Additional PRIA References
Original sourceAttachment (227 KB)Attachment (343 KB)Attachment (821 KB)Attachment (5.5 MB)Attachment (112 KB)Attachment (2.8 MB)Attachment (3.9 MB)Attachment (2.5 MB)Attachment (583 KB)Attachment (204 KB)Attachment (5.1 MB)Attachment (5.5 MB)Attachment (8.8 MB)
Other documents for the same rulemaking (all, by stage)
References: 373 extracted, 128 linked to papers
Dick, C. T., Zhao, J., Liu, X., & Kirkpatrick, S. W. (2021). Quantifying Recent Trends in Class 1 Freight Railroad Train Length and Weight by Train Type. Transportation Research Record, 2675(12), 890–903.
Barrow, N. (2019). Precision Scheduled Railroading—Evolution or revolution? International Railway Journal.
Association of American Railroads, Bureau of Explosives. (2018). Annual Report of Hazardous Materials Transported by Rail (BOE 17-1; p. 44).
Arizona Department of Transportation, 2010
Barth, M., F.An, T. Younglove, G. Scora, C. Levine, M. Ross and T. Wenzel, Development of a Comprehensive Modal Emissions Model, Final Report, NCHRP Project 25-11, National Cooperative Highway Research Program, Transportation Research Board, Washington DC, 2000.
Delucchi, M. and S. Hsu, The External Damage Cost of Noise Emitted from Motor Vehicles, Journal of Transportation and Statistics, Bureau of Transportation Statistics, 1998.
Wildenthal, M.T. and J.L. Buffington, "Estimated Construction Period Impact of Widening State Highway 21, in Caldwell, Texas," Transportation Research Record No. 1559, Journal of the Transportation Research Board, Washington, D.C, 1996.
Wolffing, C., J. Liesman, R. Young and K. Ksaibati, Highway Construction Related Business Impacts: Phase I Report, Report No. FHWA-WY-04/01F, Wyoming Department of Transportation, Cheyenne, WY, March 2004.
Hardy, M. and K. Wunderlich, Traffic Analysis Tools Volume IX: Work Zone Modeling and Simulation—A Guide for Analysts, Report No. FHWA-HOP-09-001, Office of Operations, Federal Highway Administration, Washington, DC, 2009.
Weng, J. and Q. Meng, A Decision Tree-based Model for Work Zone Capacity Estimation, Paper No. 11-0865, DVD Compendium, Proceedings of 90th Annual Meeting, Transportation Research Board, Washington, DC, 2011.
Benekohal, R. F. A. Kaja-Mohideen, M. V. Chitturi, A Methodology for Estimating Operating Speed and Capacity in Work Zones, Transportation Research Record No. 1883, Journal of the Transportation Research Board, Washington, DC, 2004.
Sarasua, W. A., W. J. Davis, D. B. Clarke, J. Kottapally, P. Mulukutla, Estimating Interstate Highway Capacity for Short-Term Work Zone Lane Closures: Development of Methodology, Transportation Research Record No. 1877, Journal of the Transportation Research Board, Washington, D.C., 2004.
Al-Kaisy, A. and F. Hall, Guidelines for Estimating Freeway Capacity at Long-Term Reconstruction Zones, CDROM Compendium, Proceedings of 81th Annual Meeting, Transportation Research Board, Washington, DC, 2002.
Kim, T., D. J. Lovell, and J. Paracha, A New Methodology to Estimate Capacity for Freeway Work Zones, Paper No. 01-0566, CDROM Compendium, Proceedings of 80th Annual Meeting, Transportation Research Board, Washington, DC, 2001.
Jiang, Y. Traffic capacity, Speed and Queue-discharge rate for Indiana's Four-lane Freeway Work Zones. Transportation Research Record No. 1657, Journal of the Transportation Research Board, Washington, D.C.,1999
Dixon, K. K., Hummer, J. E. and Lorscheider, A. R. Capacity for North Carolina Freeway Work Zones. Transportation Research Record No. 1529, Journal of the Transportation Research Board, Washington, D.C., 1996.
Krammes, R. A. and G. O. Lopez, Updated Short-Term Freeway Work Zone Lane Closure Capacity Values, Report No. FHWA/TX-92/1108-5, Texas Department of Transportation, Austin, TX, 1992.
Dudek, C. L. and S. H. Richards. Traffic Capacity through Work Zones on Urban Freeways. Report FHWA/TX-81/228-6, Texas Department of Transportation, Austin, TX, 1981.
Eisele, B., Schrank, D. and T. Lomax, 2011 Congested Corridors Report - Appendix B, Texas Transportation Institute, College Station, TX, 2011.
Jeannotte, K., and A. Chandra, Developing and Implementing Transportation Management Plans for Work Zones, Report No. FHWA-HOP-05-066, Office of Transportation Operations, Federal Highway Administration, Washington, DC, 2005.
Hardy, M., and K. Wunderlich, Traffic Analysis Tools Volume VIII: Work Zone Analysis - A Guide for Decision-Makers, Report No. FHWA-HOP-08-029, Office of Operations, Federal Highway Administration, Washington, DC, 2008.
