Policy Replication

Assessment of pollution prevention and control technology for plating operations

Paul D. Chalmer, W. Sonntag, George C. Cushnie
1995 · NASA Technical Reports Server (NASA) · conference-paper · 1 scholarly citations

This paper is behind a paywall; we link to the publisher only.

Cited in 3 places in policy documents

Revised Economic Assessment of the Association of Battery Recyclers Proposed Rule

Regulatory impact analysis2004-01-14 · EPA · Section 5.6 Metal Recycling Costs
Cushnie, George C., CAI Engineering, "Pollution Prevention and Control Technology for Plating Operations," prepared for NCMS/NAMF.

180-Day Accumulation Time Under RCRA for Waste Water Treatment Sludges From the Metal Finishing Industry

Federal Register2000-03-08 · ENVIRONMENTAL PROTECTION AGENCY · fn 7
George C. Cushnie Jr., National Center for Manufacturing Sciences & National Association of Metal Finishers, Pollution Prevention and Control Technology for Plating Operations (Ann Arbor, MI: National Center for Manufacturing Sciences, 1994), p.312.
In addition, literature reviewed in the development of this rulemaking indicates that recyclers sometimes assess a surcharge for small volumes of material due to increased handling and administrative costs.\7\ It is possible that a 180-day (or 270-day, if applicable) accumulation time will allow some F006 waste generators to reduce this surcharge. --------------------------------------------------------------------------- ---------------------------------------------------------------------------

180-Day Accumulation Time for Waste Water Treatment Sludges From the Metal Finishing Industry

Federal Register1999-02-01 · ENVIRONMENTAL PROTECTION AGENCY · fn 5
George C. Cushnie Jr., National Center for Manufacturing Sciences & National Association of Metal Finishers, Pollution Prevention and Control Technology for Plating Operations (Ann Arbor, MI: National Center for Manufacturing Sciences, 1994), p. 312.