Policy Replication

Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation

Matt Oakes, USDOE Office of Fossil Energy (FE), Jacob Konrade, Mark Bleckinger, Marc Turner, Sydney Hughes, Hannah Hoffman, Travis R. Shultz, ERIC J. LEWIS
2023 · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · report · doi:10.2172/1973266 · 10 scholarly citations

A free copy is available at the open-access link. Its license does not let us host the file here.

Cited in 8 places in policy documents

New Source Performance Standards Review for Stationary Combustion Turbines and Stationary Gas Turbines

Federal Register2026-01-15 · ENVIRONMENTAL PROTECTION AGENCY · fn 202
Oakes, M.; Konrade, J.; Bleckinger, M.; Turner, M.; Hughes, S.; Hoffman, H.; Shultz, T.; and Lewis, E. (May 5, 2023). Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation. U.S. Department of Energy (DOE). Office of Scientific and Technical Information (OSTI). Available at https://www.osti.gov/biblio/1973266.

NOx Control Costing TSD Jan 2026

Regulatory impact analysis2026-01-15 · EPA · Title page
Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation, DOE/NETL-2023/3855, May 5, 2023

Combustion Turbines SCR Costing TSD

Regulatory impact analysis2024-12-17 · EPA · Front matter, Suggested Citation
Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation, DOE/NETL-2023/3855, May 5, 2023

Review of New Source Performance Standards for Stationary Combustion Turbines and Stationary Gas Turbines

Federal Register2024-12-13 · ENVIRONMENTAL PROTECTION AGENCY · fn 104
Oakes, M.; Konrade, J.; Bleckinger, M.; Turner, M.; Hughes, S.; Hoffman, H.; Shultz, T.; and Lewis, E. (May 5, 2023). Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation.
These capital and increased operating costs were estimated based on model plants from the DOE NETL flexible generation report.\104\ For the analysis period 2025-2032, the present value of the expected costs of the proposed rule is approximately $166 million (2023$), while the equivalent annualized value of the costs over the analysis period is $22.6 million (2023$). --------------------------------------------------------------------------- ---------------------------------------------------------------------------

Review of New Source Performance Standards for Stationary Combustion Turbines and Stationary Gas Turbines

Federal Register2024-12-13 · ENVIRONMENTAL PROTECTION AGENCY · fn 38
Oakes, M.; Konrade, J.; Bleckinger, M.; Turner, M.; Hughes, S.; Hoffman, H.; Shultz, T.; and Lewis, E. (May 5, 2023). Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation. U.S. Department of Energy (DOE). Office of Scientific and Technical Information (OSTI). Available at https://www.osti.gov/biblio/1973266.
Department of Energy's (DOE) NETL flexible generation report.\38\ The NETL report includes detailed costing information on aeroderivative simple cycle turbines using hot SCR and frame combined cycle turbines using conventional SCR.

RIA Combustion Turbines NSPS Proposal 2024

Regulatory impact analysis2024-12-13 · EPA · Section 3.3
NETL. (2023). Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation. DOE/NETL-2023/3855.

New Source Performance Standards for Greenhouse Gas Emissions From New, Modified, and Reconstructed Fossil Fuel-Fired Electric Generating Units; Emission Guidelines for Greenhouse Gas Emissions From Existing Fossil Fuel-Fired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule

Federal Register2024-05-09 · ENVIRONMENTAL PROTECTION AGENCY · fn 742
"Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation." DOE/NETL-2023/3855. May 5, 2023.
According to the NETL Baseline Flexible Operation Report, while the design efficiencies are the same, the capital costs of fast-start combined cycle turbines are 1.6 percent higher than a comparable conventional start combined cycle facility.\742\ The additional costs include design parameters that significantly reduce start times.

New Source Performance Standards Review for Stationary Combustion Turbines, Proposal

Regulatory impact analysis2024-01-01 · EPA · Section 3.3
NETL. (2023). Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation. U.S. Department of Energy, National Energy Technology Laboratory, Pittsburgh, PA. DOE/NETL-2023/3855.