Policy Replication

A safety and regulatory assessment of generic BWR and PWR permanently shutdown nuclear power plants

Nuclear Regulatory Commission, Washington, DC (United States), R Travis, Nuclear Regulatory Commission, Washington, DC (United States), Brookhaven National Lab., Upton, NY (USA), R Davis, E Grove, Mohamed A. Azarm
1997 · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · report · doi:10.2172/510336 · 13 scholarly citations

A free copy is available at the open-access link. Its license does not let us host the file here.

Cited in 1 place in policy documents

Preliminary Draft Regulatory Analysis for Regulatory Basis: Regulatory Improvements for Decommissioning

Regulatory impact analysis2017-05-04 · NRC · References, ref. 46
NUREG/CR-6451, “A Safety and Regulatory Assessment of Generic BWR and PWR Permanently Shutdown Nuclear Power Plants,” ADAM Accession No. ML082260098.