Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity
Open-access copyPublisher page (DOI)OpenAlex record
Cited in 1 place in policy documents
Standards of Performance for Greenhouse Gas Emissions From New, Modified, and Reconstructed Stationary Sources: Electric Utility Generating Units
Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity; Revision 2a, pp. 57-74.
See, for example, the detailed description of the following systems projected to be needed for a new supercritical PC boiler to capture CO2: Coal and sorbent receiving and storage, steam generator and ancillaries, NOX control system, particulate control, flue gas desulfurization, flue gas system, CO2 recovery facility, steam turbine generator system, balance of plant, and accessory electric plant, and instrumentation and control systems.\244\ --------------------------------------------------------------------------- ---------------------------------------------------------------------------