year":"2010","cited_title":"Construction Project Scheduling and Control, Second Edition","cited_venue":"John Wiley & Sons, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 126","page":null,"context_sentence":null,"paper_id":59383,"paper_title":"Construction Project Scheduling and Control","paper_year":2010,"paper_doi":"10.1002/9780470912171"},{"citation_id":247063,"raw_reference":"FHWA Guide for Construction Contract Time Determination Procedures, Technical Advisory TA 5080.15, Office of Program Administration, Federal Highway Administration, Washington, DC, 2002.","cited_authors":"FHWA","cited_year":"2002","cited_title":"Guide for Construction Contract Time Determination Procedures, Technical Advisory TA 5080.15","cited_venue":"Office of Program Administration, Federal Highway Administration","cited_doi":null,"cited_url":"http://www.fhwa.dot.gov/construction/contracts/t508015.cfm","ref_kind":"government_report","section":"fn 125","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247064,"raw_reference":"Anderson, S., I. Damnjanovic, A. Nejat, and S. Ramesh, Synthesis on Construction Unit Cost Development: Technical Report, Report No. FHWA/TX-09/0-6023-1, Texas Department of Transportation, Austin, Texas, 2008.","cited_authors":"Anderson, S., I. Damnjanovic, A. Nejat, S. Ramesh","cited_year":"2008","cited_title":"Synthesis on Construction Unit Cost Development: Technical Report","cited_venue":"Texas Department of Transportation, Report No. FHWA/TX-09/0-6023-1","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 131","page":null,"context_sentence":null,"paper_id":59457,"paper_title":"Synthesis on construction unit cost development : technical report.","paper_year":2009,"paper_doi":null},{"citation_id":247065,"raw_reference":"AASHTO, A Practical Guide to Estimating, Prepared by AASHTO Technical Committee on Cost Estimating, American Association of State Highway and Transportation Officials, Washington, DC, 2009.","cited_authors":"AASHTO","cited_year":"2009","cited_title":"A Practical Guide to Estimating","cited_venue":"American Association of State Highway and Transportation Officials","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 132","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247066,"raw_reference":"Carr, P. G., and P. S. Beyor, \"Design Fees, the State of the Profession, and a Time for Corrective Action,\" Journal of Management in Engineering, American Society of Civil Engineering, Vol. 21, No. 3, July 1, 2005.","cited_authors":"Carr, P. G., and P. S. Beyor","cited_year":"2005","cited_title":"Design Fees, the State of the Profession, and a Time for Corrective Action","cited_venue":"Journal of Management in Engineering, American Society of Civil Engineering","cited_doi":"10.1061/(asce)0742-597x(2005)21:3(110)","cited_url":null,"ref_kind":"journal_article","section":"fn 136","page":null,"context_sentence":null,"paper_id":27457,"paper_title":"Design Fees, the State of the Profession, and a Time for Corrective Action","paper_year":2005,"paper_doi":"10.1061/(asce)0742-597x(2005)21:3(110)"},{"citation_id":247067,"raw_reference":"Reed Construction Data, http://rsmeans.reedconstructiondata.com/.","cited_authors":"Reed Construction Data","cited_year":null,"cited_title":"RS Means","cited_venue":"Reed Construction Data","cited_doi":null,"cited_url":"http://rsmeans.reedconstructiondata.com/","ref_kind":"dataset","section":"fn 134","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247068,"raw_reference":"Sillars, S. N. Establishing Guidelines for Incentive/Disincentive Contracting at Oregon DOT, Report No. FHWA-OR-RD-07-07, Oregon Department of Transportation, Salem OR, 2007.","cited_authors":"Sillars, S. N.","cited_year":"2007","cited_title":"Establishing Guidelines for Incentive/Disincentive Contracting at Oregon DOT","cited_venue":"Oregon Department of Transportation, Report No. FHWA-OR-RD-07-07","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 4.4.4 / Table 55","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247069,"raw_reference":"Fick, G., Cackler, E. T., Trost, S. and L. Vanzler, Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts, Final Report, NCHRP Project No. 652, National Cooperative Highway Research Program, Transportation Research Board, Washington, D.C., 2010.","cited_authors":"Fick, G., Cackler, E. T., Trost, S., Vanzler, L.","cited_year":"2010","cited_title":"Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts","cited_venue":"NCHRP Project No. 652, Transportation Research Board","cited_doi":"10.17226/14392","cited_url":null,"ref_kind":"research_report","section":"Section 4.4.5 / Figure 16","page":null,"context_sentence":null,"paper_id":50177,"paper_title":"Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts","paper_year":2010,"paper_doi":"10.17226/14392"},{"citation_id":247070,"raw_reference":"Pyeon, J. H. and E. B. Lee, \"CA4PRS Application for Determination of Incentive/Disincentive Dollar Amount,\" Presented at the CA4PRS Peer Exchange Workshop, St. Louis, MO, 2010.","cited_authors":"Pyeon, J. H., Lee, E. B.","cited_year":"2010","cited_title":"CA4PRS Application for Determination of Incentive/Disincentive Dollar Amount","cited_venue":"CA4PRS Peer Exchange Workshop","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 4.4.6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247071,"raw_reference":"Ullman et al. 42 ... Ullman, G. L., M. D. Finley, J.E. Bryden, R. Srinivasan and F.M. Council, Traffic Safety Evaluation of Nighttime and Daytime Work Zones, NCHRP Report 627, National Cooperative Highway Research Program, Transportation Research Board, Washington, DC, 2008.","cited_authors":"Ullman, G. L., M. D. Finley, J.E. Bryden, R. Srinivasan, F.M. Council","cited_year":"2008","cited_title":"Traffic Safety Evaluation of Nighttime and Daytime Work Zones","cited_venue":"NCHRP Report 627, Transportation Research Board","cited_doi":"10.17226/14196","cited_url":null,"ref_kind":"research_report","section":"Section 5.1.3.4","page":null,"context_sentence":null,"paper_id":27458,"paper_title":"Traffic Safety Evaluation of Nighttime and Daytime Work Zones","paper_year":2008,"paper_doi":"10.17226/14196"},{"citation_id":247072,"raw_reference":"Council et al., Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries, Report No. FHWA-HRT-05-051, Submitted to the Office of Safety Research and Development, Federal Highway Administration, Washington, 2005.","cited_authors":"Council et al.","cited_year":"2005","cited_title":"Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries","cited_venue":"Federal Highway Administration, Report No. FHWA-HRT-05-051","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 5.1.3.1","page":null,"context_sentence":null,"paper_id":59556,"paper_title":"Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries","paper_year":2005,"paper_doi":null},{"citation_id":247073,"raw_reference":"Kepner, C. H. and B. B. Tregoe, The New Rational Manager, Princeton Research Press, Princeton, NJ, 1981.","cited_authors":"Kepner, C. H., Tregoe, B. B.","cited_year":"1981","cited_title":"The New Rational Manager","cited_venue":"Princeton Research Press","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"Section 5.3.4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247074,"raw_reference":"Greenhorne & O'Mara, Inc. Eastern Avenue Over Kenilworth Avenue, N.E. Work Zone Transportation Management Plan, Washington, D.C. Prepared for District Department of Transportation Infrastructure Project Management Administration/Team 4. May 2009.","cited_authors":"Greenhorne & O'Mara, Inc.","cited_year":"2009","cited_title":"Eastern Avenue Over Kenilworth Avenue, N.E. Work Zone Transportation Management Plan","cited_venue":"Prepared for District Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 5.3.1 fn 142","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247437,"raw_reference":"Steen et al., 1999","cited_authors":"Steen et al.","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 2.3.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247438,"raw_reference":"U.S. EPA, 2016","cited_authors":"U.S. EPA","cited_year":"2016","cited_title":null,"cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section 2.3.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247439,"raw_reference":"U.S. EPA Science Advisory Board (SAB), 2009; p. 52","cited_authors":"U.S. EPA Science Advisory Board","cited_year":"2009","cited_title":null,"cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section 2.3.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247440,"raw_reference":"Abt Associates and Bear Creek Economics (2016; Chapter 4)","cited_authors":"Abt Associates; Bear Creek Economics","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 2.3.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247441,"raw_reference":"Simons et al. (2001) conducted a hedonic analysis after a pipeline rupture in Maryland","cited_authors":"Simons et al.","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.3.4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247442,"raw_reference":"Simons (1999) conducted a case study on the effects of a 1993 legal settlement for a BP pipeline rupture","cited_authors":"Simons","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.3.4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247443,"raw_reference":"Hansen et al. (nd) conducted a hedonic analysis of home sales in Bellingham, Washington","cited_authors":"Hansen et al.","cited_year":"nd","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"working_paper","section":"Section 2.3.4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247444,"raw_reference":"Simons et al. (1996) conducted a study on the effect of leaking hazardous liquid underground storage tanks on residential property values in Cuyahoga County, OH","cited_authors":"Simons et al.","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.3.4","page":null,"context_sentence":null,"paper_id":27467,"paper_title":"The Effect of Underground Storage Tanks on Residential Property Values in Cuyahoga County, Ohio","paper_year":1997,"paper_doi":"10.1080/10835547.1997.12090890"},{"citation_id":247445,"raw_reference":"Zhang (2009) examined the vulnerability of businesses to environmental disasters","cited_authors":"Zhang","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.3.5","page":null,"context_sentence":null,"paper_id":28314,"paper_title":"Vulnerability of community businesses to environmental disasters","paper_year":2008,"paper_doi":"10.1111/j.1467-7717.2008.01061.x"},{"citation_id":247446,"raw_reference":"Kacik (2016) reports that several business owners filed a class action suit","cited_authors":"Kacik","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"Section 2.3.5","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247447,"raw_reference":"Jepson and Colburn (2013) developed a set of social and economic indicators","cited_authors":"Jepson; Colburn","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247448,"raw_reference":"Puckett, 2015","cited_authors":"Puckett","cited_year":"2015","cited_title":null,"cited_venue":"Montana Fish, Wildlife, and Parks","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 2.3.6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247449,"raw_reference":"Montana Fish, Wildlife, and Parks (FWP), 2015","cited_authors":"Montana Fish, Wildlife, and Parks","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section 2.3.6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247450,"raw_reference":"Freshwater Fishing News, 2015a","cited_authors":"Freshwater Fishing News","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"Section 2.3.6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247451,"raw_reference":"Freshwater Fishing News (2015b)","cited_authors":"Freshwater Fishing News","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"Section 2.3.6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247452,"raw_reference":"USFWS et al., 2015","cited_authors":"U.S. Fish and Wildlife Service et al.","cited_year":"2015","cited_title":"Kalamazoo River Enbridge Oil Spill Final Natural Resource Damage Assessment and Restoration Plan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section 2.3.6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247453,"raw_reference":"USFWS and U.S. Census Bureau, 2014","cited_authors":"U.S. Fish and Wildlife Service; U.S. Census Bureau","cited_year":"2014","cited_title":"2011 National Survey of Fishing, Hunting, and Wildlife-Associated Recreation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Section 2.3.6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247454,"raw_reference":"Pholphiboun (2015)","cited_authors":"Pholphiboun","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"Section 2.3.7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247455,"raw_reference":"Klemann, 2015","cited_authors":"Klemann","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"Section 2.3.7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247456,"raw_reference":"Mesa-Arango, et al. (2013)","cited_authors":"Mesa-Arango et al.","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.3.7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247457,"raw_reference":"Weinstein and Clower (1998)","cited_authors":"Weinstein; Clower","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 2.3.7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247458,"raw_reference":"Lovett, et al. (2015)","cited_authors":"Lovett et al.","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 2.3.7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247459,"raw_reference":"Hallenbeck, et al. (2014)","cited_authors":"Hallenbeck et al.","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 2.3.7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247460,"raw_reference":"Restrepo et al. (2009)","cited_authors":"Restrepo et al.","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 2.4","page":null,"context_sentence":null,"paper_id":27466,"paper_title":"Causes, cost consequences, and risk implications of accidents in US hazardous liquid pipeline infrastructure","paper_year":2008,"paper_doi":"10.1016/j.ijcip.2008.09.001"},{"citation_id":247461,"raw_reference":"Girgin and Krausmann (2016)","cited_authors":"Girgin; Krausmann","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.4","page":null,"context_sentence":null,"paper_id":27464,"paper_title":"Historical analysis of U.S. onshore hazardous liquid pipeline accidents triggered by natural hazards","paper_year":2016,"paper_doi":"10.1016/j.jlp.2016.02.008"},{"citation_id":247462,"raw_reference":"Dawotola et al., 2012","cited_authors":"Dawotola et al.","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.4","page":null,"context_sentence":null,"paper_id":50179,"paper_title":"Risk-Based Maintenance of a Cross-Country Petroleum Pipeline System","paper_year":2012,"paper_doi":"10.1061/(asce)ps.1949-1204.0000121"},{"citation_id":247463,"raw_reference":"Hovey & Farmer, 1993","cited_authors":"Hovey; Farmer","cited_year":"1993","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247464,"raw_reference":"Shahriar et al., 2012","cited_authors":"Shahriar et al.","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.4","page":null,"context_sentence":null,"paper_id":27469,"paper_title":"Risk analysis for oil & gas pipelines: A sustainability assessment approach using fuzzy based bow-tie analysis","paper_year":2011,"paper_doi":"10.1016/j.jlp.2011.12.007"},{"citation_id":247465,"raw_reference":"Dawotola et al., 2009","cited_authors":"Dawotola et al.","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247466,"raw_reference":"Caleyo et al., 2009","cited_authors":"Caleyo et al.","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.4","page":null,"context_sentence":null,"paper_id":27463,"paper_title":"Probability distribution of pitting corrosion depth and rate in underground pipelines: A Monte Carlo study","paper_year":2009,"paper_doi":"10.1016/j.corsci.2009.05.019"},{"citation_id":247467,"raw_reference":"Frittelli et al., 2014","cited_authors":"Frittelli et al.","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 16","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247468,"raw_reference":"Enbridge, 2015","cited_authors":"Enbridge","cited_year":"2015","cited_title":"Annual financial report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.3.7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247469,"raw_reference":"Plains All American Pipeline (2016)","cited_authors":"Plains All American Pipeline","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.3.7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247470,"raw_reference":"Smith and Mejia (2016)","cited_authors":"Smith; Mejia","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"Section 3.3.7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247471,"raw_reference":"ORNL, 2012","cited_authors":"Oak Ridge National Laboratory","cited_year":"2012","cited_title":null,"cited_venue":"Oak Ridge National Laboratory","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 6.2.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247472,"raw_reference":"Johnston et al., 2015; Johnston et al., 2006","cited_authors":"Johnston et al.","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 5.2.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":247473,"raw_reference":"Wooldridge (2010)","cited_authors":"Wooldridge","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"book","section":"Section 7.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":248074,"raw_reference":"David Schrank, Kartikeya Jha, Luke Albert, and Bill Eisele. Appendix A: Methodology. 2025 Urban Mobility Report, Texas A&M Transportation Institute, August 2025. Accessed 2025. https://mobility.tamu.edu/umr/report/#methodology.","cited_authors":"David Schrank, Kartikeya Jha, Luke Albert, Bill Eisele","cited_year":"2025","cited_title":"Appendix A: Methodology. 2025 Urban Mobility Report","cited_venue":"Texas A&M Transportation Institute","cited_doi":null,"cited_url":"https://mobility.tamu.edu/umr/report/#methodology","ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":248075,"raw_reference":"Phil Lasley and Mohammad Askariyeh. Appendix B: Change in Vehicle Occupancy Used in Mobility Monitoring Efforts. 2025 Urban Mobility Report, Texas A&M Transportation Institute, August 2025. Accessed 2025. https://mobility.tamu.edu/umr/report/#appx-b.","cited_authors":"Phil Lasley, Mohammad Askariyeh","cited_year":"2025","cited_title":"Appendix B: Change in Vehicle Occupancy Used in Mobility Monitoring Efforts","cited_venue":"Texas A&M Transportation Institute","cited_doi":null,"cited_url":"https://mobility.tamu.edu/umr/report/#appx-b","ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":248076,"raw_reference":"Brianne A. Glover. Appendix C: Value of Delay Time for Use in Mobility Monitoring Efforts. 2025 Urban Mobility Report, Texas A&M Transportation Institute, August 2025. Accessed 2025. https://mobility.tamu.edu/umr/report/#appx-c","cited_authors":"Brianne A. Glover","cited_year":"2025","cited_title":"Appendix C: Value of Delay Time for Use in Mobility Monitoring Efforts","cited_venue":"Texas A&M Transportation Institute","cited_doi":null,"cited_url":"https://mobility.tamu.edu/umr/report/#appx-c","ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":248077,"raw_reference":"Phil Lasley, Jack Kong, and Stuti Singh. Appendix D: Observed Access Methodology. 2025 Urban Mobility Report, Texas A&M Transportation Institute, August 2025. Accessed 2025. https://mobility.tamu.edu/umr/report/#appx-d.","cited_authors":"Phil Lasley, Jack Kong, Stuti Singh","cited_year":"2025","cited_title":"Appendix D: Observed Access Methodology","cited_venue":"Texas A&M Transportation Institute","cited_doi":null,"cited_url":"https://mobility.tamu.edu/umr/report/#appx-d","ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":248078,"raw_reference":"INRIX. National Average Speed Database, 2009 to 2024. Accessed 2025. https://inrix.com/products/speed/","cited_authors":"INRIX","cited_year":"2025","cited_title":"National Average Speed Database, 2009 to 2024","cited_venue":"INRIX","cited_doi":null,"cited_url":"https://inrix.com/products/speed/","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":248079,"raw_reference":"Federal Highway Administration. Highway Performance Monitoring System (HPMS), 1982 to 2023 Data. December 2023. Accessed 2024. http://www.fhwa.dot.gov/policyinformation/hpms.cfm.","cited_authors":"Federal Highway Administration","cited_year":"2023","cited_title":"Highway Performance Monitoring System (HPMS), 1982 to 2023 Data","cited_venue":"U.S. Department of Transportation","cited_doi":null,"cited_url":"http://www.fhwa.dot.gov/policyinformation/hpms.cfm","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":248080,"raw_reference":"INRIX. National Trips Database, 2024. Accessed 2025. https://inrix.com/products/trip-analytics/","cited_authors":"INRIX","cited_year":"2025","cited_title":"National Trips Database, 2024","cited_venue":"INRIX","cited_doi":null,"cited_url":"https://inrix.com/products/trip-analytics/","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":248081,"raw_reference":"Leis B., Eshraghi A., Dew B., Cheng F., \"Dent Strain and Stress Analyses and Implications Concerning API RP 1183 - Part I: Background for Dent Geometry and Strain Analyses During Contact and Re-Rounding,\" SSRN, June 16, 2023.","cited_authors":"B. Leis, A. Eshraghi, B. Dew, F. Cheng","cited_year":"2023","cited_title":"Dent Strain and Stress Analyses and Implications Concerning API RP 1183 - Part I: Background for Dent Geometry and Strain Analyses During Contact and Re-Rounding","cited_venue":"SSRN","cited_doi":"10.2139/ssrn.4451911","cited_url":null,"ref_kind":"working_paper","section":"Safety Advisory SA 2025-01 References","page":null,"context_sentence":null,"paper_id":4295,"paper_title":"Dent strain and stress analyses and implications concerning API RP 1183 - Part I: Background for dent geometry and strain analyses during contact and re-rounding","paper_year":2023,"paper_doi":"10.1016/j.jpse.2023.100143"},{"citation_id":248082,"raw_reference":"Zhu, X.K., \"A verification study of fatigue-based methods in API RP 1183 for estimating fatigue life of pipeline dents,\" International Journal of Pressure Vessels and Piping, 205 (2023) 1049","cited_authors":"X.K. Zhu","cited_year":"2023","cited_title":"A verification study of fatigue-based methods in API RP 1183 for estimating fatigue life of pipeline dents","cited_venue":"International Journal of Pressure Vessels and Piping","cited_doi":"10.1016/j.ijpvp.2023.104969","cited_url":null,"ref_kind":"journal_article","section":"Safety Advisory SA 2025-01 References","page":null,"context_sentence":null,"paper_id":27459,"paper_title":"A verification study of fatigue-based methods in API RP 1183 for estimating fatigue life of pipeline dents","paper_year":2023,"paper_doi":"10.1016/j.ijpvp.2023.104969"},{"citation_id":248083,"raw_reference":"BLADE ENERGY PARTNERS, RELIABILITY-BASED APPROACH TO ASSESS TREATMENT OF CORROSION AND SCC THREATS FOR PIPELINE CLASS LOCATION CHANGES (2020)","cited_authors":"Blade Energy Partners","cited_year":"2020","cited_title":"Reliability-Based Approach to Assess Treatment of Corrosion and SCC Threats for Pipeline Class Location Changes","cited_venue":"Blade Energy Partners","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Comments in response to PHMSA NPRM, Section II.