{"document":{"doc_id":9906,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-04-08","url":"https://www.federalregister.gov/documents/2016/04/08/2016-06382/pipeline-safety-safety-of-gas-transmission-and-gathering-pipelines","source_native_id":"2016-06382","status":"fetched","abstract":"This Notice of Proposed Rulemaking (NPRM) proposes to revise the Pipeline Safety Regulations applicable to the safety of onshore gas transmission and gathering pipelines. PHMSA proposes changes to the integrity management (IM) requirements and proposes changes to address issues related to non-IM requirements. This NPRM also proposes modifying the regulation of onshore gas gathering lines.","action":"Notice of proposed rulemaking."},"dockets":["PHMSA-2011-0023"],"rins":["RIN 2137-AE72"],"related":[{"doc_id":13699,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-08-25"},{"doc_id":13463,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-11-16"},{"doc_id":9842,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-05-13"},{"doc_id":7498,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments","date":"2019-10-01"},{"doc_id":7191,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Gas Transmission Regulatory Impact Analysis","date":"2019-10-02"},{"doc_id":129370,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"},{"doc_id":6917,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","date":"2020-07-06"},{"doc_id":7188,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final RIA/RFA: Safety of Gas Gathering Pipelines","date":"2021-11-14"},{"doc_id":7204,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final Regulatory Impact Analysis (RIA)","date":"2022-08-26"},{"doc_id":128438,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Final Rule Draft -Redline Comparison Document","date":"2022-08-26"},{"doc_id":7209,"source":"ria","org":"PHMSA","doc_type":"regulatory_flexibility_analysis","title":"2137 AF39 Final Regulatory Flexibility Analysis RIN 2","date":"2023-09-15"},{"doc_id":7214,"source":"ria","org":"PHMSA","doc_type":"benefit_cost_analysis","title":"EPA. Whitepaper on Valuing Methane Emissions Changes in Regulatory Benefit Cost Analysis Peer Review Charge Questions and Responses","date":"2023-09-15"},{"doc_id":7219,"source":"ria","org":"PHMSA","doc_type":"regulatory_analysis","title":"Jack Faucett Assoc. Application of Safety Regulation to Rural Onshore Hazardous Liquid Low Stress Pipelines Vlume II Regulatory Analysis May 11 2010","date":"2023-09-15"},{"doc_id":7224,"source":"ria","org":"PHMSA","doc_type":"economic_analysis","title":"U.S. Department of Transportation Departmental Guidance on Valuation of a Statistical Life in Economic Analysis","date":"2023-09-15"},{"doc_id":2907,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments; Correction","date":"2026-04-24"}],"references":[{"citation_id":56778,"raw_reference":"Battelle's Experience with ERW and Flash Welding Seam Failures: Causes and Implications (Task 1.4)","cited_authors":"Battelle Memorial Institute","cited_year":null,"cited_title":"Battelle's Experience with ERW and Flash Welding Seam Failures: Causes and Implications","cited_venue":"Battelle Memorial Institute","cited_doi":null,"cited_url":"http://www.battelle.org/","ref_kind":"research_report","section":"192.7(l)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":56779,"raw_reference":"Battelle Memorial Institute, \"Models for Predicting Failure Stress Levels for Defects Affecting ERW and Flash-Welded Seams\" (Subtask 2.4)","cited_authors":"Battelle Memorial Institute","cited_year":null,"cited_title":"Models for Predicting Failure Stress Levels for Defects Affecting ERW and Flash-Welded Seams","cited_venue":"Battelle Memorial Institute","cited_doi":null,"cited_url":"http://www.battelle.org/","ref_kind":"research_report","section":"192.7(l)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":56780,"raw_reference":"Battelle Final Report No. 13-021, \"Predicting Times to Failures for ERW Seam Defects that Grow by Pressure Cycle Induced Fatigue (Subtask 2.5)","cited_authors":"Battelle Memorial Institute","cited_year":null,"cited_title":"Predicting Times to Failures for ERW Seam Defects that Grow by Pressure Cycle Induced Fatigue","cited_venue":"Battelle Memorial Institute","cited_doi":null,"cited_url":"http://www.battelle.org/","ref_kind":"research_report","section":"192.7(l)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":56781,"raw_reference":"Battelle Memorial Institute, \"Final Summary Report and recommendations for the Comprehensive Study to Understand Longitudinal ERW Seam Failures—Phase 1\" (Task 4.5)","cited_authors":"Battelle Memorial Institute","cited_year":null,"cited_title":"Final Summary Report and recommendations for the Comprehensive Study to Understand Longitudinal ERW Seam Failures—Phase 1","cited_venue":"Battelle Memorial Institute","cited_doi":null,"cited_url":"http://www.battelle.org/","ref_kind":"research_report","section":"192.7(l)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59439,"raw_reference":"API STD 1163-2005","cited_authors":null,"cited_year":"2005","cited_title":null,"cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Response