Supporting information 1 of Methane Emissions from the Natural Gas Transmission and Storage System in the United States

2026 · supplementary-materials · doi:10.1021/acs.est.5b01669.s001 · 0 scholarly citations

Cited in 3 places in policy documents

FRM - New Documents and Materials Referenced in the Preamble and TSD

Regulatory impact analysis2025-08-26 · EPA · Natural Gas Systems (p. 10-21)
Zimmerle et al. (2015) "Methane Emissions from the Natural Gas Transmission and Storage System in the United States." Environmental Science and Technology, Vol. 49 9374-9383.

FRM - New Documents and Materials Referenced in the Preamble and TSD

Regulatory impact analysis2025-08-26 · EPA · 10. References and Abbreviations (Natural Gas Systems)
Zimmerle et al. (2015) "Methane Emissions from the Natural Gas Transmission and Storage System in the United States." Environmental Science and Technology, Vol. 49 9374-9383

Pipeline Safety: Gas Pipeline Leak Detection and Repair

Federal Register2023-05-18 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · fn 100
Zimmerle et al., "Methane Emissions from the Natural Gas Transmission and Storage System in the United States," 49 Environmental Science & Technology 9374 (July 21, 2015).
The emissions factor is derived from the frequency of leak repairs reported on operators' annual reports to RSPA and self-reported leak measurements from distribution mains, both collected in 1991.\99\ The authors of one study noted that the difficulty in accurately measuring abnormal ``super-emitter'' events from natural gas transmission and storage facilities using on-site measurements suggests that bottom-up methodologies underestimate emissions from ``super-emitter'' events, and consequently total emissions.\100\ For example, the 1996 GRI/EPA Report relied on limited RSPA incident report data which did not even include a volumetric incident definition criterion as used under current PHMSA reporting requirements.\101\ The RSPA incident report form in 1991 similarly did not require operators to provide an estimate of release volume.