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249375,"raw_reference":"Blade Report","cited_authors":"Blade","cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section V.D (anomaly response criteria)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249376,"raw_reference":"Kiefner and Associates, Inc., Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines (2007)","cited_authors":"Kiefner and Associates, Inc.","cited_year":"2007","cited_title":"Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_venue":"PHMSA report","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Pipeline Investigation Report, section 2.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249377,"raw_reference":"Mesloh and Rosenfeld 2003","cited_authors":"Mesloh and Rosenfeld","cited_year":"2003","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Pipeline Investigation Report, section 1.6.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249378,"raw_reference":"Barkdull and others 2006","cited_authors":"Barkdull and others","cited_year":"2006","cited_title":null,"cited_venue":"CC Technologies Inc.","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Pipeline Investigation Report, section 1.6.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249379,"raw_reference":"NDT Global 2019","cited_authors":"NDT Global","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Pipeline Investigation Report, section 1.8.5","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249380,"raw_reference":"P-PIC 2012","cited_authors":"Process Performance Improvement Consultants, LLC","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Pipeline Investigation Report, section 1.8.8","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249381,"raw_reference":"Dynamic Risk 2019","cited_authors":"Dynamic Risk Assessment Systems, Inc.","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Pipeline Investigation Report, section 1.8.9","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249382,"raw_reference":"Clark and others 2005","cited_authors":"Clark and others","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Pipeline Investigation Report, section 1.8.4.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249383,"raw_reference":"Interstate Natural Gas Association of America, Integrity Characteristics of Vintage Pipelines (2004)","cited_authors":"Interstate Natural Gas Association of America","cited_year":"2004","cited_title":"Integrity Characteristics of Vintage Pipelines","cited_venue":"Interstate Natural Gas Association of America","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Pipeline Investigation Report, section 1.8.4.1 fn 43","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249384,"raw_reference":"DEATECH Consulting Company 2008","cited_authors":"DEATECH Consulting Company","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Pipeline Investigation Report, section 2.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249385,"raw_reference":"Idaho National Laboratory 2005","cited_authors":"Idaho National Laboratory","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Pipeline Investigation Report, section 2.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249539,"raw_reference":"National Transportation Safety Board. 2011. Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire, San Bruno, California, September 9, 2010. Pipeline Accident Report NTSB/PAR-11/01. Washington, DC.","cited_authors":"National Transportation Safety Board","cited_year":"2011","cited_title":"Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire, San Bruno, California, September 9, 2010","cited_venue":"NTSB/PAR-11/01","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Cover page / front matter","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249540,"raw_reference":"A. Atalah, \"The Ground Vibration Associated With Pipe Bursting in Rock Conditions,\" paper presented at North American Society for Trenchless Technology, NO-DIG 2004, New Orleans, Louisiana, March 22-24, 2004.","cited_authors":"A. Atalah","cited_year":"2004","cited_title":"The Ground Vibration Associated With Pipe Bursting in Rock Conditions","cited_venue":"North American Society for Trenchless Technology, NO-DIG 2004","cited_doi":null,"cited_url":null,"ref_kind":"conference_paper","section":"fn 49","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249541,"raw_reference":"J. Simicevic and R.L. Sterling, Guidelines for Pipe Bursting, TTC Technical Report #2001.02 (prepared by Trenchless Technology Center for U.S. Army Corps of Engineers, Engineering Research and Development Center, 2001).","cited_authors":"J. Simicevic and R.L. Sterling","cited_year":"2001","cited_title":"Guidelines for Pipe Bursting","cited_venue":"TTC Technical Report #2001.02, Trenchless Technology Center, U.S. Army Corps of Engineers","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 50","page":null,"context_sentence":null,"paper_id":59362,"paper_title":"Guidelines for Pipe Bursting","paper_year":2001,"paper_doi":null},{"citation_id":249542,"raw_reference":"Gas Research Institute (GRI) report GRI-04/0178, Effects of Pressure Cycles on Gas Pipelines, dated September 17, 2004","cited_authors":"Gas Research Institute","cited_year":"2004","cited_title":"Effects of Pressure Cycles on Gas Pipelines","cited_venue":"Gas Research Institute","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"1.7.5.3 Periodic Pressure Increases to MAOP","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249543,"raw_reference":"A PHMSA report from 2007, No. 05-12R, Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_authors":"PHMSA","cited_year":"2007","cited_title":"Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_venue":"Pipeline and Hazardous Materials Safety Administration, Report No. 05-12R","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"1.7.5.3 Periodic Pressure Increases to MAOP","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249544,"raw_reference":"M. Stephens, A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines, GRI-00/0189, Gas Research Institute, October 2000.","cited_authors":"M. Stephens","cited_year":"2000","cited_title":"A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines","cited_venue":"Gas Research Institute, GRI-00/0189","cited_doi":"10.1115/ipc2002-27073","cited_url":null,"ref_kind":"research_report","section":"1.9.2 Use of Automatic Shutoff Valves and Remote Control Valves, fn 93","page":null,"context_sentence":null,"paper_id":8022,"paper_title":"A Model for Sizing High Consequence Areas Associated With Natural Gas Pipelines","paper_year":2002,"paper_doi":"10.1115/ipc2002-27073"},{"citation_id":249545,"raw_reference":"C.R. Sparks, Remote and Automatic Main Line Valve Technology Assessment, Gas Research Institute, July 1995.","cited_authors":"C.R. Sparks","cited_year":"1995","cited_title":"Remote and Automatic Main Line Valve Technology Assessment","cited_venue":"Gas Research Institute","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"1.9.2 Use of Automatic Shutoff Valves and Remote Control Valves, fn 93","page":null,"context_sentence":null,"paper_id":59465,"paper_title":"REMOTE AND AUTOMATIC MAIN LINE VALVE TECHNOLOGY ASSESSMENT FINAL REPORT.","paper_year":1995,"paper_doi":null},{"citation_id":249546,"raw_reference":"Remotely Controlled Valves on Interstate Natural Gas Pipelines (Feasibility Determination Mandated by the Accountable Pipeline Safety and Partnership Act of 1996) (Washington, DC: U.S. Department of Transportation Research and Special Programs Administration, 1999).","cited_authors":"U.S. Department of Transportation Research and Special Programs Administration","cited_year":"1999","cited_title":"Remotely Controlled Valves on Interstate Natural Gas Pipelines (Feasibility Determination Mandated by the Accountable Pipeline Safety and Partnership Act of 1996)","cited_venue":"U.S. DOT Research and Special Programs Administration","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"1.9.2 Use of Automatic Shutoff Valves and Remote Control Valves, fn 94","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249547,"raw_reference":"Supervisory Control and Data Acquisition (SCADA) in Liquid Pipelines, Safety Study NTSB/SS-05/02 (Washington, DC: National Transportation Safety Board, 2005).","cited_authors":"National Transportation Safety Board","cited_year":"2005","cited_title":"Supervisory Control and Data Acquisition (SCADA) in Liquid Pipelines","cited_venue":"NTSB/SS-05/02","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"1.9.1 SCADA System Operations, fn 88","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249548,"raw_reference":"Pacific Gas & Electric Company Natural Gas Pipeline Puncture, San Francisco, California, August 25, 1981, Pipeline Accident Report NTSB/PAR-82/01 (Washington, DC: National Transportation Safety Board, 1982).","cited_authors":"National Transportation Safety Board","cited_year":"1982","cited_title":"Pacific Gas & Electric Company Natural Gas Pipeline Puncture, San Francisco, California, August 25, 1981","cited_venue":"NTSB/PAR-82/01","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Executive Summary","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249549,"raw_reference":"Explosion, Release, and Ignition of Natural Gas, Rancho Cordova, California, December 24, 2008, Pipeline Accident Brief NTSB/PAB-10/01 (Washington, DC: National Transportation Safety Board, 2010).","cited_authors":"National Transportation Safety Board","cited_year":"2010","cited_title":"Explosion, Release, and Ignition of Natural Gas, Rancho Cordova, California, December 24, 2008","cited_venue":"NTSB/PAB-10/01","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Executive Summary","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249550,"raw_reference":"Moody Engineering Company report on supervision and inspection of manufacture of 30-inch pipe, July 1949","cited_authors":"Moody Engineering Company","cited_year":"1949","cited_title":"Report on supervision and inspection of the manufacture of 100,000 feet of 30-inch-diameter pipe by Consolidated Western's Maywood plant","cited_venue":"Moody Engineering Company","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"1.7.2 1956 Relocation Project (Segment 180)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249551,"raw_reference":"February 2011 report prepared for PG&E under contract by TRE Canada","cited_authors":"TRE Canada","cited_year":"2011","cited_title":"Ground deformation analysis of Earl Avenue and Glenview Drive area","cited_venue":"TRE Canada","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"1.7.3 Multiyear Replacement Project and Seismic Risk","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249552,"raw_reference":"Paradigm Alliance, Inc., program documentation review of public awareness program, report dated June 2010","cited_authors":"Paradigm Alliance, Inc.","cited_year":"2010","cited_title":"Program documentation review of PG&E public awareness program","cited_venue":"Paradigm Alliance, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"1.9.3 Public Awareness","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249802,"raw_reference":"Brod et al., 2013 (NCHRP Report 755: Comprehensive Costs of Highway-Rail Grade Crossing Crashes)","cited_authors":"Brod et al.","cited_year":"2013","cited_title":"Comprehensive Costs of Highway-Rail Grade Crossing Crashes","cited_venue":"National Cooperative Highway Research Program Report 755","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 52 / Section 3.5.3 Time Value of Freight","page":null,"context_sentence":null,"paper_id":59569,"paper_title":"Comprehensive Costs of Highway-Rail Grade Crossing Crashes","paper_year":2013,"paper_doi":null},{"citation_id":249803,"raw_reference":"Babcock & Sanderson, 2004","cited_authors":"Babcock & Sanderson","cited_year":"2004","cited_title":null,"cited_venue":"Kansas DOT railroad operations studies","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 53","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249804,"raw_reference":"Fitzsimmons et al., 2017","cited_authors":"Fitzsimmons et al.","cited_year":"2017","cited_title":null,"cited_venue":"Kansas DOT railroad operations studies","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 53","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249805,"raw_reference":"Qiao et al., 2016","cited_authors":"Qiao et al.","cited_year":"2016","cited_title":null,"cited_venue":"Texas DOT with FHWA railroad operations studies","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 53","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249806,"raw_reference":"U.S. Environmental Protection Agency. (2009). Technical Highlights: Emission Factors for Locomotives.","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2009","cited_title":"Technical Highlights: Emission Factors for Locomotives","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":"https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100500B.TXT","ref_kind":"research_report","section":"fn 58","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249807,"raw_reference":"Graver and Frey (2013)","cited_authors":"Graver and Frey","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 3.5.4 Fuel and Emissions","page":null,"context_sentence":null,"paper_id":27499,"paper_title":"Comparison of Locomotive Emissions Measured during Dynamometer versus Rail Yard Engine Load Tests","paper_year":2013,"paper_doi":"10.3141/2341-03"},{"citation_id":249808,"raw_reference":"Williams, M. K. (2011). Using simulation to understand bottlenecks, delay accumulation, and rail network flow. In Proceedings of the Annual AREMA Conference.","cited_authors":"Williams, M. K.","cited_year":"2011","cited_title":"Using simulation to understand bottlenecks, delay accumulation, and rail network flow","cited_venue":"Proceedings of the Annual AREMA Conference","cited_doi":null,"cited_url":null,"ref_kind":"conference_paper","section":"fn 71","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249809,"raw_reference":"Lai, Y.-C., & Barkan, C. (2009). Enhanced Parametric Railway Capacity Evaluation Tool. Transportation Research Record, 2117, 33–40.","cited_authors":"Lai, Y.-C., & Barkan, C.","cited_year":"2009","cited_title":"Enhanced Parametric Railway Capacity Evaluation Tool","cited_venue":"Transportation Research Record, 2117","cited_doi":"10.3141/2117-05","cited_url":"https://doi.org/10.3141/2117-05","ref_kind":"journal_article","section":"fn 72","page":null,"context_sentence":null,"paper_id":27460,"paper_title":"Enhanced Parametric Railway Capacity Evaluation Tool","paper_year":2009,"paper_doi":"10.3141/2117-05"},{"citation_id":249810,"raw_reference":"Sogin et al. (2016)","cited_authors":"Sogin et al.","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.6.2.3 Cost of Congestion on Alternate Route","page":null,"context_sentence":null,"paper_id":27480,"paper_title":"Analyzing the transition from single- to double-track railway lines with nonlinear regression analysis","paper_year":2015,"paper_doi":"10.1177/0954409715616998"},{"citation_id":249811,"raw_reference":"Dingler (2010)","cited_authors":"Dingler","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.6.2.3 Cost of Congestion on Alternate Route","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249812,"raw_reference":"Bureau of Labor Statistics. “Employer Costs for Employee Compensation – December 2011.” News Release","cited_authors":"Bureau of Labor Statistics","cited_year":"2011","cited_title":"Employer Costs for Employee Compensation – December 2011","cited_venue":"Bureau of Labor Statistics, Department of Labor","cited_doi":null,"cited_url":"https://www.bls.gov/news.release/pdf/ecec.pdf","ref_kind":"government_report","section":"Section 4.2.1 Crew Costs","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249813,"raw_reference":"Bureau of Transportation Statistics. “Rail Profile” U.S. Department of Transportation. Last accessed January 21, 2021.","cited_authors":"Bureau of Transportation Statistics","cited_year":"2021","cited_title":"Rail Profile","cited_venue":"U.S. Department of Transportation","cited_doi":null,"cited_url":"https://www.bts.gov/content/rail-profile","ref_kind":"dataset","section":"fn 87 / Section 4.2.2 Equipment Costs","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249814,"raw_reference":"American Public Transportation Association. (2018). 2018 Public Transportation Fact Book.","cited_authors":"American Public Transportation Association","cited_year":"2018","cited_title":"2018 Public Transportation Fact Book","cited_venue":"American Public Transportation Association","cited_doi":null,"cited_url":"https://www.apta.com/wp-content/uploads/Resources/resources/statistics/Documents/FactBook/2018-APTAFact-Book.pdf","ref_kind":"research_report","section":"fn 100 / Section 4.3.2.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249815,"raw_reference":"Office of Budget and Policy. (December 2019). 2018 National Transit Summaries and Trends.","cited_authors":"Office of Budget and Policy","cited_year":"2019","cited_title":"2018 National Transit Summaries and Trends","cited_venue":"Federal Transit Administration","cited_doi":null,"cited_url":"https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/ntd/data-product/134401/2018-ntst_1.pdf","ref_kind":"dataset","section":"fn 99 / Section 4.3.2.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249816,"raw_reference":"Hagemann et al (2013)","cited_authors":"Hagemann et al.","cited_year":"2013","cited_title":null,"cited_venue":"Federal Motor Carrier Safety Administration","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 5.2.2 Fuel and Emissions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249817,"raw_reference":"U.S. Census Bureau, (December 2019) “Percent Urban and Rural In 2010 by State and County,”","cited_authors":"U.S. Census Bureau","cited_year":"2019","cited_title":"Percent Urban and Rural In 2010 by State and County","cited_venue":"The United States Census Bureau","cited_doi":null,"cited_url":"https://www.census.gov/programs-surveys/geography/guidance/geo-areas/urbanrural/2010-urban-rural.html","ref_kind":"dataset","section":"Section 5.1.3 / Section 5.1 urban-rural designation","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249818,"raw_reference":"Federal Highway Administration. “Traffic Volume Data – FHWA’s TMAS Data Program”","cited_authors":"Federal Highway Administration","cited_year":null,"cited_title":"Traffic Volume Data – FHWA’s TMAS Data Program","cited_venue":"FHWA","cited_doi":null,"cited_url":"https://explore.dot.gov/views/2017-19TMASDashboard_20200414_v10_5/TMAS1719Dashboard?:iid=1&:isGuestRedirectFromVizportal=y&:embed=y","ref_kind":"dataset","section":"Section 5.3 Costs of Roadway Closure Model","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249819,"raw_reference":"Surface Transportation Board. “Annual Report Financial Data: R-1, Schd. 710-S.”","cited_authors":"Surface Transportation Board","cited_year":null,"cited_title":"Annual Report Financial Data: R-1, Schd. 710-S","cited_venue":"Surface Transportation Board","cited_doi":null,"cited_url":"https://www.stb.gov/reportsdata/economic-data/annual-report-financial-data/","ref_kind":"dataset","section":"fn 50","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":249820,"raw_reference":"S&P Global. “Trinity Rail Leasing 2021 LLC (Series 2021-1).” June 17, 2021.","cited_authors":"S&P Global","cited_year":"2021","cited_title":"Trinity Rail Leasing 2021 LLC (Series 2021-1)","cited_venue":"S&P Global","cited_doi":null,"cited_url":"https://www.spglobal.com/_assets/documents/ratings/research/12001201.pdf","ref_kind":"research_report","section":"fn 51","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250153,"raw_reference":"Abt Associates. (2017). Valuation of Crude Oil Spilled in Transportation Incidents.","cited_authors":"Abt Associates","cited_year":"2017","cited_title":"Valuation of Crude Oil Spilled in Transportation Incidents","cited_venue":"Prepared for Pipeline and Hazardous Materials Safety Administration","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 1.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250154,"raw_reference":"Chen, J., Lei, X., Zhang, L., & Peng, B. (2015). Using extreme value theory approaches to forecast the probability of outbreak of highly pathogenic influenza in Zhejiang, China. PLoS ONE, 10(2), e0118521.","cited_authors":"Chen, J.; Lei, X.; Zhang, L.; Peng, B.","cited_year":"2015","cited_title":"Using extreme value theory approaches to forecast the probability of outbreak of highly pathogenic influenza in Zhejiang, China","cited_venue":"PLoS ONE","cited_doi":"10.1371/journal.pone.0118521","cited_url":null,"ref_kind":"journal_article","section":"Section 4 (Conclusions)","page":null,"context_sentence":null,"paper_id":27461,"paper_title":"Using Extreme Value Theory Approaches to Forecast the Probability of Outbreak of Highly Pathogenic Influenza in Zhejiang, China","paper_year":2015,"paper_doi":"10.1371/journal.pone.0118521"},{"citation_id":250155,"raw_reference":"Cheng, N., Li, M., Liu, P., Luo, Q., Tang, C., & Zhang, W. (2021). Pipeline and Property Values: A Nationwide Hedonic Analysis of Pipeline Accidents Over the Past Three Decades. Paper presented at the 2021 Annual Meeting, August 1-3, Austin, Texas.","cited_authors":"Cheng, N.; Li, M.; Liu, P.; Luo, Q.; Tang, C.; Zhang, W.","cited_year":"2021","cited_title":"Pipeline and Property Values: A Nationwide Hedonic Analysis of Pipeline Accidents Over the Past Three Decades","cited_venue":"2021 Annual Meeting, Austin, Texas","cited_doi":null,"cited_url":null,"ref_kind":"conference_paper","section":"Section 3.9 / footnote 9","page":null,"context_sentence":null,"paper_id":59509,"paper_title":"Pipeline and Property Values: A Nationwide Hedonic Analysis of Pipeline Accidents Over the Past Three Decades","paper_year":2021,"paper_doi":"10.22004/ag.econ.312676"},{"citation_id":250156,"raw_reference":"Malevergne, Y., Pisarenko, V., & Sornette, D. (2006). On the power of generalized extreme value (GEV) and generalized Pareto distribution (GPD) estimators for empirical distributions of stock returns. Applied Financial Economics, 16(3), 271-289.","cited_authors":"Malevergne, Y.; Pisarenko, V.; Sornette, D.","cited_year":"2006","cited_title":"On the power of generalized extreme value (GEV) and generalized Pareto distribution (GPD) estimators for empirical distributions of stock returns","cited_venue":"Applied Financial Economics","cited_doi":"10.1080/09603100500391008","cited_url":null,"ref_kind":"journal_article","section":"Section 4 (Conclusions)","page":null,"context_sentence":null,"paper_id":27462,"paper_title":"On the power of generalized extreme value (GEV) and generalized Pareto distribution (GPD) estimators for empirical distributions of stock returns","paper_year":2005,"paper_doi":"10.1080/09603100500391008"},{"citation_id":250157,"raw_reference":"National Transportation Safety Board. (2017a). National Transportation Safety Board Railroad Accident Brief: BNSF Railway Crude Oil Unit Train Derailment, Heimdal, North Dakota.","cited_authors":"National Transportation Safety Board","cited_year":"2017","cited_title":"Railroad Accident Brief: BNSF Railway Crude Oil Unit Train Derailment, Heimdal, North Dakota","cited_venue":"NTSB","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/RAB1712.pdf","ref_kind":"government_report","section":"Section 1.3.