Policy Replication

THE LAW AND ECONOMICS OF TRANSMISSION PLANNING AND COST ALLOCATION

Joshua C. Macey, Jacob Mays
2024 · SSRN Electronic Journal · preprint · doi:10.2139/ssrn.5018777 · 6 scholarly citations

A free copy is available at the open-access link. Its license does not let us host the file here.

Cited in 1 place in policy documents

Overview of Electric Transmission

CBO2026-08-27 · CBO · Slide 21
Macey, Joshua, and Jacob Mays. 2024. The Law and Economics of Transmission Planning and Cost Allocation, Energy Law Journal, vol. 45 no. 2, pp. 209–249, https://dx.doi.org/10.2139/ssrn.5018777.
Federal Elements Cost allocation is the process by which costs of a transmission line are assigned to the entities responsible for paying for it. The state PUC (or similar) reviews proposed transmission investments. If a project is deemed necessary, costs are allocated to the utility's customers in rate hearings. Scope of cost allocation differs between regulated and deregulated states. Some states have right of first refusal (ROFR) laws; the utility must decline to build a transmission line before any other entity can build it. FERC cost causation principle: Costs are allocated proportionally to benefits. No standardized method; grid operators and states can define their own approach (Macey and Mays 2024).