Edara, P., Estimation of Traffic Impacts at Work Zones: State of the Practice, Report No. VTRC 06R25, Virginia Department of Transportation, Richmond, VA, 2006.
Lee, E. B., and C. W. Ibbs, Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies, ASCE Journal of Construction Engineering and Management, Vol. 131, No. 4, 2005.
Fick, G., E. T. Cackler, S. Trost, and L. Vanzler, Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts, Final Report, NCHRP Report No. 652, Transportation Research Board, 2010.
Ellis, R., J. Pyeon, Z. Herbsman, E. Minchin, and K. Molenaar, Evaluation of Alternative Contracting Techniques on Florida DOT Construction Projects, Final Report, Contract No. FDOT BDC51, Florida Department of Transportation, Gainesville, 2007.
Anderson, S.D., and I. Damnjanovic, Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion, NCHRP Synthesis 379, Transportation Research Board, 2008.
Thomas, H. R., R. D. Ellis, and S. K. Sinha, Improving the Time Performance of Highway Construction Contracts, Final Report, NCHRP Project No. 20-24(12)A, Transportation Research Board, 2006.
Crossett, J., and Hines, Comparing State Dots' Construction Project Cost & Schedule Performance – 28 Best Practices from 9 States, Final Report, NCHRP Project 20-24, Task 37A, Transportation Research Board, 2007.
McFarland, W. F., R.J. Kabat, and R. A. Krammes, Comparison of Contracting Strategies for Reducing Project Completion Time, Report No. FHWA/TX-94/1310-F, Texas Department of Transportation, Austin, TX, 1994.
Shr, J. F., B. P. Thompson, J. S. Russell, B. Ran, and H. P. Tserng, Determining Minimum Contract Time for Highway Projects, Transportation Research Record No. 1742, Transportation Research Board, 2000.
Herbsman, Z. J., W. T. Chen, and W. C. Epstein, Time is Money: Innovative Contracting Methods in Highway Construction, Journal of Construction Engineering and Management, Vol. 121, No. 3, 1995.
Jaraiedi, M., R. W. Plummer, and M. S. Aber, Incentive/Disincentive Guidelines for Highway Construction Contracts, Journal of Construction Engineering and Management, Vol. 121, No. 1, 1995.
Sillars, D. N., and J. Riedl, Framework Model for Determining Incentive and Disincentive Amounts, Transportation Research Record No. 2040, 2007.
NJDOT, Road User Cost Manual, New Jersey Department of Transportation, Trenton, NJ, 2001.
J.F. Kiefner and W.A. Maxey, "The Benefits and Limitations of Hydrostatic Testing," in E.W. McAllister, ed., Pipeline Rules of Thumb Handbook, 6th ed. (Boston: Elsevier, 2005), pp. 139–162.
Effects of Pressure Cycles on Gas Pipelines, report GRI-04/0178 (Des Plaines, Illinois: Gas Research Institute, 2004).
Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines, No. 05-12R (Washington, DC: Pipeline and Hazardous Materials Safety Administration, 2007).
Texas Eastern Gas Pipeline Company Ruptures and Fires at Beaumont, Kentucky, on April 27, 1985, and Lancaster, Kentucky, on February 21, 1986, Pipeline Accident Report NTSB/PAR-87/01 (Washington DC: National Transportation Safety Board, 1987).
Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown, Pipeline Safety Study NTSB/PSS-71/01 (Washington, DC: National Transportation Safety Board, 1970).
Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey, March 23, 1994, Pipeline Accident Report NTSB/PAR-95/01 (Washington, DC: National Transportation Safety Board, 1995.)
Unites States Steel, The Making, Shaping and Treating of Steel, 7th ed. (Pittsburgh, Pennsylvania: United States Steel Corporation, 1957).
Simicevic and Sterling, 2001.
Atalah, 2004.
Reason, J. Managing the Risks of Organizational Accidents (Burlington, Vermont: Ashgate Publishing Company, 1997).
Reason, J. "Achieving a Safe Culture: Theory and Practice," Work and Stress, vol. 12 (1998), p. 227.
Refinery Explosion and Fire, Investigation Report, report No. 205-04-1-TX (Washington, DC: U.S. Chemical Safety and Hazard Investigation Board, 2007).
Schafer & Barkan, 2008, A Prediction Model for Broken Rails and an Analysis of their Economic Impact
Schlake, B. W., Barkan, C. P. L., & Edwards, J. R. (2011). Train Delay and Economic Impact of In-Service Failures of Railroad Rolling Stock. Transportation Research Record: Journal of the Transportation Research Board, 2261(1), 124–133.
Lovett, A. H., Dick, C. T., & Barkan, C. P. L. (2017). Predicting the Cost and Operational Impacts of Slow Orders on Rail Lines in North America.
Krueger, 1999, Parametric modeling in rail capacity planning. WSC'99. 1999 Winter Simulation Conference Proceedings