Quality Management of Pavement Condition Data Collection
Publisher page (DOI)OpenAlex record
Cited in 5 places in policy documents
PM2 Regulatory Impact Analysis FINAL (Final Rule)
NCHRP Synthesis 401, Quality Management of Pavement Condition Data (2009)
National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program
NCHRP Study 401 "Quality Management of Pavement Condition Data Collection 2009."
The FHWA has found through documented research \49\ that nearly all State DOTs currently use more than IRI in their pavement management programs.
National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program
NCHRP (2009) Quality Management of Pavement Condition Data Collection, NCHRP Synthesis 401.
National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program
Flintsch G., McGhee K., NCHRP Synthesis 401, "Quality Management of Pavement Condition Data Collection", 2009.
A survey conducted as part of the 2009 National Cooperative Highway Research Program (NCHRP) Synthesis 401 study \38\ revealed that 98 percent of State DOTs collect distress data (e.g., faulting, cracking) and 95 percent collect roughness data to monitor network level pavement conditions.
PM2 Regulatory Impact Analysis FINAL (NPRM)
NCHRP Synthesis 401, Quality Management of Pavement Condition Data (2009)