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250158,"raw_reference":"National Transportation Safety Board. (2017b). Casselton, North Dakota train derailment and subsequent train collision, release of hazardous materials, and fire.","cited_authors":"National Transportation Safety Board","cited_year":"2017","cited_title":"Train Derailment and Subsequent Train Collision, Release of Hazardous Materials, and Fire, Casselton, North Dakota","cited_venue":"NTSB","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/RAB1701.pdf","ref_kind":"government_report","section":"Section 1.3.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250159,"raw_reference":"National Transportation Safety Board. (2021). December 22, 2020, Derailment of BNSF Railway Freight Train U-TNDFEP-0-36T and Subsequent Hazardous Materials Release.","cited_authors":"National Transportation Safety Board","cited_year":"2021","cited_title":"December 22, 2020, Derailment of BNSF Railway Freight Train U-TNDFEP-0-36T and Subsequent Hazardous Materials Release","cited_venue":"NTSB","cited_doi":null,"cited_url":"https://data.ntsb.gov/Docket/?NTSBNumber=HMD21LR001","ref_kind":"government_report","section":"Section 1.3.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250160,"raw_reference":"Plains All American Pipeline. (2020). Form 10-K (Annual Report) Filed 2021-03-01 for the fiscal year ended December 31, 2020.","cited_authors":"Plains All American Pipeline","cited_year":"2020","cited_title":"Form 10-K (Annual Report) for fiscal year ended December 31, 2020","cited_venue":"SEC","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 1.3.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250161,"raw_reference":"Enbridge Inc. (2017). Annual Report: 2016.","cited_authors":"Enbridge Inc.","cited_year":"2017","cited_title":"Annual Report: 2016","cited_venue":"Enbridge Inc.","cited_doi":null,"cited_url":"https://www.enbridge.com/investmentcenter/~/media/Enb/Documents/Investor%20Relations/2017/2016_ENB_EI_AnnualReport_Web.pdf","ref_kind":"other","section":"Section 1.3.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250162,"raw_reference":"Enbridge Inc. (2018). Annual Report: 2017.","cited_authors":"Enbridge Inc.","cited_year":"2018","cited_title":"Annual Report: 2017","cited_venue":"Enbridge Inc.","cited_doi":null,"cited_url":"https://www.enbridge.com/~/media/Enb/Documents/Investor%20Relations/2018/2017_ENB_AnnualReport_Full_optimized.pdf","ref_kind":"other","section":"Section 1.3.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250163,"raw_reference":"U.S. Department of Transportation. (2022). Departmental Guidance on Valuation of a Statistical Life in Economic Analysis.","cited_authors":"U.S. Department of Transportation","cited_year":"2022","cited_title":"Departmental Guidance on Valuation of a Statistical Life in Economic Analysis","cited_venue":"U.S. DOT","cited_doi":null,"cited_url":"https://www.transportation.gov/office-policy/transportation-policy/revised-departmental-guidance-on-valuation-of-a-statistical-life-in-economic-analysis","ref_kind":"government_report","section":"Section 1.3.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250164,"raw_reference":"U.S. Energy Information Administration. (2023). Total Crude Oil by Rail (Thousand Barrels).","cited_authors":"U.S. Energy Information Administration","cited_year":"2023","cited_title":"Total Crude Oil by Rail (Thousand Barrels)","cited_venue":"U.S. EIA","cited_doi":null,"cited_url":"https://www.eia.gov/dnav/pet/hist/LeafHandler.ashx?n=PET&s=ESM_EPC0_RAIL_ZAMNZAMN_MBBL&f=M","ref_kind":"dataset","section":"Section 1.3.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250165,"raw_reference":"U.S. Environmental Protection Agency. (2016a). Ash Coulee Spill. December 2016.","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2016","cited_title":"Ash Coulee Spill","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":"https://response.epa.gov/site/site_profile.aspx?site_id=11952","ref_kind":"web_page","section":"Section 1.3.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250166,"raw_reference":"U.S. Environmental Protection Agency. (2016b). Pollution/Situation Report. ENTERPRISE PIPELINE SPILL- E17602 -- Polrep #3.","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2016","cited_title":"Pollution/Situation Report. ENTERPRISE PIPELINE SPILL- E17602 -- Polrep #3","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":"https://response.epa.gov/site/sitrep_profile.aspx?site_id=11890&counter=27892","ref_kind":"web_page","section":"Section 1.3.1 / References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250167,"raw_reference":"Chang et al. (2014) developed a general framework to evaluate a range of biophysical and social characteristics that influence the potential consequences of oil spills.","cited_authors":"Chang et al.","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Appendix A, Section 2.1","page":null,"context_sentence":null,"paper_id":50178,"paper_title":"Consequences of oil spills: a review and framework for informing planning","paper_year":2014,"paper_doi":"10.5751/es-06406-190226"},{"citation_id":250168,"raw_reference":"Etkin (2004) developed the Basic Oil Spill Cost Estimation Model (BOSCEM) for the U.S. Environmental Protection Agency.","cited_authors":"Etkin, D.S.","cited_year":"2004","cited_title":"Basic Oil Spill Cost Estimation Model (BOSCEM)","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix A, Section 2.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":250169,"raw_reference":"Helton and Penn (1999) evaluated natural resource damage assessments (NRDAs) in the context of the total costs associated with oil release incidents.","cited_authors":"Helton; Penn","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix A, Section 2.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252057,"raw_reference":"Abt Associates, Inc. and Bear Peak Economics. 2014. Potential Fishing Impacts and Natural Resource Damages from Worst-Case Discharges of Oil on the Columbia River.","cited_authors":"Abt Associates, Inc.; Bear Peak Economics","cited_year":"2014","cited_title":"Potential Fishing Impacts and Natural Resource Damages from Worst-Case Discharges of Oil on the Columbia River","cited_venue":"EFSEC Case Number 15-001","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252058,"raw_reference":"Caleyo, F., Velázquez, J. C., Valor, A., & Hallen, J. M. 2009. Probability distribution of pitting corrosion depth and rate in underground pipelines: A Monte Carlo study. Corrosion Science, 51(9), 1925-1934.","cited_authors":"Caleyo, F.; Velázquez, J. C.; Valor, A.; Hallen, J. M.","cited_year":"2009","cited_title":"Probability distribution of pitting corrosion depth and rate in underground pipelines: A Monte Carlo study","cited_venue":"Corrosion Science","cited_doi":"10.1016/j.corsci.2009.05.019","cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":27463,"paper_title":"Probability distribution of pitting corrosion depth and rate in underground pipelines: A Monte Carlo study","paper_year":2009,"paper_doi":"10.1016/j.corsci.2009.05.019"},{"citation_id":252059,"raw_reference":"Chang, S.E., J. Stone, K. Demes, and M. Piscitelli. 2014. Consequences of Oil Spills: A Review and Framework for Informing Planning. Ecology and Society (19): 26.","cited_authors":"Chang, S.E.; Stone, J.; Demes, K.; Piscitelli, M.","cited_year":"2014","cited_title":"Consequences of Oil Spills: A Review and Framework for Informing Planning","cited_venue":"Ecology and Society","cited_doi":"10.5751/es-06406-190226","cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":50178,"paper_title":"Consequences of oil spills: a review and framework for informing planning","paper_year":2014,"paper_doi":"10.5751/es-06406-190226"},{"citation_id":252060,"raw_reference":"Dawotola, A. W., Trafalis, T. B., Mustaffa, Z., Van Gelder, P. H. A. J. M., & Vrijling, J. K. 2012. Risk-based maintenance of a cross-country petroleum pipeline system. Journal of Pipeline Systems Engineering and Practice, 4(3), 141-148.","cited_authors":"Dawotola, A. W.; Trafalis, T. B.; Mustaffa, Z.; Van Gelder, P. H. A. J. M.; Vrijling, J. K.","cited_year":"2012","cited_title":"Risk-based maintenance of a cross-country petroleum pipeline system","cited_venue":"Journal of Pipeline Systems Engineering and Practice","cited_doi":"10.1061/(asce)ps.1949-1204.0000121","cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":50179,"paper_title":"Risk-Based Maintenance of a Cross-Country Petroleum Pipeline System","paper_year":2012,"paper_doi":"10.1061/(asce)ps.1949-1204.0000121"},{"citation_id":252061,"raw_reference":"Dawotola, A. W., Van Gelder, P. H. A. J. M., & Vrijling, J. K. 2009. Risk Assessment of Petroleum Pipelines using a combined Analytical Hierarchy Process-Fault Tree Analysis (AHP-FTA).","cited_authors":"Dawotola, A. W.; Van Gelder, P. H. A. J. M.; Vrijling, J. K.","cited_year":"2009","cited_title":"Risk Assessment of Petroleum Pipelines using a combined Analytical Hierarchy Process-Fault Tree Analysis (AHP-FTA)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252062,"raw_reference":"Etkin, D.S. 2004. Modeling Oil Spill Response and Damage Costs. Proceedings of the 5th Biennial Freshwater Spills Symposium.","cited_authors":"Etkin, D.S.","cited_year":"2004","cited_title":"Modeling Oil Spill Response and Damage Costs","cited_venue":"Proceedings of the 5th Biennial Freshwater Spills Symposium","cited_doi":null,"cited_url":null,"ref_kind":"conference_paper","section":"References","page":null,"context_sentence":null,"paper_id":59388,"paper_title":"MODELING OIL SPILL RESPONSE AND DAMAGE COSTS","paper_year":2004,"paper_doi":null},{"citation_id":252063,"raw_reference":"Girgin, S., & Krausmann, E. 2016. Historical analysis of US onshore hazardous liquid pipeline accidents triggered by natural hazards. Journal of Loss Prevention in the Process Industries, 40, 578-590.","cited_authors":"Girgin, S.; Krausmann, E.","cited_year":"2016","cited_title":"Historical analysis of US onshore hazardous liquid pipeline accidents triggered by natural hazards","cited_venue":"Journal of Loss Prevention in the Process Industries","cited_doi":"10.1016/j.jlp.2016.02.008","cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":27464,"paper_title":"Historical analysis of U.S. onshore hazardous liquid pipeline accidents triggered by natural hazards","paper_year":2016,"paper_doi":"10.1016/j.jlp.2016.02.008"},{"citation_id":252064,"raw_reference":"Hallenbeck, M.E., A. Goodchild, and J. Drescher. 2014. Travel Costs Associated with Flood Closures of State Highways Near Centralia/Chehalis, Washington.","cited_authors":"Hallenbeck, M.E.; Goodchild, A.; Drescher, J.","cited_year":"2014","cited_title":"Travel Costs Associated with Flood Closures of State Highways Near Centralia/Chehalis, Washington","cited_venue":"Washington Transportation Center (TRAC-UW)","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":59602,"paper_title":"Travel costs associated with flood closures of state highways near Centralia/Chehalis, Washington.","paper_year":2014,"paper_doi":null},{"citation_id":252065,"raw_reference":"Hansen, J., E.D. Benson, and D.A. Hagen. No date. Environmental Hazards and Residential Property Values: Evidence from a Major Pipeline Event.","cited_authors":"Hansen, J.; Benson, E.D.; Hagen, D.A.","cited_year":null,"cited_title":"Environmental Hazards and Residential Property Values: Evidence from a Major Pipeline Event","cited_venue":null,"cited_doi":"10.3368/le.82.4.529","cited_url":null,"ref_kind":"working_paper","section":"References","page":null,"context_sentence":null,"paper_id":21298,"paper_title":"Environmental Hazards and Residential Property Values: Evidence from a Major Pipeline Event","paper_year":2006,"paper_doi":"10.3368/le.82.4.529"},{"citation_id":252066,"raw_reference":"Helton, D. and T. Penn. 1999. Putting Response and Natural Resource Damage Costs in Perspective. International Oil Spill Conference Proceedings: March 1999: 577-583.","cited_authors":"Helton, D.; Penn, T.","cited_year":"1999","cited_title":"Putting Response and Natural Resource Damage Costs in Perspective","cited_venue":"International Oil Spill Conference Proceedings","cited_doi":"10.7901/2169-3358-1999-1-577","cited_url":null,"ref_kind":"conference_paper","section":"References","page":null,"context_sentence":null,"paper_id":27465,"paper_title":"Putting Response and Natural Resource Damage Costs in Perspective1","paper_year":1999,"paper_doi":"10.7901/2169-3358-1999-1-577"},{"citation_id":252067,"raw_reference":"Hill, R. T. and A.D. Director. 1993. Pipeline risk analysis. In Institution of Chemical Engineers Symposium Series (Vol. 130, pp. 657-657).","cited_authors":"Hill, R. T.; Director, A.D.","cited_year":"1993","cited_title":"Pipeline risk analysis","cited_venue":"Institution of Chemical Engineers Symposium Series","cited_doi":null,"cited_url":null,"ref_kind":"book_chapter","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252068,"raw_reference":"Hovey, Diane J., Edward J. Farmer. 1993. PIPELINE ACCIDENT, FAILURE PROBABILITY DETERMINED FROM HISTORICAL DATA. Oil and Gas Journal.","cited_authors":"Hovey, Diane J.; Farmer, Edward J.","cited_year":"1993","cited_title":"Pipeline accident, failure probability determined from historical data","cited_venue":"Oil and Gas Journal","cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":59313,"paper_title":"PIPELINE ACCIDENT, FAILURE PROBABILITY DETERMINED FROM HISTORICAL DATA","paper_year":1993,"paper_doi":null},{"citation_id":252069,"raw_reference":"Jepson, Michael and Lisa L. Colburn 2013. Development of Social Indicators of Fishing Community Vulnerability and Resilience in the U.S. Southeast and Northeast Regions. NOAA Technical Memorandum NMFS-F/SPO-129.","cited_authors":"Jepson, Michael; Colburn, Lisa L.","cited_year":"2013","cited_title":"Development of Social Indicators of Fishing Community Vulnerability and Resilience in the U.S. Southeast and Northeast Regions","cited_venue":"NOAA Technical Memorandum NMFS-F/SPO-129","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":59428,"paper_title":"Development of social indicators of fishing community vulnerability and resilience in the U.S. Southeast and Northeast regions","paper_year":2013,"paper_doi":null},{"citation_id":252070,"raw_reference":"Johnston, Robert J., et al. (eds). 2015. Benefit Transfer of Environmental and Resource Values. Springer Science + Business Media.","cited_authors":"Johnston, Robert J.; et al.","cited_year":"2015","cited_title":"Benefit Transfer of Environmental and Resource Values","cited_venue":"Springer Science + Business Media","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"References","page":null,"context_sentence":null,"paper_id":22484,"paper_title":"Benefit Transfer of Environmental and Resource Values: A Guide for Researchers and Practitioners","paper_year":2015,"paper_doi":"10.1007/978-94-017-9930-0"},{"citation_id":252071,"raw_reference":"Johnston, R.J., E. Besedin, and M. Ranson. 2006. Characterizing the Effects of Valuation Methodology in Function-Based Benefits Transfer. Ecological Economics 60(2): 407-419.","cited_authors":"Johnston, R.J.; Besedin, E.; Ranson, M.","cited_year":"2006","cited_title":"Characterizing the Effects of Valuation Methodology in Function-Based Benefits Transfer","cited_venue":"Ecological Economics","cited_doi":"10.1016/j.ecolecon.2006.03.020","cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":50180,"paper_title":"Characterizing the effects of valuation methodology in function-based benefits transfer","paper_year":2006,"paper_doi":"10.1016/j.ecolecon.2006.03.020"},{"citation_id":252072,"raw_reference":"Lovett, A.H., C.T. Dick, and C.P.L. Barkan. 2015. Determining Freight Train Delay Costs on Railroad Lines in North America.","cited_authors":"Lovett, A.H.; Dick, C.T.; Barkan, C.P.L.","cited_year":"2015","cited_title":"Determining Freight Train Delay Costs on Railroad Lines in North America","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252073,"raw_reference":"Merten, A.A. and C.B. Henry. 2008. Decision-Making Process to Use In-Situ Burning to Restore an Oiled Intermediate Marsh Following Hurricanes Katrina and Rita. International Oil Spill Conference: 545-550.","cited_authors":"Merten, A.A.; Henry, C.B.","cited_year":"2008","cited_title":"Decision-Making Process to Use In-Situ Burning to Restore an Oiled Intermediate Marsh Following Hurricanes Katrina and Rita","cited_venue":"International Oil Spill Conference","cited_doi":"10.7901/2169-3358-2008-1-545","cited_url":null,"ref_kind":"conference_paper","section":"References","page":null,"context_sentence":null,"paper_id":50181,"paper_title":"DECISION-MAKING PROCESS TO USE IN-SITUBURNING TO RESTORE AN OILED INTERMEDIATE MARSH FOLLOWING HURRICANES KATRINA AND RITA","paper_year":2008,"paper_doi":"10.7901/2169-3358-2008-1-545"},{"citation_id":252074,"raw_reference":"Mesa-Arango, R., X. Zhan, S.V. Ukkusuri, A. Mitra, and F. Mannering. 2013. Estimating the Economic Impacts of Disruptions to Intermodal Freight Systems Traffic. NEXTRANS Project No. 053PY03: Final Report.","cited_authors":"Mesa-Arango, R.; Zhan, X.; Ukkusuri, S.V.; Mitra, A.; Mannering, F.","cited_year":"2013","cited_title":"Estimating the Economic Impacts of Disruptions to Intermodal Freight Systems Traffic","cited_venue":"NEXTRANS Project No. 053PY03","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":59575,"paper_title":"Estimating the Economic Impacts of Disruptions to Intermodal Freight Systems Traffic","paper_year":2013,"paper_doi":null},{"citation_id":252075,"raw_reference":"National Transportation Safety Board (NTSB). 2012. Accident Report: Enbridge Incorporated Hazardous Liquid Pipeline Rupture and Release, Marshall Michigan, July 25, 2010. NTSB/PAR-12/01.","cited_authors":"National Transportation Safety Board","cited_year":"2012","cited_title":"Accident Report: Enbridge Incorporated Hazardous Liquid Pipeline Rupture and Release, Marshall Michigan, July 25, 2010","cited_venue":"NTSB/PAR-12/01","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section 7.3.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252076,"raw_reference":"National Transportation Safety Board (NTSB). 2016. CSXT Petroleum Crude Oil Train Derailment and Hazardous Materials Release: DCA14FR008. NTSB/RAB-16/01.","cited_authors":"National Transportation Safety Board","cited_year":"2016","cited_title":"CSXT Petroleum Crude Oil Train Derailment and Hazardous Materials Release: DCA14FR008","cited_venue":"NTSB/RAB-16/01","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252077,"raw_reference":"National Transportation Safety Board (NTSB). 2013. Pipeline Accident Brief: DCA-10-FP-009. NTSB/PAB-13/03.","cited_authors":"National Transportation Safety Board","cited_year":"2013","cited_title":"Pipeline Accident Brief: DCA-10-FP-009","cited_venue":"NTSB/PAB-13/03","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252078,"raw_reference":"Oak Ridge National Laboratory (ORNL). 2012. Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves on Hazardous Liquids and Natural Gas Pipelines. ORNL/TM-2012/411.","cited_authors":"Oak Ridge National Laboratory","cited_year":"2012","cited_title":"Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves on Hazardous Liquids and Natural Gas Pipelines with Respect to Public and Environmental Safety","cited_venue":"ORNL/TM-2012/411","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":273,"paper_title":"Studies for the requirements of automatic and remotely controlled shutoff valves on hazardous liquids and natural gas pipelines with respect to public and environmental safety","paper_year":2012,"paper_doi":"10.2172/1373899"},{"citation_id":252079,"raw_reference":"Pacific Coast Business Times. 2015a. Refugio oil spill pipeline might take five years to get back online. November 5, 2015.","cited_authors":"Pacific Coast Business Times","cited_year":"2015","cited_title":"Refugio oil spill pipeline might take five years to get back online","cited_venue":"Pacific Coast Business Times","cited_doi":null,"cited_url":"http://www.pacbiztimes.com/2015/11/05/refugio-oil-spill-pipeline-might-take-five-years-to-get-back-online/","ref_kind":"news","section":"Section 7.3.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252080,"raw_reference":"Pacific Coast Business Times. 2015b. 3 months after oil spill, Santa Barbara region recovering. August 8, 2015.","cited_authors":"Pacific Coast Business Times","cited_year":"2015","cited_title":"3 months after oil spill, Santa Barbara region recovering","cited_venue":"Pacific Coast Business Times","cited_doi":null,"cited_url":"http://www.pacbiztimes.com/2015/08/14/3-months-after-oil-spill-santa-barbara-region-recovering/","ref_kind":"news","section":"Section 7.3.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252081,"raw_reference":"Pipeline and Hazardous Materials Safety Administration (PHMSA). 2016a. Preliminary Regulatory Impact Analysis for Hazardous Materials: Oil Spill Response Plans and Information Sharing for High-Hazard Flammable Trains. PHMSA-2014-0105 (HM-251B).","cited_authors":"Pipeline and Hazardous Materials Safety Administration","cited_year":"2016","cited_title":"Preliminary Regulatory Impact Analysis for Hazardous Materials: Oil Spill Response Plans and Information Sharing for High-Hazard Flammable Trains","cited_venue":"PHMSA-2014-0105 (HM-251B)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252082,"raw_reference":"Pipeline and Hazardous Materials Safety Administration (PHMSA). 