Policy Replication

A new overhead estimation methodology: A case study in an electrical engineering company

Adnan Niazi, Jian S. Dai, Stavroula Balabani, Lakmal D. Seneviratne
2007 · Proceedings of the Institution of Mechanical Engineers Part B Journal of Engineering Manufacture · article · doi:10.1243/09544054jem681 · 11 scholarly citations

Cited in 6 places in policy documents

Heavy Duty Truck Retail Price Equivalent and Indirect Cost Multipliers Draft Report July 2010

Docket document2023-04-13 · EPA · refsec
Niazi, A., J. Dai, S. Balabani, and L. Seneviratne. 2007. “A New Overhead Estimation Methodology: A Case Study in an Electrical Engineering Company.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 221(4):699-710.

Correspondence between EPA and OMB during Interagency Review of the proposed rule titled, Control of Air Pollution from New Motor Vehicles: Heavy-Duty Engine and Vehicle Standards

Docket document2022-03-21 · EPA · refsec
Niazi, A., J. Dai, S. Balabani, and L. Seneviratne. 2007. “A New Overhead Estimation Methodology: A Case Study in an Electrical Engineering Company.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 221(4):699-710.

HD Truck IC Multiplier Revised Draft 7-28-10

Docket document2022-03-15 · EPA · refsec
Niazi, A., J. Dai, S. Balabani, and L. Seneviratne. 2007. “A New Overhead Estimation Methodology: A Case Study in an Electrical Engineering Company.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 221(4):699-710.

"Heavy Duty Truck Retail Price Equivalent and Indirect Cost Multipliers", Draft Report, July 2010

Docket document2016-07-27 · EPA · refsec
Niazi, A., J. Dai, S. Balabani, and L. Seneviratne. 2007. “A New Overhead Estimation Methodology: A Case Study in an Electrical Engineering Company.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 221(4):699-710.

Heavy Duty Truck Retail Price Equivalent and Indirect Cost Multipliers Draft Report July 2010 HD Truck IC Multiplier Revised Draft 7-28-10 RTI Project Number 0211577.003.002

Docket document2015-07-13 · EPA · refsec
Niazi, A., J. Dai, S. Balabani, and L. Seneviratne. 2007. “A New Overhead Estimation Methodology: A Case Study in an Electrical Engineering Company.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 221(4):699-710.

Heavy-duty Truck Retail Price Equivalent and Indirect Cost Multipliers

Docket document2012-01-31 · EPA · refsec
Niazi, A., J. Dai, S. Balabani, and L. Seneviratne. 2007. “A New Overhead Estimation Methodology: A Case Study in an Electrical Engineering Company.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 221(4):699-710.