Production forgone: An alternative method for assessing the consequences of fish entrainment and impingement losses at power plants and other water intakes
Publisher page (DOI)OpenAlex record
Cited in 1 place in policy documents
National Pollutant Discharge Elimination System-Final Regulations To Establish Requirements for Cooling Water Intake Structures at Existing Facilities and Amend Requirements at Phase I Facilities
Rago, P.J. 1984. Production forgone: An alternative method for assessing the consequences of fish entrainment and impingement losses at power plants and other water intakes. Ecological Modeling, 24(1-2): 79-111.
Biomass production forgone--biomass that would have been produced had individuals not been impinged or entrained,\146\ calculated for all species from species- and age-specific growth rates and survival probabilities.