2015. Final Regulatory Impact Analysis for Hazardous Materials: Enhanced Tank Car Standards and Operational Controls for High-Hazard Flammable Trains. PHMSA-2012-0082.","cited_authors":"Pipeline and Hazardous Materials Safety Administration","cited_year":"2015","cited_title":"Final Regulatory Impact Analysis for Hazardous Materials: Enhanced Tank Car Standards and Operational Controls for High-Hazard Flammable Trains","cited_venue":"PHMSA-2012-0082","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252083,"raw_reference":"Restrepo, C. E., Simonoff, J. S., & Zimmerman, R. (2009). Causes, cost consequences, and risk implications of accidents in US hazardous liquid pipeline infrastructure. International Journal of Critical Infrastructure Protection, 2(1), 38-50.","cited_authors":"Restrepo, C. E.; Simonoff, J. S.; Zimmerman, R.","cited_year":"2009","cited_title":"Causes, cost consequences, and risk implications of accidents in US hazardous liquid pipeline infrastructure","cited_venue":"International Journal of Critical Infrastructure Protection","cited_doi":"10.1016/j.ijcip.2008.09.001","cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":27466,"paper_title":"Causes, cost consequences, and risk implications of accidents in US hazardous liquid pipeline infrastructure","paper_year":2008,"paper_doi":"10.1016/j.ijcip.2008.09.001"},{"citation_id":252084,"raw_reference":"Simons, R. A. 1999. Settlement of an Oil Pipeline Leak with Contaminated Residential Property: A Case Study. Real Estate Issues, 24(2), 46-52.","cited_authors":"Simons, R. A.","cited_year":"1999","cited_title":"Settlement of an Oil Pipeline Leak with Contaminated Residential Property: A Case Study","cited_venue":"Real Estate Issues","cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252085,"raw_reference":"Simons, R. A., Bowen, W. M., & Sementelli, A. 1996. The Effect of Underground Storage Tanks on Residential Property Values in Cuyahoga County Ohio. Journal of Real Estate Research, 14, 29-42.","cited_authors":"Simons, R. A.; Bowen, W. M.; Sementelli, A.","cited_year":"1996","cited_title":"The Effect of Underground Storage Tanks on Residential Property Values in Cuyahoga County Ohio","cited_venue":"Journal of Real Estate Research","cited_doi":"10.1080/10835547.1997.12090890","cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":27467,"paper_title":"The Effect of Underground Storage Tanks on Residential Property Values in Cuyahoga County, Ohio","paper_year":1997,"paper_doi":"10.1080/10835547.1997.12090890"},{"citation_id":252086,"raw_reference":"Simons, R. A., Mikelbank, B. A., & Winson, K. 2001. The Effects of An Oil Pipeline Rupture on Single Family House Prices. The Appraisal Journal.","cited_authors":"Simons, R. A.; Mikelbank, B. A.; Winson, K.","cited_year":"2001","cited_title":"The Effects of An Oil Pipeline Rupture on Single Family House Prices","cited_venue":"The Appraisal Journal","cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":59309,"paper_title":"The Effects of An Oil Pipeline Rupture on Single Family House Prices","paper_year":2001,"paper_doi":null},{"citation_id":252087,"raw_reference":"Steen, A., D.E. Fritz, W. Stubblefield, and J. Giddings. 1999. Environmental Effects of Freshwater Oil Spills. 1999 International Oil Spill Conference: 607-612.","cited_authors":"Steen, A.; Fritz, D.E.; Stubblefield, W.; Giddings, J.","cited_year":"1999","cited_title":"Environmental Effects of Freshwater Oil Spills","cited_venue":"1999 International Oil Spill Conference","cited_doi":"10.7901/2169-3358-1999-1-607","cited_url":null,"ref_kind":"conference_paper","section":"References","page":null,"context_sentence":null,"paper_id":27468,"paper_title":"Environmental Effects of Freshwater Oil Spills","paper_year":1999,"paper_doi":"10.7901/2169-3358-1999-1-607"},{"citation_id":252088,"raw_reference":"United States Department of Transportation (U.S. DOT). 2016. Guidance on Treatment of the Economic Value of a Statistical Life (VSL) in U.S. Department of Transportation Analyses – 2016 Adjustment.","cited_authors":"U.S. Department of Transportation","cited_year":"2016","cited_title":"Guidance on Treatment of the Economic Value of a Statistical Life (VSL) in U.S. Department of Transportation Analyses – 2016 Adjustment","cited_venue":"U.S. DOT","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252089,"raw_reference":"United States Environmental Protection Agency (U.S. EPA) Science Advisory Board (SAB). 2009. Valuing the Protection of Ecological Systems and Services. EPA-SAB-09-012.","cited_authors":"U.S. EPA Science Advisory Board","cited_year":"2009","cited_title":"Valuing the Protection of Ecological Systems and Services","cited_venue":"EPA-SAB-09-012","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252090,"raw_reference":"United States Fish and Wildlife Service (USFWS), et al. 2015. Final Damage Assessment and Restoration Plan/Environmental Assessment for the July 25-26, 2010 Enbridge Line 6B Oil Discharges near Marshall, MI.","cited_authors":"United States Fish and Wildlife Service; Nottawaseppi Huron Band of the Potawatomi Tribe; Match-E-Be-Nash-She-Wish Band of the Pottawatomi Indians","cited_year":"2015","cited_title":"Final Damage Assessment and Restoration Plan/Environmental Assessment for the July 25-26, 2010 Enbridge Line 6B Oil Discharges near Marshall, MI","cited_venue":"USFWS","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section 7.3.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252091,"raw_reference":"United States Fish and Wildlife Service (USFWS) and United States Census Bureau. 2014. 2011 National Survey of Fishing, Hunting, and Wildlife-Associated Recreation. FHW/11-NAT (RV).","cited_authors":"U.S. Fish and Wildlife Service; U.S. Census Bureau","cited_year":"2014","cited_title":"2011 National Survey of Fishing, Hunting, and Wildlife-Associated Recreation","cited_venue":"FHW/11-NAT (RV)","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252092,"raw_reference":"Weinstein, B. L., & Clower, T. L. 1998. The Impacts of the Union Pacific Service Disruptions on the Texas and National Economies: An Unfinished Story.","cited_authors":"Weinstein, B. L.; Clower, T. L.","cited_year":"1998","cited_title":"The Impacts of the Union Pacific Service Disruptions on the Texas and National Economies: An Unfinished Story","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"working_paper","section":"References","page":null,"context_sentence":null,"paper_id":59374,"paper_title":"The Impacts of the Union Pacific Service Disruptions on the Texas and National Economies: An Unfinished Story","paper_year":1998,"paper_doi":null},{"citation_id":252093,"raw_reference":"Woolridge, J.M. 2010. Econometric Analysis of Cross Section and Panel Data. 2nd ed., The MIT Press.","cited_authors":"Wooldridge, J.M.","cited_year":"2010","cited_title":"Econometric Analysis of Cross Section and Panel Data","cited_venue":"The MIT Press","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252094,"raw_reference":"Zhang, Y., M.K. Lindell, and C.S. Prater. 2009. Vulnerability of Community Businesses to Environmental Disasters. Disasters 33: 38-57.","cited_authors":"Zhang, Y.; Lindell, M.K.; Prater, C.S.","cited_year":"2009","cited_title":"Vulnerability of Community Businesses to Environmental Disasters","cited_venue":"Disasters","cited_doi":"10.1111/j.1467-7717.2008.01061.x","cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":28314,"paper_title":"Vulnerability of community businesses to environmental disasters","paper_year":2008,"paper_doi":"10.1111/j.1467-7717.2008.01061.x"},{"citation_id":252095,"raw_reference":"Shahriar, A., Sadiq, R., & Tesfamariam, S. 2012. Risk analysis for oil & gas pipelines: A sustainability assessment approach using fuzzy based bow-tie analysis. Journal of Loss Prevention in the Process Industries, 25(3), 505-523.","cited_authors":"Shahriar, A.; Sadiq, R.; Tesfamariam, S.","cited_year":"2012","cited_title":"Risk analysis for oil & gas pipelines: A sustainability assessment approach using fuzzy based bow-tie analysis","cited_venue":"Journal of Loss Prevention in the Process Industries","cited_doi":"10.1016/j.jlp.2011.12.007","cited_url":null,"ref_kind":"journal_article","section":"References","page":null,"context_sentence":null,"paper_id":27469,"paper_title":"Risk analysis for oil & gas pipelines: A sustainability assessment approach using fuzzy based bow-tie analysis","paper_year":2011,"paper_doi":"10.1016/j.jlp.2011.12.007"},{"citation_id":252096,"raw_reference":"Frittelli, J. et al. 2014. U.S. Rail Transportation of Crude Oil: Background and Issues for Congress. Congressional Research Service. 7-5700.","cited_authors":"Frittelli, J.; Andrews, A.; Parfomak, P.W.; Pirog, R.; Ramseur, J.L.; Ratner, M.","cited_year":"2014","cited_title":"U.S. Rail Transportation of Crude Oil: Background and Issues for Congress","cited_venue":"Congressional Research Service","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252097,"raw_reference":"Montana Department of Justice (Montana DOJ). 2013. Yellowstone River Oil Spill (July 2011): Natural Resource Damage Assessment and Restoration.","cited_authors":"Montana Department of Justice","cited_year":"2013","cited_title":"Yellowstone River Oil Spill (July 2011): Natural Resource Damage Assessment and Restoration","cited_venue":"Montana DOJ","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252098,"raw_reference":"Environmental Research Consulting (ERC). 2016. Crude-by-Rail Spill Risk Analysis for Proposed Shell Puget Sound Refinery Anacortes Rail Unloading Facility: Rail Spill Probability and Volume Analysis Draft Report.","cited_authors":"Environmental Research Consulting","cited_year":"2016","cited_title":"Crude-by-Rail Spill Risk Analysis for Proposed Shell Puget Sound Refinery Anacortes Rail Unloading Facility: Rail Spill Probability and Volume Analysis Draft Report","cited_venue":"Environmental Research Consulting","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252099,"raw_reference":"Association of Oil Pipe Lines and American Petroleum Institute. 2014. U.S. Liquids Pipeline Usage & Mileage Report.","cited_authors":"Association of Oil Pipe Lines; American Petroleum Institute","cited_year":"2014","cited_title":"U.S. Liquids Pipeline Usage & Mileage Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252100,"raw_reference":"Bureau of Transportation Statistics, United States Department of Transportation. 2015. Table 1-10: U.S. Oil and Gas Pipeline Mileage.","cited_authors":"Bureau of Transportation Statistics","cited_year":"2015","cited_title":"Table 1-10: U.S. Oil and Gas Pipeline Mileage","cited_venue":"U.S. DOT","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252101,"raw_reference":"Little, A.D. 1999. Risks from Gasoline Pipelines in the UK. Health and Safety Executive, UK.","cited_authors":"Little, A.D.","cited_year":"1999","cited_title":"Risks from Gasoline Pipelines in the UK","cited_venue":"Health and Safety Executive, UK","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252102,"raw_reference":"United States Energy Information Administration (U.S. EIA). 2016a. Total Crude Oil by Rail (Thousand Barrels). Release date 10/31/2016.","cited_authors":"U.S. Energy Information Administration","cited_year":"2016","cited_title":"Total Crude Oil by Rail (Thousand Barrels)","cited_venue":"U.S. EIA","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252103,"raw_reference":"Marathon Pipe Line LLC. 2011. Natural Resource Damages Assessment and Restoration Planning (DARP) Report. Mt. Erie Pipe Line Release Near Albion, Wayne County, Illinois. Prepared by Arcadis.","cited_authors":"Marathon Pipe Line LLC; Arcadis","cited_year":"2011","cited_title":"Natural Resource Damages Assessment and Restoration Planning (DARP) Report. Mt. Erie Pipe Line Release Near Albion, Wayne County, Illinois","cited_venue":"Arcadis","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252104,"raw_reference":"Utah Department of Environmental Quality (UDEQ). 2012a. Screening Level Ecological Risk Assessment – Final: Chevron Pipeline June 2010 Crude Oil Spill, Lower Red Butte Creek, Salt Lake City, Utah.","cited_authors":"Utah Department of Environmental Quality","cited_year":"2012","cited_title":"Screening Level Ecological Risk Assessment – Final: Chevron Pipeline June 2010 Crude Oil Spill, Lower Red Butte Creek, Salt Lake City, Utah","cited_venue":"UDEQ","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252105,"raw_reference":"Texas A&M Transportation Institute 2025 Urban Mobility Report was not cited in the text as a reference entry.","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":null,"page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252299,"raw_reference":"Dynamic Risk Assessment Systems, Inc. 2019. Independent Pipeline Integrity Program Review: Phase 1 Summary. Calgary, AB: Dynamic Risk. Issued July 17.","cited_authors":"Dynamic Risk Assessment Systems, Inc.","cited_year":"2019","cited_title":"Independent Pipeline Integrity Program Review: Phase 1 Summary","cited_venue":"Dynamic Risk","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn/section 2.6 Threat Assessment and Interactions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252300,"raw_reference":"Kiefner and Associates, Inc. 2007. Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines. Final Report to US Department of Transportation, Pipeline and Hazardous Materials Safety Administration (PHMSA) No. 05-12R. Worthington, OH: Kiefner and Associates, Inc.","cited_authors":"Kiefner and Associates, Inc.","cited_year":"2007","cited_title":"Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_venue":"Final Report to PHMSA No. 05-12R, Kiefner and Associates, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"section 2.6 Threat Assessment and Interactions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252301,"raw_reference":"Muñoz, E., and Rosenfeld, M. J. 2016. DTPH56-14-H-00004: Improving Models to Consider Complex Loadings, Operational Considerations, and Interactive Threats. Final Report to PHMSA No. 16-228. Columbus, OH: Kiefner and Associates, Inc.","cited_authors":"Muñoz, E., and Rosenfeld, M. J.","cited_year":"2016","cited_title":"DTPH56-14-H-00004: Improving Models to Consider Complex Loadings, Operational Considerations, and Interactive Threats","cited_venue":"Kiefner and Associates, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"section 2.6 Threat Assessment and Interactions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252302,"raw_reference":"NDT Global. 2019. Linalog® Hard Spot Inspection Report: Re-analysis of Hard Spot Data. Issued September 9. Houston, TX: NDT Global.","cited_authors":"NDT Global","cited_year":"2019","cited_title":"Linalog® Hard Spot Inspection Report: Re-analysis of Hard Spot Data","cited_venue":"NDT Global","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"section 2.5 In-Line Inspection Tool and Data Analyses","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252303,"raw_reference":"Idaho National Laboratory. 2005. The SPAR-H Human Reliability Analysis Method. NUREG/CR-6883. Washington, DC: US Nuclear Regulatory Commission.","cited_authors":"Idaho National Laboratory","cited_year":"2005","cited_title":"The SPAR-H Human Reliability Analysis Method","cited_venue":"NUREG/CR-6883, US Nuclear Regulatory Commission","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252304,"raw_reference":"Cambridge Systematics, 2007. National Rail Freight Infrastructure Capacity and Investment Study","cited_authors":"Cambridge Systematics","cited_year":"2007","cited_title":"National Rail Freight Infrastructure Capacity and Investment Study","cited_venue":"American Association of Railroads","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 2 Overview of Analysis","page":null,"context_sentence":null,"paper_id":59475,"paper_title":"National Rail Freight Infrastructure Capacity and Investment Study","paper_year":2007,"paper_doi":null},{"citation_id":252305,"raw_reference":"Hagemann et al. (2013)","cited_authors":"Hagemann et al.","cited_year":"2013","cited_title":"Costs of truck crashes model","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 5 Roadway Users Cost of Delay","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252306,"raw_reference":"Dick, C. T., Zhao, J., Liu, X., & Kirkpatrick, S. W. (2021). Quantifying Recent Trends in Class 1 Freight Railroad Train Length and Weight by Train Type. Transportation Research Record, 2675(12), 890–903.","cited_authors":"Dick, C. T., Zhao, J., Liu, X., & Kirkpatrick, S. W.","cited_year":"2021","cited_title":"Quantifying Recent Trends in Class 1 Freight Railroad Train Length and Weight by Train Type","cited_venue":"Transportation Research Record","cited_doi":"10.1177/03611981211031534","cited_url":"https://doi.org/10.1177/03611981211031534","ref_kind":"journal_article","section":"Section 3.3.5 Transforming Annual Carloads to TPD","page":null,"context_sentence":null,"paper_id":27470,"paper_title":"Quantifying Recent Trends in Class 1 Freight Railroad Train Length and Weight by Train Type","paper_year":2021,"paper_doi":"10.1177/03611981211031534"},{"citation_id":252307,"raw_reference":"Barrow, N. (2019). Precision Scheduled Railroading—Evolution or revolution? International Railway Journal.","cited_authors":"Barrow, N.","cited_year":"2019","cited_title":"Precision Scheduled Railroading—Evolution or revolution?","cited_venue":"International Railway Journal","cited_doi":null,"cited_url":"https://www.railjournal.com/in_depth/precision-scheduled-railroading-evolution-revolution/","ref_kind":"news","section":"Section 3.3.5 Transforming Annual Carloads to TPD","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252308,"raw_reference":"Association of American Railroads, Bureau of Explosives. (2018). Annual Report of Hazardous Materials Transported by Rail (BOE 17-1; p. 44).","cited_authors":"Association of American Railroads, Bureau of Explosives","cited_year":"2018","cited_title":"Annual Report of Hazardous Materials Transported by Rail","cited_venue":"AAR","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 3.1.1 PHMSA Hazardous Material Incident Reporting","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252309,"raw_reference":"Arizona Department of Transportation, 2010","cited_authors":"Arizona Department of Transportation","cited_year":"2010","cited_title":"Arizona DOT rail volume study","cited_venue":"Arizona Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section 3.4 Capacity Modeling","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252919,"raw_reference":"Barth, M., F.An, T. Younglove, G. Scora, C. Levine, M. Ross and T. Wenzel, Development of a Comprehensive Modal Emissions Model, Final Report, NCHRP Project 25-11, National Cooperative Highway Research Program, Transportation Research Board, Washington DC, 2000.","cited_authors":"Barth, M., F.An, T. Younglove, G. Scora, C. Levine, M. Ross and T. Wenzel","cited_year":"2000","cited_title":"Development of a Comprehensive Modal Emissions Model, Final Report, NCHRP Project 25-11","cited_venue":"National Cooperative Highway Research Program, Transportation Research Board","cited_doi":null,"cited_url":"http://www.cert.ucr.edu/cmem/docs/NCHRP_Final_Report.pdf","ref_kind":"research_report","section":"fn 53","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252920,"raw_reference":"Delucchi, M. and S. Hsu, The External Damage Cost of Noise Emitted from Motor Vehicles, Journal of Transportation and Statistics, Bureau of Transportation Statistics, 1998.","cited_authors":"Delucchi, M. and S. Hsu","cited_year":"1998","cited_title":"The External Damage Cost of Noise Emitted from Motor Vehicles","cited_venue":"Journal of Transportation and Statistics, Bureau of Transportation Statistics","cited_doi":null,"cited_url":"http://ntl.bts.gov/lib/9000/9100/9106/1deluc.pdf","ref_kind":"journal_article","section":"fn 59","page":null,"context_sentence":null,"paper_id":59568,"paper_title":"External Damage Cost of Noise Emitted from Motor Vehicles","paper_year":1998,"paper_doi":"10.21949/1501591"},{"citation_id":252921,"raw_reference":"Wildenthal, M.T. and J.L. Buffington, \"Estimated Construction Period Impact of Widening State Highway 21, in Caldwell, Texas,\" Transportation Research Record No. 1559, Journal of the Transportation Research Board, Washington, D.C, 1996.","cited_authors":"Wildenthal, M.T. and J.L. Buffington","cited_year":"1996","cited_title":"Estimated Construction Period Impact of Widening State Highway 21, in Caldwell, Texas","cited_venue":"Transportation Research Record No. 1559","cited_doi":"10.1177/0361198196155900110","cited_url":null,"ref_kind":"journal_article","section":"fn 60","page":null,"context_sentence":null,"paper_id":50182,"paper_title":"Estimated Construction Period Impact of Widening State Highway 21 in Caldwell, Texas","paper_year":1996,"paper_doi":"10.1177/0361198196155900110"},{"citation_id":252922,"raw_reference":"Wolffing, C., J. Liesman, R. Young and K. Ksaibati, Highway Construction Related Business Impacts: Phase I Report, Report No. FHWA-WY-04/01F, Wyoming Department of Transportation, Cheyenne, WY, March 2004.","cited_authors":"Wolffing, C., J. Liesman, R. Young and K. Ksaibati","cited_year":"2004","cited_title":"Highway Construction Related Business Impacts: Phase I Report","cited_venue":"Wyoming Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 61","page":null,"context_sentence":null,"paper_id":59316,"paper_title":"Highway Construction Related Business Impacts: Phase I Report","paper_year":2004,"paper_doi":null},{"citation_id":252923,"raw_reference":"Hardy, M. and K. Wunderlich, Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation—A Guide for Analysts, Report No. FHWA-HOP-09-001, Office of Operations, Federal Highway Administration, Washington, DC, 2009.","cited_authors":"Hardy, M. and K. Wunderlich","cited_year":"2009","cited_title":"Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation—A Guide for Analysts","cited_venue":"Federal Highway Administration","cited_doi":null,"cited_url":"http://ops.fhwa.dot.gov/wz/traffic_analysis/tatv9_wz/index.htm","ref_kind":"research_report","section":"fn 58","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252924,"raw_reference":"Weng, J. and Q. Meng, A Decision Tree-based Model for Work Zone Capacity Estimation, Paper No. 11-0865, DVD Compendium, Proceedings of 90th Annual Meeting, Transportation Research Board, Washington, DC, 2011.","cited_authors":"Weng, J. and Q. Meng","cited_year":"2011","cited_title":"A Decision Tree-based Model for Work Zone Capacity Estimation","cited_venue":"Proceedings of 90th Annual Meeting, Transportation Research Board","cited_doi":"10.3141/2257-05","cited_url":null,"ref_kind":"conference_paper","section":"fn 65","page":null,"context_sentence":null,"paper_id":27471,"paper_title":"Decision Tree–Based Model for Estimation of Work Zone Capacity","paper_year":2011,"paper_doi":"10.3141/2257-05"},{"citation_id":252925,"raw_reference":"Benekohal, R. F. A. Kaja-Mohideen, M. V. Chitturi, A Methodology for Estimating Operating Speed and Capacity in Work Zones, Transportation Research Record No. 1883, Journal of the Transportation Research Board, Washington, DC, 2004.","cited_authors":"Benekohal, R. F. A. Kaja-Mohideen, M. V. Chitturi","cited_year":"2004","cited_title":"A Methodology for Estimating Operating Speed and Capacity in Work Zones","cited_venue":"Transportation Research Record No. 1883","cited_doi":"10.3141/1883-12","cited_url":null,"ref_kind":"journal_article","section":"fn 66","page":null,"context_sentence":null,"paper_id":27472,"paper_title":"Methodology for Estimating Operating Speed and Capacity in Work Zones","paper_year":2004,"paper_doi":"10.3141/1883-12"},{"citation_id":252926,"raw_reference":"Sarasua, W. A., W. J. Davis, D. B. Clarke, J. Kottapally, P. Mulukutla, Estimating Interstate Highway Capacity for Short-Term Work Zone Lane Closures: Development of Methodology, Transportation Research Record No. 1877, Journal of the Transportation