Transmission Impossible? Prospects for Decarbonizing the US Grid
Open-access copyPublisher page (DOI)OpenAlex record
Cited in 3 places in policy documents
Overview of Electric Transmission
Davis, Lucas W., Catherine Hausman, and Nancy L. Rose. 2023. Transmission Impossible? Prospects for Decarbonizing the US Grid, Journal of Economic Perspectives, vol. 37 no. 4, pp. 155–180, https://dx.doi.org/10.1257/jep.37.4.155.
Growth of Transmission Might Lag Demand Growth Recent studies conclude that significant growth in new transmission capacity will be necessary to meet higher levels of future electricity demand. National Transmission Planning Study (DOE 2024): 2.1-2.6 times 2020 levels by 2050 (average growth of 2.5-3.2 percent per year) However, annual transmission growth in recent years has averaged 0.6 percent. Some researchers posit that regulatory constraints are reducing the buildout of new transmission lines (Davis, Hausman, and Rose 2023; DeLosa, Pfeifenberger, and Joskow 2024; Hausman 2025).
Chapter 5: Achieving a Net Zero Carbon Dioxide Emissions Economy in the United States
Davis, L. W., C. Hausman, and N. L. Rose. 2023. “Transmission Impossible? Prospects for Decarbonizing the US Grid.” Journal of Economic Perspectives 37, no. 4 (Fall): 155–80. https://pubs.aeaweb.org/doi/pdfplus/10.1257/jep.37.4.155.
How CBO Uses the ReEDS Model to Analyze Policies in the Electric Power Sector: Working Paper 2024-02
Lucas W. Davis and others, “Transmission Impossible? Prospects for Decarbonizing the U.S. Grid,” Journal of Economic Perspectives vol. 37, no. 4 (Fall 2023), pp. 155–180, http://dx.doi.org/10.1257/jep.37.4.155.