Policy Replication

← Rulemakings

180-Day Accumulation Time under RCRA for Generators of F006 Waste Water Treatment Sludges from the Metal Finishing Industry

RIN 2050-AE60 · ENVIRONMENTAL PROTECTION AGENCY · 10 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here.

2 documents in this rulemaking.
Pre-rulenoneNo OIRA review
Proposed ruleheldOIRA review 1998-10-14 · 1 document
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 1999-12-16 · 1 document
Regulatory impact analysisnone
Docket documentsno docket linked0 dockets; public comments not listed

Proposed rule stage: Federal Register documents (1)

180-Day Accumulation Time for Waste Water Treatment Sludges From the Metal Finishing Industry

Proposed rule (NPRM)1999-02-01 · FR 99-2323 · ENVIRONMENTAL PROTECTION AGENCY · 5 references, 1 linked to papers
Federal Register action: Proposed rule.
In this rulemaking because: RIN printed on the document (RIN 2050-AE60) · high confidence

Final rule stage: Federal Register documents (1)

180-Day Accumulation Time Under RCRA for Waste Water Treatment Sludges From the Metal Finishing Industry

Final rule2000-03-08 · FR 00-5503 · ENVIRONMENTAL PROTECTION AGENCY · 5 references, 1 linked to papers
Federal Register action: Final rule.
In this rulemaking because: RIN printed on the document (RIN 2050-AE60) · high confidence

OIRA reviews (2)

Proposed Rulereceived 1998-10-14, concluded 1999-01-15 · Consistent with change
Final Rulereceived 1999-12-16, concluded 2000-01-10 · Consistent with change