Research Board, Washington, D.C., 2004.","cited_authors":"Sarasua, W. A., W. J. Davis, D. B. Clarke, J. Kottapally, P. Mulukutla","cited_year":"2004","cited_title":"Estimating Interstate Highway Capacity for Short-Term Work Zone Lane Closures: Development of Methodology","cited_venue":"Transportation Research Record No. 1877","cited_doi":"10.1177/0361198106194800106","cited_url":null,"ref_kind":"journal_article","section":"fn 67","page":null,"context_sentence":null,"paper_id":27474,"paper_title":"Estimating Interstate Highway Capacity for Short-Term Work Zone Lane Closures: Development of Methodology","paper_year":2006,"paper_doi":"10.1177/0361198106194800106"},{"citation_id":252927,"raw_reference":"Al-Kaisy, A. and F. Hall, Guidelines for Estimating Freeway Capacity at Long-Term Reconstruction Zones, CDROM Compendium, Proceedings of 81th Annual Meeting, Transportation Research Board, Washington, DC, 2002.","cited_authors":"Al-Kaisy, A. and F. Hall","cited_year":"2002","cited_title":"Guidelines for Estimating Freeway Capacity at Long-Term Reconstruction Zones","cited_venue":"Proceedings of 81th Annual Meeting, Transportation Research Board","cited_doi":"10.1061/(asce)0733-947x(2003)129:5(572)","cited_url":null,"ref_kind":"conference_paper","section":"fn 68","page":null,"context_sentence":null,"paper_id":50183,"paper_title":"Guidelines for Estimating Capacity at Freeway Reconstruction Zones","paper_year":2003,"paper_doi":"10.1061/(asce)0733-947x(2003)129:5(572)"},{"citation_id":252928,"raw_reference":"Kim, T., D. J. Lovell, and J. Paracha, A New Methodology to Estimate Capacity for Freeway Work Zones, Paper No. 01-0566, CDROM Compendium, Proceedings of 80th Annual Meeting, Transportation Research Board, Washington, DC, 2001.","cited_authors":"Kim, T., D. J. Lovell, and J. Paracha","cited_year":"2001","cited_title":"A New Methodology to Estimate Capacity for Freeway Work Zones","cited_venue":"Proceedings of 80th Annual Meeting, Transportation Research Board","cited_doi":null,"cited_url":null,"ref_kind":"conference_paper","section":"fn 69","page":null,"context_sentence":null,"paper_id":59389,"paper_title":"A New Methodology to Estimate Capacity for Freeway Work Zones","paper_year":2001,"paper_doi":null},{"citation_id":252929,"raw_reference":"Jiang, Y. Traffic capacity, Speed and Queue-discharge rate for Indiana's Four-lane Freeway Work Zones. Transportation Research Record No. 1657, Journal of the Transportation Research Board, Washington, D.C.,1999","cited_authors":"Jiang, Y.","cited_year":"1999","cited_title":"Traffic capacity, Speed and Queue-discharge rate for Indiana's Four-lane Freeway Work Zones","cited_venue":"Transportation Research Record No. 1657","cited_doi":"10.3141/1657-02","cited_url":null,"ref_kind":"journal_article","section":"fn 70","page":null,"context_sentence":null,"paper_id":27473,"paper_title":"Traffic Capacity, Speed, and Queue-Discharge Rate of Indiana’s Four-Lane Freeway Work Zones","paper_year":1999,"paper_doi":"10.3141/1657-02"},{"citation_id":252930,"raw_reference":"Dixon, K. K., Hummer, J. E. and Lorscheider, A. R. Capacity for North Carolina Freeway Work Zones. Transportation Research Record No. 1529, Journal of the Transportation Research Board, Washington, D.C., 1996.","cited_authors":"Dixon, K. K., Hummer, J. E. and Lorscheider, A. R.","cited_year":"1996","cited_title":"Capacity for North Carolina Freeway Work Zones","cited_venue":"Transportation Research Record No. 1529","cited_doi":"10.1177/0361198196152900104","cited_url":null,"ref_kind":"journal_article","section":"fn 71","page":null,"context_sentence":null,"paper_id":50184,"paper_title":"Capacity for North Carolina Freeway Work Zones","paper_year":1996,"paper_doi":"10.1177/0361198196152900104"},{"citation_id":252931,"raw_reference":"Krammes, R. A. and G. O. Lopez, Updated Short-Term Freeway Work Zone Lane Closure Capacity Values, Report No. FHWA/TX-92/1108-5, Texas Department of Transportation, Austin, TX, 1992.","cited_authors":"Krammes, R. A. and G. O. Lopez","cited_year":"1992","cited_title":"Updated Short-Term Freeway Work Zone Lane Closure Capacity Values","cited_venue":"Texas Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 72","page":null,"context_sentence":null,"paper_id":59315,"paper_title":"Updated short-term freeway work zone lane closure capacity values","paper_year":1992,"paper_doi":null},{"citation_id":252932,"raw_reference":"Dudek, C. L. and S. H. Richards. Traffic Capacity through Work Zones on Urban Freeways. Report FHWA/TX-81/228-6, Texas Department of Transportation, Austin, TX, 1981.","cited_authors":"Dudek, C. L. and S. H. Richards","cited_year":"1981","cited_title":"Traffic Capacity through Work Zones on Urban Freeways","cited_venue":"Texas Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 73","page":null,"context_sentence":null,"paper_id":59570,"paper_title":"TRAFFIC CAPACITY THROUGH WORK ZONES ON URBAN FREEWAYS","paper_year":1981,"paper_doi":null},{"citation_id":252933,"raw_reference":"Eisele, B., Schrank, D. and T. Lomax, 2011 Congested Corridors Report - Appendix B, Texas Transportation Institute, College Station, TX, 2011.","cited_authors":"Eisele, B., Schrank, D. and T. Lomax","cited_year":"2011","cited_title":"2011 Congested Corridors Report - Appendix B","cited_venue":"Texas Transportation Institute","cited_doi":null,"cited_url":"http://mobility.tamu.edu/corridors/methodology/","ref_kind":"research_report","section":"fn 74","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252934,"raw_reference":"Jeannotte, K., and A. Chandra, Developing and Implementing Transportation Management Plans for Work Zones, Report No. FHWA-HOP-05-066, Office of Transportation Operations, Federal Highway Administration, Washington, DC, 2005.","cited_authors":"Jeannotte, K., and A. Chandra","cited_year":"2005","cited_title":"Developing and Implementing Transportation Management Plans for Work Zones","cited_venue":"Federal Highway Administration","cited_doi":null,"cited_url":"http://www.ops.fhwa.dot.gov/wz/resources/publications/trans_mgmt_plans/trans_mgmt_plans.pdf","ref_kind":"research_report","section":"fn 77","page":null,"context_sentence":null,"paper_id":59596,"paper_title":"Developing and implementing transportation management plans for work zones: rule on work zone safety and mobility 23 CFR 630 Subpart J","paper_year":2005,"paper_doi":null},{"citation_id":252935,"raw_reference":"Hardy, M., and K. Wunderlich, Traffic Analysis Tools Volume VIII: Work Zone Analysis - A Guide for Decision-Makers, Report No. FHWA-HOP-08-029, Office of Operations, Federal Highway Administration, Washington, DC, 2008.","cited_authors":"Hardy, M., and K. Wunderlich","cited_year":"2008","cited_title":"Traffic Analysis Tools Volume VIII: Work Zone Analysis - A Guide for Decision-Makers","cited_venue":"Federal Highway Administration","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 78","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252936,"raw_reference":"Edara, P., Estimation of Traffic Impacts at Work Zones: State of the Practice, Report No. VTRC 06R25, Virginia Department of Transportation, Richmond, VA, 2006.","cited_authors":"Edara, P.","cited_year":"2006","cited_title":"Estimation of Traffic Impacts at Work Zones: State of the Practice","cited_venue":"Virginia Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 81","page":null,"context_sentence":null,"paper_id":59450,"paper_title":"Estimation of traffic impacts at work zones : state of the practice.","paper_year":2006,"paper_doi":null},{"citation_id":252937,"raw_reference":"Lee, E. B., and C. W. Ibbs, Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies, ASCE Journal of Construction Engineering and Management, Vol. 131, No. 4, 2005.","cited_authors":"Lee, E. B., and C. W. Ibbs","cited_year":"2005","cited_title":"Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies","cited_venue":"ASCE Journal of Construction Engineering and Management","cited_doi":"10.1061/(asce)0733-9364(2005)131:4(449)","cited_url":null,"ref_kind":"journal_article","section":"fn 82","page":null,"context_sentence":null,"paper_id":27477,"paper_title":"Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies","paper_year":2005,"paper_doi":"10.1061/(asce)0733-9364(2005)131:4(449)"},{"citation_id":252938,"raw_reference":"Fick, G., E. T. Cackler, S. Trost, and L. Vanzler, Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts, Final Report, NCHRP Report No. 652, Transportation Research Board, 2010.","cited_authors":"Fick, G., E. T. Cackler, S. Trost, and L. Vanzler","cited_year":"2010","cited_title":"Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts","cited_venue":"NCHRP Report No. 652, National Cooperative Highway Research Program, Transportation Research Board","cited_doi":"10.17226/14392","cited_url":null,"ref_kind":"research_report","section":"fn 99","page":null,"context_sentence":null,"paper_id":50177,"paper_title":"Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts","paper_year":2010,"paper_doi":"10.17226/14392"},{"citation_id":252939,"raw_reference":"Ellis, R., J. Pyeon, Z. Herbsman, E. Minchin, and K. Molenaar, Evaluation of Alternative Contracting Techniques on Florida DOT Construction Projects, Final Report, Contract No. FDOT BDC51, Florida Department of Transportation, Gainesville, 2007.","cited_authors":"Ellis, R., J. Pyeon, Z. Herbsman, E. Minchin, and K. Molenaar","cited_year":"2007","cited_title":"Evaluation of Alternative Contracting Techniques on Florida DOT Construction Projects","cited_venue":"Florida Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 100","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252940,"raw_reference":"Anderson, S.D., and I. Damnjanovic, Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion, NCHRP Synthesis 379, Transportation Research Board, 2008.","cited_authors":"Anderson, S.D., and I. Damnjanovic","cited_year":"2008","cited_title":"Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion","cited_venue":"NCHRP Synthesis 379, National Cooperative Highway Research Program, Transportation Research Board","cited_doi":"10.17226/23075","cited_url":null,"ref_kind":"research_report","section":"fn 101","page":null,"context_sentence":null,"paper_id":27476,"paper_title":"Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion","paper_year":2008,"paper_doi":"10.17226/23075"},{"citation_id":252941,"raw_reference":"Thomas, H. R., R. D. Ellis, and S. K. Sinha, Improving the Time Performance of Highway Construction Contracts, Final Report, NCHRP Project No. 20-24(12)A, Transportation Research Board, 2006.","cited_authors":"Thomas, H. R., R. D. Ellis, and S. K. Sinha","cited_year":"2006","cited_title":"Improving the Time Performance of Highway Construction Contracts","cited_venue":"NCHRP Project No. 20-24(12)A, National Cooperative Highway Research Program, Transportation Research Board","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 102","page":null,"context_sentence":null,"paper_id":59400,"paper_title":"IMPROVING THE TIME PERFORMANCE OF HIGHWAY CONSTRUCTION CONTRACTS","paper_year":2006,"paper_doi":null},{"citation_id":252942,"raw_reference":"Crossett, J., and Hines, Comparing State Dots' Construction Project Cost & Schedule Performance – 28 Best Practices from 9 States, Final Report, NCHRP Project 20-24, Task 37A, Transportation Research Board, 2007.","cited_authors":"Crossett, J., and Hines","cited_year":"2007","cited_title":"Comparing State Dots' Construction Project Cost & Schedule Performance – 28 Best Practices from 9 States","cited_venue":"NCHRP Project 20-24, Task 37A, National Cooperative Highway Research Program, Transportation Research Board","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 103","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252943,"raw_reference":"McFarland, W. F., R.J. Kabat, and R. A. Krammes, Comparison of Contracting Strategies for Reducing Project Completion Time, Report No. FHWA/TX-94/1310-F, Texas Department of Transportation, Austin, TX, 1994.","cited_authors":"McFarland, W. F., R.J. Kabat, and R. A. Krammes","cited_year":"1994","cited_title":"Comparison of Contracting Strategies for Reducing Project Completion Time","cited_venue":"Texas Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 118","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":252944,"raw_reference":"Shr, J. F., B. P. Thompson, J. S. Russell, B. Ran, and H. P. Tserng, Determining Minimum Contract Time for Highway Projects, Transportation Research Record No. 1742, Transportation Research Board, 2000.","cited_authors":"Shr, J. F., B. P. Thompson, J. S. Russell, B. Ran, and H. P. Tserng","cited_year":"2000","cited_title":"Determining Minimum Contract Time for Highway Projects","cited_venue":"Transportation Research Record No. 1742","cited_doi":"10.3141/1712-23","cited_url":null,"ref_kind":"journal_article","section":"fn 119","page":null,"context_sentence":null,"paper_id":50185,"paper_title":"Determining Minimum Contract Time for Highway Projects","paper_year":2000,"paper_doi":"10.3141/1712-23"},{"citation_id":252945,"raw_reference":"Herbsman, Z. J., W. T. Chen, and W. C. Epstein, Time is Money: Innovative Contracting Methods in Highway Construction, Journal of Construction Engineering and Management, Vol. 121, No. 3, 1995.","cited_authors":"Herbsman, Z. J., W. T. Chen, and W. C. Epstein","cited_year":"1995","cited_title":"Time is Money: Innovative Contracting Methods in Highway Construction","cited_venue":"Journal of Construction Engineering and Management","cited_doi":"10.1061/(asce)0733-9364(1995)121:3(273)","cited_url":null,"ref_kind":"journal_article","section":"fn 120","page":null,"context_sentence":null,"paper_id":50186,"paper_title":"Time Is Money: Innovative Contracting Methods in Highway Construction","paper_year":1995,"paper_doi":"10.1061/(asce)0733-9364(1995)121:3(273)"},{"citation_id":252946,"raw_reference":"Jaraiedi, M., R. W. Plummer, and M. S. Aber, Incentive/Disincentive Guidelines for Highway Construction Contracts, Journal of Construction Engineering and Management, Vol. 121, No. 1, 1995.","cited_authors":"Jaraiedi, M., R. W. Plummer, and M. S. Aber","cited_year":"1995","cited_title":"Incentive/Disincentive Guidelines for Highway Construction Contracts","cited_venue":"Journal of Construction Engineering and Management","cited_doi":"10.1061/(asce)0733-9364(1995)121:1(112)","cited_url":null,"ref_kind":"journal_article","section":"fn 121","page":null,"context_sentence":null,"paper_id":50187,"paper_title":"Incentive/Disincentive Guidelines for Highway Construction Contracts","paper_year":1995,"paper_doi":"10.1061/(asce)0733-9364(1995)121:1(112)"},{"citation_id":252947,"raw_reference":"Sillars, D. N., and J. Riedl, Framework Model for Determining Incentive and Disincentive Amounts, Transportation Research Record No. 2040, 2007.","cited_authors":"Sillars, D. N., and J. Riedl","cited_year":"2007","cited_title":"Framework Model for Determining Incentive and Disincentive Amounts","cited_venue":"Transportation Research Record No. 2040","cited_doi":"10.3141/2040-02","cited_url":null,"ref_kind":"journal_article","section":"fn 122","page":null,"context_sentence":null,"paper_id":27475,"paper_title":"Framework Model for Determining Incentive and Disincentive Amounts","paper_year":2007,"paper_doi":"10.3141/2040-02"},{"citation_id":252948,"raw_reference":"NJDOT, Road User Cost Manual, New Jersey Department of Transportation, Trenton, NJ, 2001.","cited_authors":"NJDOT","cited_year":"2001","cited_title":"Road User Cost Manual","cited_venue":"New Jersey Department of Transportation","cited_doi":null,"cited_url":"http://www.state.nj.us/transportation/eng/documents/RUCM/pdf/RUCManual.pdf","ref_kind":"research_report","section":"fn 124","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253707,"raw_reference":"J.F. Kiefner and W.A. Maxey, \"The Benefits and Limitations of Hydrostatic Testing,\" in E.W. McAllister, ed., Pipeline Rules of Thumb Handbook, 6th ed. (Boston: Elsevier, 2005), pp. 139–162.","cited_authors":"J.F. Kiefner; W.A. Maxey","cited_year":"2005","cited_title":"The Benefits and Limitations of Hydrostatic Testing","cited_venue":"Pipeline Rules of Thumb Handbook, 6th ed. (Elsevier)","cited_doi":null,"cited_url":null,"ref_kind":"book_chapter","section":"fn 123","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253708,"raw_reference":"Effects of Pressure Cycles on Gas Pipelines, report GRI-04/0178 (Des Plaines, Illinois: Gas Research Institute, 2004).","cited_authors":"Gas Research Institute","cited_year":"2004","cited_title":"Effects of Pressure Cycles on Gas Pipelines","cited_venue":"Gas Research Institute","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 149","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253709,"raw_reference":"Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines, No. 05-12R (Washington, DC: Pipeline and Hazardous Materials Safety Administration, 2007).","cited_authors":"Pipeline and Hazardous Materials Safety Administration","cited_year":"2007","cited_title":"Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_venue":"Pipeline and Hazardous Materials Safety Administration","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 150","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253710,"raw_reference":"Texas Eastern Gas Pipeline Company Ruptures and Fires at Beaumont, Kentucky, on April 27, 1985, and Lancaster, Kentucky, on February 21, 1986, Pipeline Accident Report NTSB/PAR-87/01 (Washington DC: National Transportation Safety Board, 1987).","cited_authors":"National Transportation Safety Board","cited_year":"1987","cited_title":"Texas Eastern Gas Pipeline Company Ruptures and Fires at Beaumont, Kentucky, on April 27, 1985, and Lancaster, Kentucky, on February 21, 1986","cited_venue":"National Transportation Safety Board","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 115","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253711,"raw_reference":"Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown, Pipeline Safety Study NTSB/PSS-71/01 (Washington, DC: National Transportation Safety Board, 1970).","cited_authors":"National Transportation Safety Board","cited_year":"1970","cited_title":"Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown","cited_venue":"National Transportation Safety Board","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 117","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253712,"raw_reference":"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey, March 23, 1994, Pipeline Accident Report NTSB/PAR-95/01 (Washington, DC: National Transportation Safety Board, 1995.)","cited_authors":"National Transportation Safety Board","cited_year":"1995","cited_title":"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey","cited_venue":"National Transportation Safety Board","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 119","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253713,"raw_reference":"Unites States Steel, The Making, Shaping and Treating of Steel, 7th ed. (Pittsburgh, Pennsylvania: United States Steel Corporation, 1957).","cited_authors":"United States Steel Corporation","cited_year":"1957","cited_title":"The Making, Shaping and Treating of Steel","cited_venue":"United States Steel Corporation","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 134","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253714,"raw_reference":"Simicevic and Sterling, 2001.","cited_authors":"Simicevic; Sterling","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"fn 137","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253715,"raw_reference":"Atalah, 2004.","cited_authors":"Atalah","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"fn 137","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253716,"raw_reference":"Reason, J. Managing the Risks of Organizational Accidents (Burlington, Vermont: Ashgate Publishing Company, 1997).","cited_authors":"J. Reason","cited_year":"1997","cited_title":"Managing the Risks of Organizational Accidents","cited_venue":"Ashgate Publishing Company","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 154","page":null,"context_sentence":null,"paper_id":59293,"paper_title":"Managing the Risks of Organizational Accidents","paper_year":2016,"paper_doi":"10.4324/9781315543543"},{"citation_id":253717,"raw_reference":"Reason, J. \"Achieving a Safe Culture: Theory and Practice,\" Work and Stress, vol. 12 (1998), p. 227.","cited_authors":"J. Reason","cited_year":"1998","cited_title":"Achieving a Safe Culture: Theory and Practice","cited_venue":"Work and Stress, vol. 12","cited_doi":"10.1080/02678379808256868","cited_url":null,"ref_kind":"journal_article","section":"fn 154","page":null,"context_sentence":null,"paper_id":27482,"paper_title":"Achieving a safe culture: Theory and practice","paper_year":1998,"paper_doi":"10.1080/02678379808256868"},{"citation_id":253718,"raw_reference":"Refinery Explosion and Fire, Investigation Report, report No. 205-04-1-TX (Washington, DC: U.S. Chemical Safety and Hazard Investigation Board, 2007).","cited_authors":"U.S. Chemical Safety and Hazard Investigation Board","cited_year":"2007","cited_title":"Refinery Explosion and Fire, Investigation Report","cited_venue":"U.S. Chemical Safety and Hazard Investigation Board","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 156","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253877,"raw_reference":"Schafer & Barkan, 2008, A Prediction Model for Broken Rails and an Analysis of their Economic Impact","cited_authors":"Schafer, D. H., & Barkan, C. P. L.","cited_year":"2008","cited_title":"A Prediction Model for Broken Rails and an Analysis of their Economic Impact","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Modeling of Delay Resulting from Rail Line Closures","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253878,"raw_reference":"Schlake, B. W., Barkan, C. P. L., & Edwards, J. R. (2011). Train Delay and Economic Impact of In-Service Failures of Railroad Rolling Stock. Transportation Research Record: Journal of the Transportation Research Board, 2261(1), 124–133.","cited_authors":"Schlake, B. W., Barkan, C. P. L., & Edwards, J. R.","cited_year":"2011","cited_title":"Train Delay and Economic Impact of In-Service Failures of Railroad Rolling Stock","cited_venue":"Transportation Research Record: Journal of the Transportation Research Board, 2261(1), 124–133","cited_doi":"10.3141/2261-14","cited_url":null,"ref_kind":"journal_article","section":"Modeling of Delay Resulting from Rail Line Closures","page":null,"context_sentence":null,"paper_id":27478,"paper_title":"Train Delay and Economic Impact of In-Service Failures of Railroad Rolling Stock","paper_year":2011,"paper_doi":"10.3141/2261-14"},{"citation_id":253879,"raw_reference":"Lovett, A. H., Dick, C. T., & Barkan, C. P. L. (2017). Predicting the Cost and Operational Impacts of Slow Orders on Rail Lines in North America.","cited_authors":"Lovett, A. H., Dick, C. T., & Barkan, C. P. L.","cited_year":"2017","cited_title":"Predicting the Cost and Operational Impacts of Slow Orders on Rail Lines in North America","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Modeling of Delay Resulting from Rail Line Closures","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253880,"raw_reference":"Krueger, 1999, Parametric modeling in rail capacity planning. WSC'99. 