Carbon Capture and Storage in the United States
Ahmed Abdulla and others, “Explaining Successful and Failed Investments in U.S. Carbon Capture and Storage Using Empirical and Expert Assessments,” Environmental Research Letters, vol. 16, no. 1 (January 2021), https://tinyurl.com/yrb4e7rb
That "energy penalty" can require a plant to increase its electricity production by anywhere from about one-sixth to almost one-third of what it would produce without using CCS.6 High capital costs, along with cost overruns, were among the factors that contributed to the cancellation of CCS demonstration projects that received large federal subsidies under 2009 legislation (as described in Chapter 2) and other CCS projects in the United States.7 Installing CCS in existing power plants ("retrofitting") can be more costly than incorporating CCS into the design and construction of a new plant.