Policy Replication

Method for estimating escalation and interest during construction (EDC and IDC)

D Phung
1978 · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · report · doi:10.2172/6765917 · 6 scholarly citations

A free copy is available at the open-access link. Its license does not let us host the file here.

Cited in 1 place in policy documents

Regulatory analysis technical evaluation handbook. Final report

Regulatory impact analysis1997-01-01 · Nuclear Regulatory Commission, Washington, DC (United States) · References p. 6.6
Phung, D. 1978. A Method for Estimating Escalation and Interest During Construction (EDC and IDC). ORAU IEA-78-7(M)