1999 Winter Simulation Conference Proceedings","cited_authors":"Krueger, H.","cited_year":"1999","cited_title":"Parametric modeling in rail capacity planning","cited_venue":"WSC'99. 1999 Winter Simulation Conference Proceedings","cited_doi":"10.1109/wsc.1999.816840","cited_url":null,"ref_kind":"conference_paper","section":"Modeling Congestion-Related Delay","page":null,"context_sentence":null,"paper_id":27453,"paper_title":"Parametric modeling in rail capacity planning","paper_year":2003,"paper_doi":"10.1109/wsc.1999.816840"},{"citation_id":253881,"raw_reference":"Lai & Barkan, 2009, Enhanced Parametric Railway Capacity Evaluation Tool. Transportation Research Record, 2117, 33–40","cited_authors":"Lai, Y.-C., & Barkan, C.","cited_year":"2009","cited_title":"Enhanced Parametric Railway Capacity Evaluation Tool","cited_venue":"Transportation Research Record, 2117, 33–40","cited_doi":"10.3141/2117-05","cited_url":null,"ref_kind":"journal_article","section":"Modeling Congestion-Related Delay","page":null,"context_sentence":null,"paper_id":27460,"paper_title":"Enhanced Parametric Railway Capacity Evaluation Tool","paper_year":2009,"paper_doi":"10.3141/2117-05"},{"citation_id":253882,"raw_reference":"Dingler (2010), The Impact of Operational Strategies and New Technologies on Railroad Capacity [Thesis, University of Illinois at Urbana-Champaign]","cited_authors":"Dingler, M. H.","cited_year":"2010","cited_title":"The Impact of Operational Strategies and New Technologies on Railroad Capacity","cited_venue":"University of Illinois at Urbana-Champaign","cited_doi":null,"cited_url":"https://www.ideals.illinois.edu/bitstream/handle/2142/18362/Dingler_Mark.pdf?sequence=1&isAllowed=y","ref_kind":"other","section":"Simulation Congestion Modeling","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253883,"raw_reference":"Sogin et al., 2012, Measuring the Impact of Additional Rail Traffic Using Highway and Railroad Metrics. 2012 Joint Rail Conference, 475–484","cited_authors":"Sogin, S. L., Barkan, C. P., Lai, Y.-C., & Saat, M. R.","cited_year":"2012","cited_title":"Measuring the Impact of Additional Rail Traffic Using Highway and Railroad Metrics","cited_venue":"2012 Joint Rail Conference","cited_doi":"10.1115/jrc2012-74133","cited_url":null,"ref_kind":"conference_paper","section":"Simulation Congestion Modeling","page":null,"context_sentence":null,"paper_id":27481,"paper_title":"Measuring the Impact of Additional Rail Traffic Using Highway and Railroad Metrics","paper_year":2012,"paper_doi":"10.1115/jrc2012-74133"},{"citation_id":253884,"raw_reference":"Sogin, S. L., Lai, Y.-C. (Rex), Dick, C. T., & Barkan, C. P. L. (2013). Comparison of Capacity of Single- and Double-Track Rail Lines. Transportation Research Record, 2374(1), 111–118.","cited_authors":"Sogin, S. L., Lai, Y.-C. (Rex), Dick, C. T., & Barkan, C. P. L.","cited_year":"2013","cited_title":"Comparison of Capacity of Single- and Double-Track Rail Lines","cited_venue":"Transportation Research Record, 2374(1), 111–118","cited_doi":"10.3141/2374-13","cited_url":null,"ref_kind":"journal_article","section":"Simulation Congestion Modeling","page":null,"context_sentence":null,"paper_id":27479,"paper_title":"Comparison of Capacity of Single- and Double-Track Rail Lines","paper_year":2013,"paper_doi":"10.3141/2374-13"},{"citation_id":253885,"raw_reference":"Sogin, S. L., Lai, Y.-C. (Rex), Dick, C. T., & Barkan, C. P. L. (2016). Analyzing the Transition from Single- to Double-Track Railway Lines with Nonlinear Regression Analysis.","cited_authors":"Sogin, S. L., Lai, Y.-C. (Rex), Dick, C. T., & Barkan, C. P. L.","cited_year":"2016","cited_title":"Analyzing the Transition from Single- to Double-Track Railway Lines with Nonlinear Regression Analysis","cited_venue":"Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit 230, no. 8, 1877–89","cited_doi":"10.1177/0954409715616998","cited_url":null,"ref_kind":"journal_article","section":"Simulation Congestion Modeling","page":null,"context_sentence":null,"paper_id":27480,"paper_title":"Analyzing the transition from single- to double-track railway lines with nonlinear regression analysis","paper_year":2015,"paper_doi":"10.1177/0954409715616998"},{"citation_id":253886,"raw_reference":"Prokopy, J. C., & Rubin, R. B. (1975). Parametric Analyis of Railway Line Capacity.","cited_authors":"Prokopy, J. C., & Rubin, R. B.","cited_year":"1975","cited_title":"Parametric Analyis of Railway Line Capacity","cited_venue":null,"cited_doi":null,"cited_url":"https://trid.trb.org/view/1466589","ref_kind":"research_report","section":"Parametric Models of Delay","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253887,"raw_reference":"Peat Marwick. (1976). Train dispatching simulation model: Capabilities and description.","cited_authors":"Peat Marwick","cited_year":"1976","cited_title":"Train dispatching simulation model: Capabilities and description","cited_venue":"Peat Marwick","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Parametric Models of Delay","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253888,"raw_reference":"Mitra et al., 2010, Estimation of Railroad Capacity Using Parametric Methods. Journal of the Transportation Research Forum, 49(2)","cited_authors":"Mitra, S., Tolliver, D., Mitra, S., Bachkar, K., & Kayabas, P.","cited_year":"2010","cited_title":"Estimation of Railroad Capacity Using Parametric Methods","cited_venue":"Journal of the Transportation Research Forum, 49(2)","cited_doi":"10.5399/osu/jtrf.49.2.4503","cited_url":null,"ref_kind":"journal_article","section":"Parametric Models of Delay","page":null,"context_sentence":null,"paper_id":27483,"paper_title":"Estimation of Railroad Capacity Using Parametric Methods","paper_year":2010,"paper_doi":"10.5399/osu/jtrf.49.2.4503"},{"citation_id":253889,"raw_reference":"Gorman, M. F. (2009). Statistical estimation of railroad congestion delay. Transportation Research Part E: Logistics and Transportation Review, 45(3), 446–456.","cited_authors":"Gorman, M. F.","cited_year":"2009","cited_title":"Statistical estimation of railroad congestion delay","cited_venue":"Transportation Research Part E: Logistics and Transportation Review, 45(3), 446–456","cited_doi":"10.1016/j.tre.2008.08.004","cited_url":null,"ref_kind":"journal_article","section":"Other Modeling Efforts","page":null,"context_sentence":null,"paper_id":27484,"paper_title":"Statistical estimation of railroad congestion delay","paper_year":2008,"paper_doi":"10.1016/j.tre.2008.08.004"},{"citation_id":253890,"raw_reference":"Brod, D., Transportation Research Board, & National Cooperative Highway Research Program. (2013). Comprehensive costs of highway-rail grade crossing crashes.","cited_authors":"Brod, D.","cited_year":"2013","cited_title":"Comprehensive costs of highway-rail grade crossing crashes","cited_venue":"National Cooperative Highway Research Program (NCHRP Report 755)","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Other Modeling Efforts","page":null,"context_sentence":null,"paper_id":59569,"paper_title":"Comprehensive Costs of Highway-Rail Grade Crossing Crashes","paper_year":2013,"paper_doi":null},{"citation_id":253891,"raw_reference":"Hagemann, G., Hymel, K., Klauber, A., Lee, D. B., Noel, G., Pace, D., & Taylor, C. (2013). Delay and Environmental Costs of Truck Crashes.","cited_authors":"Hagemann, G., Hymel, K., Klauber, A., Lee, D. B., Noel, G., Pace, D., & Taylor, C.","cited_year":"2013","cited_title":"Delay and Environmental Costs of Truck Crashes","cited_venue":null,"cited_doi":null,"cited_url":"https://trid.trb.org/view/1261153","ref_kind":"research_report","section":"Other Modeling Efforts","page":null,"context_sentence":null,"paper_id":59581,"paper_title":"Delay and Environmental Costs of Truck Crashes","paper_year":2013,"paper_doi":null},{"citation_id":253892,"raw_reference":"Guerrero, S. E., Hirschman, I., Bryan, J. G., Noland, R. B., Hsieh, S., Schrank, D., & Guo, S. (2019). Estimating the Value of Truck Travel Time Reliability. NCHRP No. Project 07-24.","cited_authors":"Guerrero, S. E., Hirschman, I., Bryan, J. G., Noland, R. B., Hsieh, S., Schrank, D., & Guo, S.","cited_year":"2019","cited_title":"Estimating the Value of Truck Travel Time Reliability","cited_venue":"NCHRP Research Report 925","cited_doi":"10.17226/25655","cited_url":null,"ref_kind":"research_report","section":"Value of Travel Time Reliability","page":null,"context_sentence":null,"paper_id":50188,"paper_title":"Estimating the Value of Truck Travel Time Reliability","paper_year":2019,"paper_doi":"10.17226/25655"},{"citation_id":253893,"raw_reference":"Peterson, E. B., Neels, K., Barczi, N., & Graham, T. (2013, January). The Economic Cost of Airline Flight Delay.","cited_authors":"Peterson, E. B., Neels, K., Barczi, N., & Graham, T.","cited_year":"2013","cited_title":"The Economic Cost of Airline Flight Delay","cited_venue":"Journal of Transport Economics and Policy","cited_doi":"10.3828/jtep.2013.47.1.107","cited_url":"https://www.ingentaconnect.com/content/lse/jtep/2013/00000047/00000001/art00007","ref_kind":"journal_article","section":"Value of Travel Time Reliability","page":null,"context_sentence":null,"paper_id":27485,"paper_title":"The Economic Cost of Airline Flight Delay","paper_year":2013,"paper_doi":"10.3828/jtep.2013.47.1.107"},{"citation_id":253894,"raw_reference":"Work Zone Road User Costs – Concepts and Applications, FHWA-HOP-12-005, December 2011","cited_authors":"Mallela, J., & Sadasivam, S.","cited_year":"2011","cited_title":"Work Zone Road User Costs – Concepts and Applications","cited_venue":"Federal Highway Administration / Applied Research Associates, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Work Zone Road User Costs (FHWA-HOP-12-005)","page":null,"context_sentence":null,"paper_id":59478,"paper_title":"Work Zone Road User Costs: Concepts and Applications","paper_year":2011,"paper_doi":null},{"citation_id":253895,"raw_reference":"Ullman, G. L., M.D. Finley, J. E. Bryden, R. Srinivasan, and F. M. Council, Traffic Safety Evaluation of Nighttime and Daytime Work Zones, NCHRP Report 627, 2008","cited_authors":"Ullman, G. L., Finley, M. D., Bryden, J. E., Srinivasan, R., & Council, F. M.","cited_year":"2008","cited_title":"Traffic Safety Evaluation of Nighttime and Daytime Work Zones","cited_venue":"NCHRP Report 627, Transportation Research Board","cited_doi":"10.17226/14196","cited_url":null,"ref_kind":"research_report","section":"Work Zone Road User Costs (FHWA-HOP-12-005)","page":null,"context_sentence":null,"paper_id":27458,"paper_title":"Traffic Safety Evaluation of Nighttime and Daytime Work Zones","paper_year":2008,"paper_doi":"10.17226/14196"},{"citation_id":253896,"raw_reference":"Council, F., E. Zaloshnja, T. Miller and B. Persaud, Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries, Report No. FHWA-HRT-05-051, 2005","cited_authors":"Council, F., Zaloshnja, E., Miller, T., & Persaud, B.","cited_year":"2005","cited_title":"Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries","cited_venue":"Federal Highway Administration, FHWA-HRT-05-051","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Work Zone Road User Costs (FHWA-HOP-12-005)","page":null,"context_sentence":null,"paper_id":59556,"paper_title":"Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries","paper_year":2005,"paper_doi":null},{"citation_id":253897,"raw_reference":"Lewis, D. L. Road User and Mitigation Costs in Highway Pavement Projects, NCHRP Synthesis 269, 1996","cited_authors":"Lewis, D. L.","cited_year":"1996","cited_title":"Road User and Mitigation Costs in Highway Pavement Projects","cited_venue":"NCHRP Synthesis 269, Transportation Research Board","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Work Zone Road User Costs (FHWA-HOP-12-005)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":253898,"raw_reference":"Barnes, G and P. Langworthy, The Per-Mile Costs of Operating Automobiles And Trucks, Report No. MN/RC 2003-19, 2004","cited_authors":"Barnes, G., & Langworthy, P.","cited_year":"2004","cited_title":"The Per-Mile Costs of Operating Automobiles And Trucks","cited_venue":"Minnesota Department of Transportation, Report No. MN/RC 2003-19","cited_doi":"10.3141/1864-10","cited_url":"http://www.lrrb.org/pdf/200319.pdf","ref_kind":"research_report","section":"Work Zone Road User Costs (FHWA-HOP-12-005)","page":null,"context_sentence":null,"paper_id":50189,"paper_title":"Per Mile Costs of Operating Automobiles and Trucks","paper_year":2004,"paper_doi":"10.3141/1864-10"},{"citation_id":529772,"raw_reference":"J. Reason, Managing the Risks of Organizational Accidents (Burlington, Vermont: Ashgate Publishing Company, 1997).","cited_authors":"J. Reason","cited_year":"1997","cited_title":"Managing the Risks of Organizational Accidents","cited_venue":"Ashgate Publishing Company","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"2.8 Summary of PG&E Practices, fn 154","page":null,"context_sentence":null,"paper_id":59293,"paper_title":"Managing the Risks of Organizational Accidents","paper_year":2016,"paper_doi":"10.4324/9781315543543"},{"citation_id":529773,"raw_reference":"J. Reason, \"Achieving a Safe Culture: Theory and Practice,\" Work and Stress, vol. 12 (1998), p. 227.","cited_authors":"J. Reason","cited_year":"1998","cited_title":"Achieving a Safe Culture: Theory and Practice","cited_venue":"Work and Stress, vol. 12","cited_doi":"10.1080/02678379808256868","cited_url":null,"ref_kind":"journal_article","section":"2.8 Summary of PG&E Practices, fn 154","page":null,"context_sentence":null,"paper_id":27482,"paper_title":"Achieving a safe culture: Theory and practice","paper_year":1998,"paper_doi":"10.1080/02678379808256868"},{"citation_id":531399,"raw_reference":"National Transportation Safety Board. (2017b). Train Derailment and Subsequent Train Collision, Release of Hazardous Materials, and Fire, Casselton, North Dakota.","cited_authors":"National Transportation Safety Board","cited_year":"2017","cited_title":"Train Derailment and Subsequent Train Collision, Release of Hazardous Materials, and Fire, Casselton, North Dakota","cited_venue":"NTSB","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/RAB1701.pdf","ref_kind":"government_report","section":"Section 1.3.1 References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531400,"raw_reference":"U.S Environmental Protection Agency. (2016a). Ash Coulee Spill. December 2016.","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2016","cited_title":"Ash Coulee Spill","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":"https://response.epa.gov/site/site_profile.aspx?site_id=11952","ref_kind":"web_page","section":"Section 1.3.1 References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531401,"raw_reference":"U.S Environmental Protection Agency. (2016b). Pollution/Situation Report. ENTERPRISE PIPELINE SPILL- E17602 -- Polrep #3.","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2016","cited_title":"Pollution/Situation Report. ENTERPRISE PIPELINE SPILL- E17602 -- Polrep #3","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":"https://response.epa.gov/site/sitrep_profile.aspx?site_id=11890&counter=27892","ref_kind":"government_report","section":"Section 1.3.1 References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531402,"raw_reference":"United States Energy Information Administration. (2023). Total Crude Oil by Rail (Thousand Barrels).","cited_authors":"U.S. Energy Information Administration","cited_year":"2023","cited_title":"Total Crude Oil by Rail (Thousand Barrels)","cited_venue":"U.S. EIA","cited_doi":null,"cited_url":"https://www.eia.gov/dnav/pet/hist/LeafHandler.ashx?n=PET&s=ESM_EPC0_RAIL_ZAMNZAMN_MBBL&f=M","ref_kind":"dataset","section":"Section 1.3.1 References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531403,"raw_reference":"Etkin, D. (2004). Basic Oil Spill Cost Estimation Model (BOSCEM) for the U.S. Environmental Protection Agency.","cited_authors":"Etkin, D.","cited_year":"2004","cited_title":"Basic Oil Spill Cost Estimation Model (BOSCEM)","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix A (2017 Study) Section 2.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531404,"raw_reference":"Helton, D. and Penn, D. (1999). Natural resource damage assessments in the context of total costs of oil release incidents.","cited_authors":"Helton, D., Penn, D.","cited_year":"1999","cited_title":"Evaluation of natural resource damage assessments in the context of total costs of oil release incidents","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix A (2017 Study) Section 2.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531405,"raw_reference":"Simons, R. A., et al. (2001). Hedonic analysis of a pipeline rupture in Maryland affecting 2,300 single-family homes.","cited_authors":"Simons, R. A.","cited_year":"2001","cited_title":"Hedonic analysis of pipeline rupture effects on waterfront property values","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Appendix A (2017 Study) Section 2.3.4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531406,"raw_reference":"Kacik (2016) reports that several business owners filed a class action suit against the operator (Plains All American Pipelines) for lost revenues.","cited_authors":"Kacik","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"fn 8","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531407,"raw_reference":"Jepson and Colburn (2013) developed a set of social and economic indicators that establish the baseline economic and social characteristics of coastal communities","cited_authors":"Jepson and Colburn","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"fn 7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531408,"raw_reference":"O’Brien, 2015","cited_authors":"O’Brien","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"Section 2.3.6 CONCEPTUAL FRAMEWORK","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531409,"raw_reference":"Francingues, 2015","cited_authors":"Francingues","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"Section 2.3.6 CONCEPTUAL FRAMEWORK","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531410,"raw_reference":"Abt Associates and Bear Creek Economics (2016)","cited_authors":"Abt Associates; Bear Creek Economics","cited_year":"2016","cited_title":"Columbia River worst-case oil spill lost recreational fishing study","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 2.3.6 CONCEPTUAL FRAMEWORK","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531411,"raw_reference":"U.S. DOT, 2015a","cited_authors":"U.S. Department of Transportation","cited_year":"2015","cited_title":"Guidance on value of travel time","cited_venue":"U.S. DOT","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section 2.3.7 Travel Disruptions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531412,"raw_reference":"Dawotola et al., 2012; Hovey & Farmer, 1993","cited_authors":"Dawotola et al.; Hovey & Farmer","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.4 Incident Cause","page":null,"context_sentence":null,"paper_id":50179,"paper_title":"Risk-Based Maintenance of a Cross-Country Petroleum Pipeline System","paper_year":2012,"paper_doi":"10.1061/(asce)ps.1949-1204.0000121"},{"citation_id":531413,"raw_reference":"Restrepo et al. (2009) analyze PHMSA data on hazardous liquid pipeline accidents between January 2002 and 2005","cited_authors":"Restrepo et al.","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Section 2.4 Incident Cause","page":null,"context_sentence":null,"paper_id":27466,"paper_title":"Causes, cost consequences, and risk implications of accidents in US hazardous liquid pipeline infrastructure","paper_year":2008,"paper_doi":"10.1016/j.ijcip.2008.09.001"},{"citation_id":531414,"raw_reference":"Atkin, 2015; Young, 2014; Frittelli et al., 2014","cited_authors":"Atkin; Young; Frittelli et al.","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"fn 16","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531415,"raw_reference":"NTSB (2012) report on a 2010 release of crude oil from an Enbridge pipeline in Marshall, Michigan","cited_authors":"National Transportation Safety Board","cited_year":"2012","cited_title":"Enbridge Marshall, Michigan pipeline rupture accident report","cited_venue":"NTSB","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section 3.3.5 National Transportation Safety Board Reports","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531416,"raw_reference":"Pacific Coast Business Times, 2015a","cited_authors":"Pacific Coast Business Times","cited_year":"2015","cited_title":null,"cited_venue":"Pacific Coast Business Times","cited_doi":null,"cited_url":null,"ref_kind":"news","section":"Section 7.3.2 Uncertainty Leading to Potential Understatement","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531417,"raw_reference":"Pacific Coast Business Times, 2015b","cited_authors":"Pacific Coast Business Times","cited_year":"2015","cited_title":null,"cited_venue":"Pacific Coast Business Times","cited_doi":null,"cited_url":null,"ref_kind":"news","section":"Section 7.3.2 Uncertainty Leading to Potential Understatement","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531795,"raw_reference":"Kiefner & Associates, Inc. 2007. Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines. Final Report to US Department of Transportation, Pipeline and Hazardous Materials Safety Administration (PHMSA) No. 05-12R. Worthington, OH: Kiefner and Associates, Inc.","cited_authors":"Kiefner and Associates, Inc.","cited_year":"2007","cited_title":"Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_venue":"Final Report to PHMSA No. 05-12R, Worthington, OH: Kiefner and Associates, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"2.6 Threat Assessment and Interactions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531796,"raw_reference":"Hagemann et al., 2013","cited_authors":"Hagemann et al.","cited_year":"2013","cited_title":"Comprehensive Costs of Highway-Rail Grade Crossing Crashes (NCHRP Report 755)","cited_venue":"National Cooperative Highway Research Program","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 1 / 5 Costs to Roadway Users","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":531797,"raw_reference":"Taylor, Catherine L., et al. 2023. Cost of Delay from HAZMAT Rail Incidents: Final Report. DOT-VNTSC-PHMSA-23-01","cited_authors":"Catherine L. Taylor, Gary Baker, Andrew Eilbert, David Hyde, Matthew Keen, Sarah Plotnick, Claire Roycroft, Peter Wilke","cited_year":"2023","cited_title":"Cost of Delay from HAZMAT Rail Incidents: Final Report","cited_venue":"U.S. Department of Transportation John A Volpe National Transportation Systems Center","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Cost of Delay from HAZMAT Rail Incidents report, cover page","page":null,"context_sentence":null,"paper_id":59607,"paper_title":"Cost of Delay from HAZMAT Rail Incidents: Final Report","paper_year":2023,"paper_doi":null},{"citation_id":532198,"raw_reference":"DieselNet, “Emission Standards – United States: Locomotives,” Accessed: 22 Jan 2021, https://dieselnet.com/standards/us/loco.php.","cited_authors":"DieselNet","cited_year":"2021","cited_title":"Emission Standards – United States: Locomotives","cited_venue":"DieselNet","cited_doi":null,"cited_url":"https://dieselnet.com/standards/us/loco.php","ref_kind":"web_page","section":"fn 62","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532199,"raw_reference":"Lai, Y.