Policy Replication

U.S. DOT/PHMSA - Draft Regulatory Impact Analysis - Hazardous Materials: Enhanced Tank Car Standards and Operational Controls for High-Hazard Flammable Trains; Notice of Proposed Rulemaking

Regulatory impact analysis2014-08-01 · PHMSA · regulatory_impact_analysis · PHMSA-2012-0082-0179
RIN 2137-AE91 · Docket PHMSA-2012-0082

Other documents for the same rulemaking

2013-09-06 Federal RegisterHazardous Materials: Rail Petitions and Recommendations To Improve the Safety of Railroad Tank Car Transportation (RRR)
2013-11-05 Federal RegisterHazardous Materials: Rail Petitions and Recommendations To Improve the Safety of Railroad Tank Car Transportation (RRR)
2014-06-05 Docket documentAPI 12866 Meeting
2014-08-01 Federal RegisterHazardous Materials: Enhanced Tank Car Standards and Operational Controls for High-Hazard Flammable Trains
2014-09-08 Docket documentAmerican Fuel & Petrochemical Manufacturers (AFPM) 12866 Meeting
2014-09-08 Docket documentQuantum Energy 12866 Meeting
2014-09-08 Docket documentPhillips 66 12866 Meeting
2014-09-08 Docket documentAmerican Chemical Council (ACC) 12866 Meeting
2014-09-08 Docket documentArcher Daniels Midland Company (ADM) 12866 Meeting
2014-09-08 Docket documentExxon Mobil 12866 Meeting
2014-09-08 Docket documentRenewable Fuels Association (RFA) 12866 Meeting
2014-09-08 Docket documentAssociation of American Railroads (AAR) EO 12866 Meeting
2014-09-08 Docket documentRailway Supply Institute (RSI) 12866 Meeting
2014-09-08 Docket documentGreenbrier 12866 Meeting
2014-09-08 Docket documentShell 12866 Meeting
2014-09-08 Docket documentNorth Dakota Petroleum Council EO 12866 Meeting
2014-09-08 Docket documentAssociation of American Railroads (AAR) July 12866 Meeting
2014-09-08 Docket documentAmerican Fuel & Petrochemical Manufacturers (AFPM) 12866 Meeting
2014-09-08 Docket documentStatoil 12866 Meeting
2014-09-08 Docket documentSubstantive Differences Between NPRM submitted to OIRA on April 30th and Published on August 1st
2014-09-08 Docket documentCopy of NPRM Provided to OIRA on April 30, 2014
2014-09-30 Docket documentSubstantive Differences Between Advance Notice of Proposed Rulemaking (ANPRM) Submitted to OIRA on August 6, 2013 and Published in the FR on September 6, 2013
2014-09-30 Docket documentJuly 15, 2013 Version of ANPRM Submitted by PHMSA to OIRA
2015-05-06 Regulatory impact analysisDOT/PHMSA - Final Regulatory Impact Analysis (RIA)- Hazardous Materials: Enhanced Tank Car Standards and Operational Controls for High-Hazard Flammable Trains; Final Rule
2015-05-07 Docket documentNotes from 12866 Meeting with Phillips - April 10, 2015
2015-05-07 Docket documentNotes from 12866 Meeting with Earthjustice Meeting - April 15, 2015
2015-05-07 Docket documentNotes from 12866 Meeting with CSX Meeting - April 28, 2015
2015-05-07 Docket documentNotes from 12866 Meeting with RSI/API Meeting- April 29, 2015
2015-05-08 Federal RegisterHazardous Materials: Enhanced Tank Car Standards and Operational Controls for High-Hazard Flammable Trains
2015-11-18 Federal RegisterHazardous Materials: Enhanced Tank Car Standards and Operational Controls for High-Hazard Flammable Trains

References: 16 extracted, 6 linked to papers

Page 1Download these results: CSV · JSON
"Benefit-Cost Analysis and Implementation Plan for Electronically Controlled Pneumatic Braking Technology in the Railroad Industry," Booz Allen Hamilton, August 2006, p. III-2.
research reportNot linked to a paper · fn 99
BLS May 2013 National Occupational Employment and Wage Estimates, available online at http://www.bls.gov/oes/current/oes_nat.htm#17-0000.
datasetNot linked to a paper · fn 100 · cited link
A recent study by the TTCI found that the rail freight industry spends 37 percent of its annual freight car repair cost of $1.5 billion on wheel replacements
research reportNot linked to a paper · Wheel Savings
Association of American Railroads. 2013. Railroads and Ethanol. Available online at https://www.aar.org/keyissues/Documents/Background-Papers/Railroads%20and%20Ethanol.pdf
research reportNot linked to a paper · fn 10 · cited link
Henry H. Willis, Andrew R. Morral, Terrence K. Kelly, Jamison Jo Medby, Estimating Terrorism Risk, RAND Center for Terrorism Risk Management Policy, 2005.
research reportNot linked to a paper · fn 22
Etkin, 2004. Modelling Oil Spill Response and Damage Costs. EPA Freshwater Spills Symposium. Available online at http://www.environmental-research.com/erc_papers/ERC_paper_6.pdf
Verma, Manish. 2009. Railroad transportation of dangerous goods: a conditional exposure approach to minimize transport risk. Transportation research part C.
Verma, Manish. 2009. A cost and expected consequence approach to planning and managing railroad transportation of hazardous materials. Transportation research part D
Glickman, Theodore S., Erkut, Efhan, and Zschocke, Mark S. 2007. The cost and risk impacts of rerouting railroad shipments of hazardous materials. Accident Analysis and Prevention. 39. 1015-1025.
Saat, M. Rapik, and Barkan, P.L. 2006. The effect of rerouting and tank car safety design on the risk of rail transport of hazardous materials. Proceedings of the 7th world congress on railway research. Montreal. June.
conference paperNot linked to a paper · fn 42
Kawprasert, Athaphon. 2010. Quantitative analysis of options to reduce risk of hazardous materials transportation by railroad. Ph.D. Dissertation in civil engineering. University of Illinois at Urbana-Champaign.
otherNot linked to a paper · fn 43
Federal Railroad Administration, ECP Brake System for Freight Service, Final Report, Booz Allen Hamilton, released August 2006.
Detailed Puncture Analyses Tank Cars: Analysis of Different Impactor Threats and Impact Conditions
Applied Research and Associates, Puncture Resistance Model
research reportNot linked to a paper · Table TC34
T87.6 Task Force Summary Report, PHMSA-2012-0082-0012
research reportNot linked to a paper · fn 88 · cited link
Sharma and Associates, Train Energy & Dynamics Simulator
research reportNot linked to a paper · Table B2