Assessment of Texas Short Line Railroads
Cited in 2 places in policy documents
Hazardous Materials: Improving the Safety of Railroad Tank Car Transportation of Hazardous Materials
Jeffrey E. Warner & Manuel Solari Terra, “Assessment of Texas Short Line Railroads, “ Texas Transportation Institute (Nov. 15, 2005).
These connections have previously mandated upgrading to 286,000-pound capability. For example, in 2005, the Texas Transportation Institute reported that 42 percent of the short-line railroad miles that were operated in Texas that year had already been upgraded, nine percent would not need an upgrade, and 47 percent needed upgrading if they wanted to transport any type of 286,000-pound shipments.\42\ In addition, the results of a 1998-1999 survey conducted by the ASLRRA indicated that 41 percent of respondent short-line railroads could handle 286,000-pound rail cars and 87 percent of the respondent short-line railroads indicated that they would need to accommodate 286,000-pound railcars in the future.\43\ More current data from the
Hazardous Materials: Improving the Safety of Railroad Tank Car Transportation of Hazardous Materials
Jeffrey E. Warner & Manuel Solari Terra, “Assessment of Texas Short Line Railroads, “ Texas Transportation Institute (Nov. 15, 2005).
These connections have previously mandated upgrading to 286,000-pound capability. For example, in 2005, the Texas Transportation Institute reported that 42 percent of the short-line railroad miles that were operated in Texas that year had already been upgraded, nine percent would not need an upgrade, and 47 percent needed upgrading if they wanted to transport any type of 286,000-pound shipments.\58\ In addition, the results of a 1998-1999 survey conducted by the ASLRRA indicated that 41 percent of respondent short-line railroads could handle 286,000-pound rail cars and 87 percent of the respondent short-line railroads indicated that they would need to accommodate 286,000-pound railcars in the future.\59\ More current data from the ASLRRA suggests that many of the railroads needing future capability to handle 286,000-pound rail loads for this rule have been upgraded within the past two years.\60\ --------------------------------------------------------------------------- ---------------