-C., & Barkan, C. (2009). Enhanced Parametric Railway Capacity Evaluation Tool. Transportation Research Record, 2117, 33–40. https://doi.org/10.3141/2117-05","cited_authors":"Lai, Y.-C., Barkan, C.","cited_year":"2009","cited_title":"Enhanced Parametric Railway Capacity Evaluation Tool","cited_venue":"Transportation Research Record, 2117","cited_doi":"10.3141/2117-05","cited_url":"https://doi.org/10.3141/2117-05","ref_kind":"journal_article","section":"fn 72","page":null,"context_sentence":null,"paper_id":27460,"paper_title":"Enhanced Parametric Railway Capacity Evaluation Tool","paper_year":2009,"paper_doi":"10.3141/2117-05"},{"citation_id":532200,"raw_reference":"Lovett et al (2017)","cited_authors":"Lovett et al.","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"fn 73","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532201,"raw_reference":"Office of Budget and Policy. (December 2019). 2018 National Transit Summaries and Trends. Federal Transit Administration.","cited_authors":"Office of Budget and Policy","cited_year":"2019","cited_title":"2018 National Transit Summaries and Trends","cited_venue":"Federal Transit Administration","cited_doi":null,"cited_url":"https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/ntd/data-product/134401/2018-ntst_1.pdf","ref_kind":"research_report","section":"4.3.2.1 Cost of Operating Buses, fn 99","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532202,"raw_reference":"Schafer & Barkan, 2008","cited_authors":"Schafer, M., Barkan, C.","cited_year":"2008","cited_title":"A Prediction Model for Broken Rails and an Analysis of their Economic Impact","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Appendix A: Review of Literature","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532203,"raw_reference":"Schlake et al., 2011","cited_authors":"Schlake et al.","cited_year":"2011","cited_title":"Train Delay and Economic Impact of In-Service Failures of Railroad Rolling Stock","cited_venue":null,"cited_doi":"10.3141/2261-14","cited_url":null,"ref_kind":"journal_article","section":"Appendix A: Review of Literature","page":null,"context_sentence":null,"paper_id":27478,"paper_title":"Train Delay and Economic Impact of In-Service Failures of Railroad Rolling Stock","paper_year":2011,"paper_doi":"10.3141/2261-14"},{"citation_id":532204,"raw_reference":"Lovett et al., 2017","cited_authors":"Lovett et al.","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Appendix A: Review of Literature","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532205,"raw_reference":"Bureau of Transportation Statistics, “Fleet Composition of Rail Tank Cars Carrying Flammable Liquids: 2021 Report,” accessed 2023, https://doi.org/10.21949/1523084.","cited_authors":"United States Department of Transportation. Bureau of Transportation Statistics","cited_year":"2023","cited_title":"Fleet Composition of Rail Tank Cars Carrying Flammable Liquids: 2021 Report","cited_venue":"Bureau of Transportation Statistics","cited_doi":"10.21949/1523084","cited_url":"https://doi.org/10.21949/1523084","ref_kind":"dataset","section":"10.1 Regulatory Background, fn 121","page":null,"context_sentence":null,"paper_id":27497,"paper_title":"Fleet Composition of Rail Tank Cars Carrying Flammable Liquids: 2021 Report","paper_year":2021,"paper_doi":"10.21949/1523084"},{"citation_id":532282,"raw_reference":"Association of American Railroads (AAR). 2016b. What We Haul: Crude Oil by Rail.","cited_authors":"Association of American Railroads","cited_year":"2016","cited_title":"What We Haul: Crude Oil by Rail","cited_venue":"Association of American Railroads","cited_doi":null,"cited_url":"https://www.aar.org/todays-railroads/what-we-haul/crude-oil-by-rail","ref_kind":"web_page","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532283,"raw_reference":"Association of American Railroads (AAR). 2015. U.S. Rail Crude Oil Traffic.","cited_authors":"Association of American Railroads","cited_year":"2015","cited_title":"U.S. Rail Crude Oil Traffic","cited_venue":"Association of American Railroads","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532284,"raw_reference":"California Department of Fish and Wildlife (California DFW). 2015. Refugio Beach Oil Spill Natural Resource Damage Assessment Update: November 2015.","cited_authors":"California Department of Fish and Wildlife","cited_year":"2015","cited_title":"Refugio Beach Oil Spill Natural Resource Damage Assessment Update: November 2015","cited_venue":"California Department of Fish and Wildlife","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532285,"raw_reference":"Eifling, S. 2013. The Forgotten in Mayflower. Arkansas Times, August 08, 2013.","cited_authors":"Eifling, S.","cited_year":"2013","cited_title":"The Forgotten in Mayflower: People Who Live Within Sight of the Ruptured Pegasus Pipeline Say They've Been Ignored by ExxonMobil and Government Officials","cited_venue":"Arkansas Times","cited_doi":null,"cited_url":"http://www.arktimes.com/arkansas/the-forgotten-mayflower-residents/Content?oid=3007639&showFullText=true","ref_kind":"news","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532286,"raw_reference":"Enbridge, Inc. 2015. 2014 Annual Report.","cited_authors":"Enbridge, Inc.","cited_year":"2015","cited_title":"2014 Annual Report","cited_venue":"Enbridge, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532287,"raw_reference":"Enbridge, Inc. 2014. Annual Report: 2013.","cited_authors":"Enbridge, Inc.","cited_year":"2014","cited_title":"Annual Report: 2013","cited_venue":"Enbridge, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532288,"raw_reference":"Fehling, D. 2012. Moving Crude Oil Relies on Aging Pipeline System. State Impact: A Reporting Project of NPR Member Stations.","cited_authors":"Fehling, D.","cited_year":"2012","cited_title":"Moving Crude Oil Relies on Aging Pipeline System","cited_venue":"State Impact, NPR Member Stations","cited_doi":null,"cited_url":"https://stateimpact.npr.org/texas/2012/09/05/moving-crude-relies-on-aging-pipeline-system/","ref_kind":"news","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532289,"raw_reference":"Frittelli, J. A. Andrews, P.W. Parfomak, R. Pirog, J.L. Ramseur, and M. Ratner. 2014. U.S. Rail Transportation of Crude Oil: Background and Issues for Congress. Congressional Research Service. 7-5700.","cited_authors":"Frittelli, J.; Andrews, A.; Parfomak, P.W.; Pirog, R.; Ramseur, J.L.; Ratner, M.","cited_year":"2014","cited_title":"U.S. Rail Transportation of Crude Oil: Background and Issues for Congress","cited_venue":"Congressional Research Service","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":59327,"paper_title":"U.S. Rail Transportation of Crude Oil: Background and Issues for Congress","paper_year":2014,"paper_doi":null},{"citation_id":532290,"raw_reference":"Frosch, D. 2013. Oil Spill In North Dakota Raises Detection Concerns, New York Times, October 23, 2013.","cited_authors":"Frosch, D.","cited_year":"2013","cited_title":"Oil Spill In North Dakota Raises Detection Concerns","cited_venue":"New York Times","cited_doi":null,"cited_url":"http://www.nytimes.com/2013/10/24/us/oil-spill-in-north-dakota-raises-detection-concerns.html","ref_kind":"news","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532291,"raw_reference":"Hallenbeck, M.E., A. Goodchild, and J. Drescher. 2014. Travel Costs Associated with Flood Closures of State Highways Near Centralia/Chehalis, Washington. Washington Transportation Center (TRACUW).","cited_authors":"Hallenbeck, M.E.; Goodchild, A.; Drescher, J.","cited_year":"2014","cited_title":"Travel Costs Associated with Flood Closures of State Highways Near Centralia/Chehalis, Washington","cited_venue":"Washington Transportation Center (TRACUW)","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":59602,"paper_title":"Travel costs associated with flood closures of state highways near Centralia/Chehalis, Washington.","paper_year":2014,"paper_doi":null},{"citation_id":532292,"raw_reference":"Holland, M. 2010. Trans-Alaska Pipeline Spill Toll 5,000 Barrels. AND.Com, May 28, 2010.","cited_authors":"Holland, M.","cited_year":"2010","cited_title":"Trans-Alaska Pipeline Spill Toll 5,000 Barrels","cited_venue":"AND.Com","cited_doi":null,"cited_url":"https://www.adn.com/economy/article/trans-alaska-pipeline-spill-toll-5000-barrels/2010/05/28/","ref_kind":"news","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532293,"raw_reference":"Nalder, E. 2010. Old Pipelines Are a Hidden Menace. Houston Chronicle, November 15, 2010.","cited_authors":"Nalder, E.","cited_year":"2010","cited_title":"Old Pipelines Are a Hidden Menace","cited_venue":"Houston Chronicle","cited_doi":null,"cited_url":"http://www.chron.com/business/energy/article/Old-pipelines-are-a-hidden-menace1605649.php","ref_kind":"news","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532294,"raw_reference":"National Oceanic and Atmospheric Administration (NOAA). 2015. 10 Years After Being Hit by Hurricane Katrina, Seeing an Oiled Marsh at the Center of an Experiment in Oil Cleanup.","cited_authors":"National Oceanic and Atmospheric Administration","cited_year":"2015","cited_title":"10 Years After Being Hit by Hurricane Katrina, Seeing an Oiled Marsh at the Center of an Experiment in Oil Cleanup","cited_venue":"NOAA Office of Response and Restoration","cited_doi":null,"cited_url":"http://response.restoration.noaa.gov/about/media/10-years-after-being-hit-hurricane-katrina-seeing-oiled-marsh-center-experiment-oil-clea","ref_kind":"web_page","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532295,"raw_reference":"Pipeline and Hazardous Materials Safety Administration (PHMSA). 2016b. Hazardous Liquid Pipeline Miles and Tanks by Commodity.","cited_authors":"Pipeline and Hazardous Materials Safety Administration","cited_year":"2016","cited_title":"Hazardous Liquid Pipeline Miles and Tanks by Commodity","cited_venue":"U.S. Department of Transportation","cited_doi":null,"cited_url":"https://hip.phmsa.dot.gov/analyticsSOAP/saw.dll?Portalpages","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532296,"raw_reference":"Pipeline and Hazardous Materials Safety Administration (PHMSA). 2012. Emergency Response Guidebook.","cited_authors":"Pipeline and Hazardous Materials Safety Administration","cited_year":"2012","cited_title":"Emergency Response Guidebook","cited_venue":"U.S. Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532297,"raw_reference":"Plains All American Pipeline LP. 2016. Form 10-K (Annual Report) Filed 02/25/16 for the Period Ending 12/31/15.","cited_authors":"Plains All American Pipeline LP","cited_year":"2016","cited_title":"Form 10-K (Annual Report) for the Period Ending 12/31/15","cited_venue":"Securities and Exchange Commission","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532298,"raw_reference":"United States Energy Information Administration (U.S. EIA). 2016b. U.S. Crude Oil First Purchase Price. Release date 4/1/2016.","cited_authors":"U.S. Energy Information Administration","cited_year":"2016","cited_title":"U.S. Crude Oil First Purchase Price","cited_venue":"U.S. Energy Information Administration","cited_doi":null,"cited_url":"https://www.eia.gov/dnav/pet/hist_xls/F000000__3a.xls","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532299,"raw_reference":"United States Energy Information Administration (U.S. EIA). 2015. Petroleum & Other Liquids: Refinery Receipts of Crude Oil by Method of Transportation. Release date 6/19/2015.","cited_authors":"U.S. Energy Information Administration","cited_year":"2015","cited_title":"Petroleum & Other Liquids: Refinery Receipts of Crude Oil by Method of Transportation","cited_venue":"U.S. Energy Information Administration","cited_doi":null,"cited_url":"http://www.eia.gov/dnav/pet/pet_pnp_caprec_dcu_nus_a.htm","ref_kind":"dataset","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532300,"raw_reference":"United States Environmental Protection Agency (U.S. EPA). 2016. Sensitivity of Freshwater Habitats.","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2016","cited_title":"Sensitivity of Freshwater Habitats","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":"https://archive.epa.gov/emergencies/content/learning/web/html/freshwat.html","ref_kind":"web_page","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532301,"raw_reference":"United States Fish and Wildlife Service (USFWS) et al. 2015. Final Damage Assessment and Restoration Plan/Environmental Assessment for the July 25-26, 2010 Enbridge Line 6B Oil Discharges near Marshall, MI.","cited_authors":"U.S. Fish and Wildlife Service; Nottawaseppi Huron Band of the Potawatomi Tribe; Match-E-Be-Nash-She-Wish Band of the Pottawatomi Indians","cited_year":"2015","cited_title":"Final Damage Assessment and Restoration Plan/Environmental Assessment for the July 25-26, 2010 Enbridge Line 6B Oil Discharges near Marshall, MI","cited_venue":"USFWS","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532302,"raw_reference":"Utah Department of Environmental Quality (UDEQ). 2012b. Human Health Risk Assessment: Red Butte Creek, Salt Lake City, Utah. Prepared by McDaniel Lambert, Inc.","cited_authors":"Utah Department of Environmental Quality","cited_year":"2012","cited_title":"Human Health Risk Assessment: Red Butte Creek, Salt Lake City, Utah","cited_venue":"Prepared by McDaniel Lambert, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532303,"raw_reference":"Young, L. 2014. Crude oil spills are bigger from trains than pipelines. Global News.","cited_authors":"Young, L.","cited_year":"2014","cited_title":"Crude oil spills are bigger from trains than pipelines","cited_venue":"Global News","cited_doi":null,"cited_url":"http://globalnews.ca/news/1069624/how-do-crude-spills-compare-by-rail-truck-pipeline-you-may-be-surprised/","ref_kind":"news","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532304,"raw_reference":"Schleifstein, M. 2010. Extent of Oil Spills from Hurricanes Katrina and Rita is Still Being Assessed. The Times-Picayune, August 19, 2010.","cited_authors":"Schleifstein, M.","cited_year":"2010","cited_title":"Extent of Oil Spills from Hurricanes Katrina and Rita is Still Being Assessed","cited_venue":"The Times-Picayune","cited_doi":null,"cited_url":"http://www.nola.com/katrina/index.ssf/2010/08/extent_of_oil_spills_from_2005_hurricanes_is_still_being_assessed.html","ref_kind":"news","section":"fn 73","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532305,"raw_reference":"Merten, A.A. and C.B. Henry. 2008. Decision-Making Process to Use In-Situ Burning to Restore an Oiled Intermediate Marsh Following Hurricanes Katrina and Rita.","cited_authors":"Merten, A.A.; Henry, C.B.","cited_year":"2008","cited_title":"Decision-Making Process to Use In-Situ Burning to Restore an Oiled Intermediate Marsh Following Hurricanes Katrina and Rita","cited_venue":"International Oil Spill Conference","cited_doi":"10.7901/2169-3358-2008-1-545","cited_url":null,"ref_kind":"conference_paper","section":"fn 70","page":null,"context_sentence":null,"paper_id":50181,"paper_title":"DECISION-MAKING PROCESS TO USE IN-SITUBURNING TO RESTORE AN OILED INTERMEDIATE MARSH FOLLOWING HURRICANES KATRINA AND RITA","paper_year":2008,"paper_doi":"10.7901/2169-3358-2008-1-545"},{"citation_id":532407,"raw_reference":"API RP 1183, Assessment and Management of Dents in Pipelines","cited_authors":"American Petroleum Institute","cited_year":"2020","cited_title":"Assessment and Management of Dents in Pipelines","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section I, ECA methods (Part 7 text)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532408,"raw_reference":"GPAC Meeting Tr. 65 –80 (Mar. 28, 2018), https://primis.phmsa.dot.gov/meetings/FilGet.mtg?fil=972.","cited_authors":null,"cited_year":"2018","cited_title":"GPAC Meeting Tr.","cited_venue":"PHMSA Gas Pipeline Advisory Committee","cited_doi":null,"cited_url":"https://primis.phmsa.dot.gov/meetings/FilGet.mtg?fil=972","ref_kind":"other","section":"fn 46","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532409,"raw_reference":"Merriam-Webster dictionary, cluster (last visited Oct. 30, 2020)","cited_authors":"Merriam-Webster","cited_year":"2020","cited_title":"cluster","cited_venue":"Merriam-Webster","cited_doi":null,"cited_url":"https://www.merriam-webster.com/dictionary/cluster","ref_kind":"web_page","section":"Part VI.A, fn 63","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532410,"raw_reference":"https://www.merriam-webster.com/dictionary/group (last visited Oct. 30, 2020)","cited_authors":"Merriam-Webster","cited_year":"2020","cited_title":"group","cited_venue":"Merriam-Webster","cited_doi":null,"cited_url":"https://www.merriam-webster.com/dictionary/group","ref_kind":"web_page","section":"Part VI.A, fn 65","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532411,"raw_reference":"Tr. of Technical Pipeline Safety Standards Committee, at 248:8-9 (June 24, 1970)","cited_authors":"Technical Pipeline Safety Standards Committee","cited_year":"1970","cited_title":"Transcript of Technical Pipeline Safety Standards Committee meeting","cited_venue":"Technical Pipeline Safety Standards Committee","cited_doi":null,"cited_url":"https://www.regulations.gov/document?D=PHMSA-2014-0095-0034","ref_kind":"other","section":"Part VI.A, fn 60","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532412,"raw_reference":"Pipeline Investigation Report NTSB/PIR-22/02, Enbridge Inc. Natural Gas Transmission Pipeline Rupture and Fire, Danville, Kentucky, August 1, 2019","cited_authors":"National Transportation Safety Board","cited_year":"2022","cited_title":"Enbridge Inc. Natural Gas Transmission Pipeline Rupture and Fire, Danville, Kentucky, August 1, 2019","cited_venue":"National Transportation Safety Board","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"NTSB report following the Part 7 document","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":532413,"raw_reference":"Kiefner and Associates, Inc. 2007, Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_authors":"Kiefner and Associates, Inc.","cited_year":"2007","cited_title":"Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_venue":"PHMSA","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"NTSB Analysis Section 2.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":533171,"raw_reference":"Sillars, D. N. and J. Riedl, \"Framework Model for Determining Incentive and Disincentive Amounts,\" Transportation Research Record No. 2040, Journal of the Transportation Research Board, Transportation Research Board, Washington, D.C., 2007.","cited_authors":"Sillars, D. N., J. Riedl","cited_year":"2007","cited_title":"Framework Model for Determining Incentive and Disincentive Amounts","cited_venue":"Transportation Research Record No. 2040, Transportation Research Board","cited_doi":"10.3141/2040-02","cited_url":null,"ref_kind":"journal_article","section":"Chapter 4.4.4 (Sillars 2007 cited in text)","page":null,"context_sentence":null,"paper_id":27475,"paper_title":"Framework Model for Determining Incentive and Disincentive Amounts","paper_year":2007,"paper_doi":"10.3141/2040-02"},{"citation_id":533172,"raw_reference":"Ullman, G. L., M. D. Finley, J.E. Bryden, R. Srinivasan and F.M. Council, Traffic Safety Evaluation of Nighttime and Daytime Work Zones, NCHRP Report 627, National Cooperative Highway Research Program, Transportation Research Board, Washington, DC, 2008.","cited_authors":"Ullman, G. L., M. D. Finley, J. E. Bryden, R. Srinivasan, F. M. Council","cited_year":"2008","cited_title":"Traffic Safety Evaluation of Nighttime and Daytime Work Zones","cited_venue":"NCHRP Report 627, Transportation Research Board","cited_doi":"10.17226/14196","cited_url":null,"ref_kind":"research_report","section":"5.1.3.4 Work Zone Crash Rate","page":null,"context_sentence":null,"paper_id":27458,"paper_title":"Traffic Safety Evaluation of Nighttime and Daytime Work Zones","paper_year":2008,"paper_doi":"10.17226/14196"},{"citation_id":533262,"raw_reference":"A. Atalah, “The Ground Vibration Associated With Pipe Bursting in Rock Conditions,” paper presented at North American Society for Trenchless Technology, NO-DIG 2004, New Orleans, Louisiana, March 22-24, 2004.","cited_authors":"A. Atalah","cited_year":"2004","cited_title":"The Ground Vibration Associated With Pipe Bursting in Rock Conditions","cited_venue":"North American Society for Trenchless Technology, NO-DIG 2004","cited_doi":null,"cited_url":null,"ref_kind":"conference_paper","section":"fn 49","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":533263,"raw_reference":"PHMSA report from 2007, No. 05-12R, Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_authors":"PHMSA","cited_year":"2007","cited_title":"Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_venue":"Pipeline and Hazardous Materials Safety Administration","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 1.7.5.