{"document":{"doc_id":9939,"source":"ria","org":"BSEE","doc_type":"regulatory_impact_analysis","title":"BSEE BOP-Well Control NPRM RIA 04-09-14","date":"2015-04-17","url":"https://www.regulations.gov/document/BSEE-2015-0002-0002","source_native_id":"BSEE-2015-0002-0002","status":"fetched","abstract":null,"action":null},"dockets":["BSEE-2015-0002"],"rins":["RIN 1014-AA11"],"related":[{"doc_id":10837,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement","doc_type":"Proposed Rule","title":"Oil and Gas and Sulphur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control","date":"2015-04-17"},{"doc_id":10734,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement","doc_type":"Proposed Rule (administrative)","title":"Oil and Gas and Sulphur Operations on the Outer Continental Shelf-Blowout Preventer Systems and Well Control","date":"2015-06-03"},{"doc_id":9873,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement","doc_type":"Rule","title":"Oil and Gas and Sulfur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control","date":"2016-04-29"},{"doc_id":9936,"source":"ria","org":"BSEE","doc_type":"regulatory_impact_analysis","title":"AA11 RIA.BSEE Well Control RIA","date":"2016-05-09"},{"doc_id":392255,"source":"docket_item","org":"BSEE","doc_type":"other","title":"AA11 EA with signed FONSI (4-12-16)","date":"2016-05-09"}],"references":[{"citation_id":131270,"raw_reference":"Ramseur, J.L., Hagerty, C.L. 2014. \"Deepwater Horizon Oil Spill: Recent Activities and Ongoing Developments,\" Congressional Research Office. Available at: http://www.fas.org/sgp/crs/misc/R42942.pdf.","cited_authors":"Ramseur, J.L.; Hagerty, C.L.","cited_year":"2014","cited_title":"Deepwater Horizon Oil Spill: Recent Activities and Ongoing Developments","cited_venue":"Congressional Research Office","cited_doi":null,"cited_url":"http://www.fas.org/sgp/crs/misc/R42942.pdf","ref_kind":"research_report","section":"fn 1","page":null,"context_sentence":null,"paper_id":71684,"paper_title":"Deepwater Horizon Oil Spill: Recent Activities and Ongoing Developments","paper_year":2013,"paper_doi":null},{"citation_id":131271,"raw_reference":"\"Blowout Preventer (BOP) Failure Event and Maintenance, Inspection and Test (MIT) Data Analysis for the Bureau of Safety and Environmental Enforcement (BSEE),\" American Bureau of Shipping and ABSG Consulting Inc., (under BSEE contract M11PC00027), June 2013","cited_authors":"American Bureau of Shipping; ABSG Consulting Inc.","cited_year":"2013","cited_title":"Blowout Preventer (BOP) Failure Event and Maintenance, Inspection and Test (MIT) Data Analysis for the Bureau of Safety and Environmental Enforcement (BSEE)","cited_venue":"American Bureau of Shipping and ABSG Consulting Inc.","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 42","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":131272,"raw_reference":"\"Improved Regulatory Oversight Using Real-Time Data Monitoring Technologies in the Wake of Macondo,\" K. Carter, U. of Texas at Austin, 2014, published with E. van Oort and A. Barendrecht, Soc'y of Petroleum Engineers, 2014","cited_authors":"K. Carter; E. van Oort; A. Barendrecht","cited_year":"2014","cited_title":"Improved Regulatory Oversight Using Real-Time Data Monitoring Technologies in the Wake of Macondo","cited_venue":"Society of Petroleum Engineers","cited_doi":"10.2118/170323-ms","cited_url":null,"ref_kind":"conference_paper","section":"fn 42","page":null,"context_sentence":null,"paper_id":15095,"paper_title":"Improved Regulatory Oversight Using Real-Time Data Monitoring Technologies in the Wake of Macondo","paper_year":2014,"paper_doi":"10.2118/170323-ms"},{"citation_id":131273,"raw_reference":"\"Deepwater Horizon Blowout Preventer Failure Analysis Report to the U.S. Chemical Safety and Hazard Investigation Board,\" Engineering Services, LP, 2014","cited_authors":"Engineering Services, LP","cited_year":"2014","cited_title":"Deepwater Horizon Blowout Preventer Failure Analysis Report to the U.S. Chemical Safety and Hazard Investigation Board","cited_venue":"U.S. Chemical Safety and Hazard Investigation Board","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 42","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":131274,"raw_reference":"\"Economic Analysis Methodology for the Five Year OCS Oil and Gas Leasing Program for 2012-2017\" (the \"BOEM Case Study\"), U.S. Department of the Interior, Bureau of Ocean Energy Management (2012)","cited_authors":"U.S. Department of the Interior, Bureau of Ocean Energy Management","cited_year":"2012","cited_title":"Economic Analysis Methodology for the Five Year OCS Oil and Gas Leasing Program for 2012-2017","cited_venue":"Bureau of Ocean Energy Management","cited_doi":null,"cited_url":"http://www.boem.gov/uploadedFiles/BOEM/Oil_and_Gas_Energy_Program/Leasing/Five_Year_Program/20122017_Five_Year_Program/PFP%20EconMethodology.pdf","ref_kind":"research_report","section":"Section 7.b.i (Benefits Data/Methods)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":131275,"raw_reference":"U.S. Nuclear Regulatory Commission, \"Probabilistic Risk Assessment (PRA),\" July 17, 2013, available at http://tinyurl.com/mefe7om","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2013","cited_title":"Probabilistic Risk Assessment (PRA)","cited_venue":"U.S. Nuclear Regulatory Commission","cited_doi":null,"cited_url":"http://tinyurl.com/mefe7om","ref_kind":"web_page","section":"fn 50","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":131276,"raw_reference":"National Offshore Petroleum Safety and Environmental Management Authority, \"Guidance Note: Hazardous Identification, N-04300-GN0107, Revision 5\" (2012)","cited_authors":"National Offshore Petroleum Safety and Environmental Management Authority","cited_year":"2012","cited_title":"Guidance Note: Hazardous Identification, N-04300-GN0107, Revision 5","cited_venue":"NOPSEMA","cited_doi":null,"cited_url":"http://www.nopsema.gov.au/assets/Guidance-notes/N-04300-GN0107-Hazard-Identification.pdf","ref_kind":"research_report","section":"fn 50","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":131277,"raw_reference":"\"Optimising Hazard Management by Workforce Engagement and Supervision,\" V. Trbojevic, Health and Safety Executive, United Kingdom Government (2008)","cited_authors":"V. Trbojevic","cited_year":"2008","cited_title":"Optimising Hazard Management by Workforce Engagement and Supervision","cited_venue":"Health and Safety Executive, United Kingdom Government","cited_doi":null,"cited_url":"http://www.hse.gov.uk/research/rrpdf/rr637.pdf","ref_kind":"research_report","section":"fn 50","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}