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":533264,"raw_reference":"Pacific Gas and Electric Company, Pipeline Public Awareness Plan, Procedure No. RMP-12, dated January 26, 2010.","cited_authors":"Pacific Gas and Electric Company","cited_year":"2010","cited_title":"Pipeline Public Awareness Plan, Procedure No. RMP-12","cited_venue":"Pacific Gas and Electric Company","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"fn 95","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":533795,"raw_reference":"Wildenthal, M.T. and J.L. Buffington, “Estimated Construction Period Impact of Widening State Highway 21, in Caldwell, Texas,” Transportation Research Record No. 1559, Journal of the Transportation Research Board, Washington, D.C, 1996.","cited_authors":"Wildenthal, M.T.; Buffington, J.L.","cited_year":"1996","cited_title":"Estimated Construction Period Impact of Widening State Highway 21, in Caldwell, Texas","cited_venue":"Transportation Research Record No. 1559","cited_doi":"10.1177/0361198196155900110","cited_url":null,"ref_kind":"journal_article","section":"2.7.2 Business and Local Community Impacts","page":null,"context_sentence":null,"paper_id":50182,"paper_title":"Estimated Construction Period Impact of Widening State Highway 21 in Caldwell, Texas","paper_year":1996,"paper_doi":"10.1177/0361198196155900110"},{"citation_id":533796,"raw_reference":"Traffic Monitoring Guide, Report No FHWA-PL-01-021, Office of Highway Policy Information, Federal Highway Administration, Washington, DC, 2001.","cited_authors":null,"cited_year":"2001","cited_title":"Traffic Monitoring Guide","cited_venue":"Report No FHWA-PL-01-021, Federal Highway Administration","cited_doi":null,"cited_url":"http://www.fhwa.dot.gov/ohim/tmguide/index.htm","ref_kind":"research_report","section":"2.8.2 Traffic composition","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":533797,"raw_reference":"Highway Capacity Manual 2010, Transportation Research Board, Washington DC, 2010.","cited_authors":null,"cited_year":"2010","cited_title":"Highway Capacity Manual 2010","cited_venue":"Transportation Research Board","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"2.8.4 Work Zone Capacity","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":533798,"raw_reference":"Jiang, Y. Traffic capacity, Speed and Queue-discharge rate for Indiana’s Four-lane Freeway Work Zones. Transportation Research Record No. 1657, Journal of the Transportation Research Board, Washington, D.C.,1999","cited_authors":"Jiang, Y.","cited_year":"1999","cited_title":"Traffic capacity, Speed and Queue-discharge rate for Indiana's Four-lane Freeway Work Zones","cited_venue":"Transportation Research Record No. 1657","cited_doi":"10.3141/1657-02","cited_url":null,"ref_kind":"journal_article","section":"2.8.4 Work Zone Capacity","page":null,"context_sentence":null,"paper_id":27473,"paper_title":"Traffic Capacity, Speed, and Queue-Discharge Rate of Indiana’s Four-Lane Freeway Work Zones","paper_year":1999,"paper_doi":"10.3141/1657-02"},{"citation_id":533799,"raw_reference":"Alexiadis, V., K. Jeannotte and A. Chandra, Traffic Analysis Toolbox Volume I: Traffic Analysis Tools Primer, Report No. FHWA-HRT-04-038, Office of Operations, Federal Highway Administration, Washington, DC, 2004.","cited_authors":"Alexiadis, V.; Jeannotte, K.; Chandra, A.","cited_year":"2004","cited_title":"Traffic Analysis Toolbox Volume I: Traffic Analysis Tools Primer","cited_venue":"Report No. FHWA-HRT-04-038, Federal Highway Administration","cited_doi":null,"cited_url":"http://ops.fhwa.dot.gov/trafficanalysistools/tat_vol1/sectapp_a.htm","ref_kind":"research_report","section":"2.9.1.1 Sketch-Planning and HCM Methodologies","page":null,"context_sentence":null,"paper_id":59563,"paper_title":"TRAFFIC ANALYSIS TOOLBOX VOLUME I: TRAFFIC ANALYSIS TOOLS PRIMER","paper_year":2004,"paper_doi":null},{"citation_id":533800,"raw_reference":"Ellis, R., J. Pyeon, Z. Herbsman, E. Minchin, and K. Molenaar, Evaluation of Alternative Contracting Techniques on Florida DOT Construction Projects, Final Report, Contract No. FDOT BDC51, 2007.","cited_authors":"Ellis, R.; Pyeon, J.; Herbsman, Z.; Minchin, E.; Molenaar, K.","cited_year":"2007","cited_title":"Evaluation of Alternative Contracting Techniques on Florida DOT Construction Projects","cited_venue":"Florida Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"4.1 Overview","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":533801,"raw_reference":"Thomas, H. R., R. D. Ellis, and S. K. Sinha, Improving the Time Performance of Highway Construction Contracts, Final Report, NCHRP Project No. 20-24(12)A, 2006.","cited_authors":"Thomas, H.R.; Ellis, R.D.; Sinha, S.K.","cited_year":"2006","cited_title":"Improving the Time Performance of Highway Construction Contracts","cited_venue":"NCHRP Project 20-24(12)A, Transportation Research Board","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"4.2.1 Need for Schedule-focused Alternative Contracting Strategies","page":null,"context_sentence":null,"paper_id":59400,"paper_title":"IMPROVING THE TIME PERFORMANCE OF HIGHWAY CONSTRUCTION CONTRACTS","paper_year":2006,"paper_doi":null},{"citation_id":533802,"raw_reference":"Crossett, J., and Hines, Comparing State Dots' Construction Project Cost & Schedule Performance – 28 Best Practices from 9 States, Final Report, NCHRP Project 20-24, Task 37A, 2007.","cited_authors":"Crossett, J.; Hines","cited_year":"2007","cited_title":"Comparing State Dots' Construction Project Cost & Schedule Performance – 28 Best Practices from 9 States","cited_venue":"NCHRP Project 20-24, Task 37A, Transportation Research Board","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"4.2.1 Need for Schedule-focused Alternative Contracting Strategies","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":533803,"raw_reference":"Shr, J. F., B. P.Thompson, J. S. Russell, B. Ran, and H. P. Tserng, “Determining Minimum Contract Time for Highway Projects,” Transportation Research Record No. 1742, 2000.","cited_authors":"Shr, J.F.; Thompson, B.P.; Russell, J.S.; Ran, B.; Tserng, H.P.","cited_year":"2000","cited_title":"Determining Minimum Contract Time for Highway Projects","cited_venue":"Transportation Research Record No. 1742","cited_doi":"10.3141/1712-23","cited_url":null,"ref_kind":"journal_article","section":"4.4 Establish Key I/D Parameters","page":null,"context_sentence":null,"paper_id":50185,"paper_title":"Determining Minimum Contract Time for Highway Projects","paper_year":2000,"paper_doi":"10.3141/1712-23"},{"citation_id":533804,"raw_reference":"Herbsman, Z. J., W. T. Chen, and W. C. Epstein, “Time is Money: Innovative Contracting Methods in Highway Construction,” Journal of Construction Engineering and Management, Vol. 121, No. 3, 1995.","cited_authors":"Herbsman, Z.J.; Chen, W.T.; Epstein, W.C.","cited_year":"1995","cited_title":"Time is Money: Innovative Contracting Methods in Highway Construction","cited_venue":"Journal of Construction Engineering and Management","cited_doi":"10.1061/(asce)0733-9364(1995)121:3(273)","cited_url":null,"ref_kind":"journal_article","section":"4.4.1 Establishing I/D Amount","page":null,"context_sentence":null,"paper_id":50186,"paper_title":"Time Is Money: Innovative Contracting Methods in Highway Construction","paper_year":1995,"paper_doi":"10.1061/(asce)0733-9364(1995)121:3(273)"},{"citation_id":533805,"raw_reference":"Caputo, F., and S. Scott, Criteria and Guidelines for Innovative Contracting, Final Report, Study No. SD95-07, South Dakota Department of Transportation, Pierre, SD, 1996.","cited_authors":"Caputo, F.; Scott, S.","cited_year":"1996","cited_title":"Criteria and Guidelines for Innovative Contracting","cited_venue":"Study No. SD95-07, South Dakota Department of Transportation","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"4.2.2.3 Lane Rental","page":null,"context_sentence":null,"paper_id":59580,"paper_title":"Criteria and guidelines for innovative contracting","paper_year":1996,"paper_doi":null},{"citation_id":533810,"raw_reference":"Lovett, A. H., Dick, C. T., & Barkan, C. P. L. (2017). Predicting the Cost and Operational Impacts of Slow Orders on Rail Lines in North America. 13.","cited_authors":"Lovett, A. H., Dick, C. T., & Barkan, C. P. L.","cited_year":"2017","cited_title":"Predicting the Cost and Operational Impacts of Slow Orders on Rail Lines in North America","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Additional PRIA References, Lovett et al. (2017)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":533811,"raw_reference":"Dingler, M. H. (2010). The Impact of Operational Strategies and New Technologies on Railroad Capacity [Thesis, University of Illinois at Urbana-Champaign]. https://www.ideals.illinois.edu/bitstream/handle/2142/18362/Dingler_Mark.pdf?sequence=1&isAllowed=y","cited_authors":"Dingler, M. H.","cited_year":"2010","cited_title":"The Impact of Operational Strategies and New Technologies on Railroad Capacity","cited_venue":"University of Illinois at Urbana-Champaign","cited_doi":null,"cited_url":"https://www.ideals.illinois.edu/bitstream/handle/2142/18362/Dingler_Mark.pdf?sequence=1&isAllowed=y","ref_kind":"other","section":"Modeling Congestion-Related Delay / Simulation Congestion Modeling","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":533812,"raw_reference":"Krueger, H. (1999). Parametric modeling in rail capacity planning. WSC'99. 1999 Winter Simulation Conference Proceedings.","cited_authors":"Krueger, H.","cited_year":"1999","cited_title":"Parametric modeling in rail capacity planning","cited_venue":"WSC'99. 1999 Winter Simulation Conference Proceedings","cited_doi":"10.1109/wsc.1999.816840","cited_url":"https://doi.org/10.1109/WSC.1999.816840","ref_kind":"conference_paper","section":"Parametric Models of Delay","page":null,"context_sentence":null,"paper_id":27453,"paper_title":"Parametric modeling in rail capacity planning","paper_year":2003,"paper_doi":"10.1109/wsc.1999.816840"},{"citation_id":533813,"raw_reference":"Mitra, S., Tolliver, D., Mitra, S., Bachkar, K., & Kayabas, P. (2010). Estimation of Railroad Capacity Using Parametric Methods. Journal of the Transportation Research Forum, 49(2).","cited_authors":"Mitra, S., Tolliver, D., Mitra, S., Bachkar, K., & Kayabas, P.","cited_year":"2010","cited_title":"Estimation of Railroad Capacity Using Parametric Methods","cited_venue":"Journal of the Transportation Research Forum, 49(2)","cited_doi":"10.5399/osu/jtrf.49.2.4503","cited_url":"https://doi.org/10.5399/osu/jtrf.49.2.4503","ref_kind":"journal_article","section":"Parametric Models of Delay","page":null,"context_sentence":null,"paper_id":27483,"paper_title":"Estimation of Railroad Capacity Using Parametric Methods","paper_year":2010,"paper_doi":"10.5399/osu/jtrf.49.2.4503"},{"citation_id":533814,"raw_reference":"Dingler, M., Lai, Y.-C., & Barkan, C. (2009). Impact of Train Type Heterogeneity on Single-Track Railway Capacity. Transportation Research Record, 2117, 41–49.","cited_authors":"Dingler, M., Lai, Y.-C., & Barkan, C.","cited_year":"2009","cited_title":"Impact of Train Type Heterogeneity on Single-Track Railway Capacity","cited_venue":"Transportation Research Record, 2117","cited_doi":"10.3141/2117-06","cited_url":"https://doi.org/10.3141/2117-06","ref_kind":"journal_article","section":"fn 126","page":null,"context_sentence":null,"paper_id":27498,"paper_title":"Impact of Train Type Heterogeneity on Single-Track Railway Capacity","paper_year":2009,"paper_doi":"10.3141/2117-06"},{"citation_id":533815,"raw_reference":"Sogin, S. L., Barkan, C. P., Lai, Y.-C., & Saat, M. R. (2012). Measuring the Impact of Additional Rail Traffic Using Highway and Railroad Metrics. 2012 Joint Rail Conference, 475–484.","cited_authors":"Sogin, S. L., Barkan, C. P., Lai, Y.-C., & Saat, M. R.","cited_year":"2012","cited_title":"Measuring the Impact of Additional Rail Traffic Using Highway and Railroad Metrics","cited_venue":"2012 Joint Rail Conference","cited_doi":"10.1115/jrc2012-74133","cited_url":null,"ref_kind":"conference_paper","section":"Simulation Congestion Modeling","page":null,"context_sentence":null,"paper_id":27481,"paper_title":"Measuring the Impact of Additional Rail Traffic Using Highway and Railroad Metrics","paper_year":2012,"paper_doi":"10.1115/jrc2012-74133"},{"citation_id":533816,"raw_reference":"Qiao, F., Gao, L., Saldarriaga, D., You, B., Li, Q., Song, L., Senouci, A., Dhatrak, O., & Yu, L. (2016). TRANSPORTATION AND ECONOMIC IMPACT OF TEXAS SHORT LINE RAILROADS (FHWA/TX-06887).","cited_authors":"Qiao, F., Gao, L., Saldarriaga, D., You, B., Li, Q., Song, L., Senouci, A., Dhatrak, O., & Yu, L.","cited_year":"2016","cited_title":"Transportation and Economic Impact of Texas Short Line Railroads","cited_venue":"Texas Department of Transportation and the Federal Highway Administration","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Additional PRIA References, References list","page":null,"context_sentence":null,"paper_id":59489,"paper_title":"Transportation and Economic Impact of Texas Short Line Railroads","paper_year":2016,"paper_doi":null},{"citation_id":533817,"raw_reference":"Schlake, B. W., Barkan, C. P. L., & Edwards, J. R. (2011). Train Delay and Economic Impact of In-Service Failures of Railroad Rolling Stock. Transportation Research Record, 2261(1), 124–133.","cited_authors":"Schlake, B. W., Barkan, C. P. L., & Edwards, J. R.","cited_year":"2011","cited_title":"Train Delay and Economic Impact of In-Service Failures of Railroad Rolling Stock","cited_venue":"Transportation Research Record, 2261(1)","cited_doi":"10.3141/2261-14","cited_url":"https://doi.org/10.3141/2261-14","ref_kind":"journal_article","section":"References list","page":null,"context_sentence":null,"paper_id":27478,"paper_title":"Train Delay and Economic Impact of In-Service Failures of Railroad Rolling Stock","paper_year":2011,"paper_doi":"10.3141/2261-14"},{"citation_id":533818,"raw_reference":"Graver, B. M., & Frey, H. C. (2013). Comparison of Locomotive Emissions Measured during Dynamometer versus Rail Yard Engine Load Tests. Transportation Research Record, 2341(1), 23–33.","cited_authors":"Graver, B. M., & Frey, H. C.","cited_year":"2013","cited_title":"Comparison of Locomotive Emissions Measured during Dynamometer versus Rail Yard Engine Load Tests","cited_venue":"Transportation Research Record, 2341(1)","cited_doi":"10.3141/2341-03","cited_url":"https://doi.org/10.3141/2341-03","ref_kind":"journal_article","section":"References list","page":null,"context_sentence":null,"paper_id":27499,"paper_title":"Comparison of Locomotive Emissions Measured during Dynamometer versus Rail Yard Engine Load Tests","paper_year":2013,"paper_doi":"10.3141/2341-03"},{"citation_id":533819,"raw_reference":"Mallela, J., & Sadasivam, S. Work Zone Road User Costs Concepts and Applications. FHWA-HOP-12-005, December 2011.","cited_authors":"Jagannath Mallela, Suri Sadasivam","cited_year":"2011","cited_title":"Work Zone Road User Costs – Concepts and Applications","cited_venue":"Federal Highway Administration, FHWA-HOP-12-005; Applied Research Associates, Inc.","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Work Zone Road User Costs report","page":null,"context_sentence":null,"paper_id":59478,"paper_title":"Work Zone Road User Costs: Concepts and Applications","paper_year":2011,"paper_doi":null},{"citation_id":533820,"raw_reference":"Ullman, G. L., M.D. Finley, J. E. Bryden, R. Srinivasan, and F. M. Council, Traffic Safety Evaluation of Nighttime and Daytime Work Zones, NCHRP Report 627, 2008.","cited_authors":"Ullman, G. L., Finley, M.D., Bryden, J. E., Srinivasan, R., Council, F. M.","cited_year":"2008","cited_title":"Traffic Safety Evaluation of Nighttime and Daytime Work Zones","cited_venue":"NCHRP Report 627, Transportation Research Board","cited_doi":"10.17226/14196","cited_url":null,"ref_kind":"research_report","section":"Work Zone Road User Costs: 2.4.1 Work Zone Crash Rate","page":null,"context_sentence":null,"paper_id":27458,"paper_title":"Traffic Safety Evaluation of Nighttime and Daytime Work Zones","paper_year":2008,"paper_doi":"10.17226/14196"},{"citation_id":533821,"raw_reference":"Council, F., E. Zaloshnja, T. Miller and B. Persaud, Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries, Report No. FHWA-HRT-05-051, 2005.","cited_authors":"Council, F., Zaloshnja, E., Miller, T., Persaud, B.","cited_year":"2005","cited_title":"Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries","cited_venue":"FHWA-HRT-05-051","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Work Zone Road User Costs: 2.4.3 Monetary Value of Crashes","page":null,"context_sentence":null,"paper_id":59556,"paper_title":"Crash Cost Estimates by Maximum Police-Reported Injury Severity Within Selected Crash Geometries","paper_year":2005,"paper_doi":null},{"citation_id":533822,"raw_reference":"Barth, M., F.An, T. Younglove, G. Scora, C. Levine, M. Ross and T. Wenzel, Development of a Comprehensive Modal Emissions Model, Final Report, NCHRP Project 25-11, 2000.","cited_authors":"Barth, M., An, F., Younglove, T., Scora, G., Levine, C., Ross, M., Wenzel, T.","cited_year":"2000","cited_title":"Development of a Comprehensive Modal Emissions Model","cited_venue":"NCHRP Project 25-11, National Cooperative Highway Research Program","cited_doi":null,"cited_url":"http://www.cert.ucr.edu/cmem/docs/NCHRP_Final_Report.pdf","ref_kind":"research_report","section":"Work Zone Road User Costs: 2.5.1.2 Dynamic Instantaneous Emission Models","page":null,"context_sentence":null,"paper_id":59555,"paper_title":"Development of a Comprehensive Modal Emissions Model","paper_year":2000,"paper_doi":null},{"citation_id":534265,"raw_reference":"Yohannes, Thomas, Harris, William, Hooper, Jacob, Trueblood, Amber Brooke. Trenching Injuries, Citations and Penalties in Construction. CPWR Data Bulletin, May 2024.","cited_authors":"Thomas Yohannes, William Harris, Jacob Hooper, Amber Brooke Trueblood","cited_year":"2024","cited_title":"Trenching Injuries, Citations and Penalties in Construction","cited_venue":"CPWR–The Center for Construction Research and Training","cited_doi":null,"cited_url":"https://www.cpwr.com/research/data-center/data-reports/","ref_kind":"research_report","section":"Overview","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534266,"raw_reference":"Hedmond, Shade. [2018]. Construction Junkie. OSHA Identifies Trenching and Excavation Hazard Reduction as Priority Goal for 2018.","cited_authors":"Shade Hedmond","cited_year":"2018","cited_title":"OSHA Identifies Trenching and Excavation Hazard Reduction as Priority Goal for 2018","cited_venue":"Construction Junkie","cited_doi":null,"cited_url":"https://www.constructionjunkie.com/blog/2018/3/12/osha-identifies-trenching-and-excavation-hazard-reduction-as-priority-goal-for-2018","ref_kind":"news","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534444,"raw_reference":"U.S. Census Bureau, U.S. Department of Commerce. Household Pulse Survey Data Tables. Accessed 2025. https://www.census.gov/programs-surveys/householdpulse-survey/data.html","cited_authors":"U.S. Census Bureau","cited_year":"2025","cited_title":"Household Pulse Survey Data Tables","cited_venue":"U.S. Census Bureau, U.S. Department of Commerce","cited_doi":null,"cited_url":"https://www.census.gov/programs-surveys/householdpulse-survey/data.html","ref_kind":"dataset","section":"References, ref 3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534445,"raw_reference":"U.S. Bureau of Labor Statistics, U.S. Department of Labor. Current Employment Statistics—CES (National). Accessed 2025. http://www.bls.gov/ces/home.htm","cited_authors":"U.S. Bureau of Labor Statistics","cited_year":"2025","cited_title":"Current Employment Statistics—CES (National)","cited_venue":"U.S. Department of Labor","cited_doi":null,"cited_url":"http://www.bls.gov/ces/home.htm","ref_kind":"dataset","section":"References, ref 4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534446,"raw_reference":"INRIX. National Trips Database, 2024. Accessed 2025. https://inrix.com/products/tripanalytics/","cited_authors":"INRIX","cited_year":"2025","cited_title":"National Trips Database, 2024","cited_venue":"INRIX","cited_doi":null,"cited_url":"https://inrix.com/products/tripanalytics/","ref_kind":"dataset","section":"References, ref 9","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534447,"raw_reference":"American Petroleum Institute. Addendum 1 to API Recommended Practice 1183. API, www.api.org/products-and-services/standards/important-standards-announcements/addendum-1-rp-1183.","cited_authors":"American Petroleum Institute","cited_year":"2024","cited_title":"Addendum 1 to API Recommended Practice 1183","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":"www.api.org/products-and-services/standards/important-standards-announcements/addendum-1-rp-1183","ref_kind":"other","section":"Canada Energy Regulator SA 2025-01, References 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534448,"raw_reference":"American Petroleum Institute, \"IPC2022-87301,\" Proceedings of the 2022 14th International Pipeline Conference, IPC2022-87301, September 26-30, 2022, Calgary, Alberta, Canada.","cited_authors":"American Petroleum Institute","cited_year":"2022","cited_title":"IPC2022-87301","cited_venue":"Proceedings of the 2022 14th International Pipeline Conference","cited_doi":null,"cited_url":null,"ref_kind":"conference_paper","section":"Canada Energy Regulator SA 2025-01, References 2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534449,"raw_reference":"Pipeline Research Council International, \"PR-214-223806-R01 Guidance for Performing Engineering Critical Assessments for Dents on Natural Gas Pipelines (2),\" September 28, 2023.","cited_authors":"Pipeline Research Council International","cited_year":"2023","cited_title":"PR-214-223806-R01 Guidance for Performing Engineering Critical Assessments for Dents on Natural Gas Pipelines (2)","cited_venue":"Pipeline Research Council International","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Canada Energy Regulator SA 2025-01, References 3","page":null,"context_sentence":null,"paper_id":59592,"paper_title":"PR-214-223806-R01 Guidance for Performing Engineering Critical Assessments for Dents on Natural Gas Pipelines","paper_year":2023,"paper_doi":"10.55274/r0000044"},{"citation_id":534450,"raw_reference":"Battelle, Final Summary Report and Recommendations for the Comprehensive Study to Understand Longitudinal ERW Seam Failures – Phase One (2013)","cited_authors":"Battelle","cited_year":"2013","cited_title":"Final Summary Report and Recommendations for the Comprehensive Study to Understand Longitudinal ERW Seam Failures – Phase One","cited_venue":"Battelle","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"PHMSA class location comments (AGA et al.), fn 29","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534451,"raw_reference":"KIEFNER AND ASSOCIATES, EVALUATING THE STABILITY OF MANUFACTURING AND CONSTRUCTION DEFECTS IN NATURAL GAS PIPELINES (2007)","cited_authors":"Kiefner and Associates","cited_year":"2007","cited_title":"Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines","cited_venue":"Kiefner and Associates","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"PHMSA class location comments (AGA et al.), fn 30","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534452,"raw_reference":"T.J. BARLO, ORIGIN AND VALIDATION OF THE 100 MV POLARIZATION CRITERIA (2001)","cited_authors":"T.J. Barlo","cited_year":"2001","cited_title":"Origin and Validation of the 100 mV Polarization Criteria","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"PHMSA class location comments (AGA et al.), fn 35","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534453,"raw_reference":"Process Performance Improvement Consultants, Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation (Mar. 2017)","cited_authors":"Process Performance Improvement Consultants","cited_year":"2017","cited_title":"Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation","cited_venue":"INGAA","cited_doi":null,"cited_url":"http://www.ingaa.org/?id=35003","ref_kind":"research_report","section":"PHMSA class location comments (AGA et al.), fn 22","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":534454,"raw_reference":"Peabody, A.W., Control of Pipeline Corrosion (R.L. Bianchetti, P.E., ed., NACE International, 2018).","cited_authors":"A.W. Peabody","cited_year":"2018","cited_title":"Control of Pipeline Corrosion","cited_venue":"NACE International","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"PHMSA class location comments (AGA et al.), fn 39","page":null,"context_sentence":null,"paper_id":59559,"paper_title":"Peabody's Control of Pipeline Corrosion","paper_year":2018,"paper_doi":"10.5006/37617"}]}