to Question G.5","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59440,"raw_reference":"NACE SP0102-2010","cited_authors":"NACE International","cited_year":"2010","cited_title":null,"cited_venue":"NACE International","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Response to Question G.5","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59441,"raw_reference":"ANSI/ASNT ILI-PQ-2010","cited_authors":"ASNT","cited_year":"2010","cited_title":null,"cited_venue":"American Society for Nondestructive Testing","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Response to Question G.5","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59442,"raw_reference":"NACE SP0206-2006","cited_authors":"NACE International","cited_year":"2006","cited_title":null,"cited_venue":"NACE International","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Response to Question G.6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59443,"raw_reference":"NACE SP0204-2008 (formerly RP0204), \"Stress Corrosion Cracking Direct Assessment Methodology\"","cited_authors":"NACE International","cited_year":"2008","cited_title":"Stress Corrosion Cracking Direct Assessment Methodology","cited_venue":"NACE International","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Response to Question G.7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59444,"raw_reference":"ASME/ANSI B31.8S","cited_authors":"ASME","cited_year":"2004","cited_title":"Managing System Integrity of Gas Pipelines","cited_venue":"American Society of Mechanical Engineers","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section G.5 response","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59445,"raw_reference":"Remotely Controlled Valves on Interstate Natural Gas Pipelines, (Feasibility Determination Mandated by the Accountable Pipeline Safety and Partnership Act of 1996), September 1999","cited_authors":"U.S. Department of Transportation","cited_year":"1999","cited_title":"Remotely Controlled Valves on Interstate Natural Gas Pipelines","cited_venue":"DOT","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"H.General Comments item 11","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59446,"raw_reference":"National Transportation Safety Board, \"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey, March 23, 1994,\" PB95-916501, NTSB/PAR-95/01, January 18, 1995","cited_authors":"National Transportation Safety Board","cited_year":"1995","cited_title":"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey, March 23, 1994","cited_venue":"NTSB","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"H footnote 37","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59447,"raw_reference":"NACE SP0502","cited_authors":"NACE International","cited_year":null,"cited_title":null,"cited_venue":"NACE International","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Response to Question I.2 comments","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59448,"raw_reference":"ALN-88-01, January 28, 1988","cited_authors":"Office of Pipeline Safety","cited_year":"1988","cited_title":"Alert Notice ALN-88-01","cited_venue":"PHMSA","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Topic J","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59449,"raw_reference":"ALN-89-01, March 8, 1989","cited_authors":"Office of Pipeline Safety","cited_year":"1989","cited_title":"Alert Notice ALN-89-01","cited_venue":"PHMSA","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Topic J","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":59450,"raw_reference":"Kiefner technical paper on pressure test to 1.25 times MAOP","cited_authors":"Kiefner","cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section G.9 comments item 11","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":62923,"raw_reference":"Accufacts, \"Dent Study Technical Report\"","cited_authors":"Baker and Kiefner & Associates","cited_year":"2004","cited_title":"Dent Study Technical Report","cited_venue":"OPS TTO Number 10","cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/gasimp/techreports.htm","ref_kind":"research_report","section":"fn 35","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":62924,"raw_reference":"INGAA paper \"Anomaly Response and Mitigation Outside of High Consequence Areas when Using in Line Inspection,\" dated May 30, 2010","cited_authors":"INGAA","cited_year":"2010","cited_title":"Anomaly Response and Mitigation Outside of High Consequence Areas when Using in Line Inspection","cited_venue":"Interstate Natural Gas Association of America","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"C. Modifying Repair Criteria, General Comments for Topic C, item 2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":63039,"raw_reference":"U.S. Department of Energy, “Appendix B: Natural Gas,” Quadrennial Energy Review Report: Energy Transmission, Storage, and Distribution Infrastructure, p. NG-28, April 2015.","cited_authors":"U.S. Department of Energy","cited_year":"2015","cited_title":"Appendix B: Natural Gas","cited_venue":"Quadrennial Energy Review Report: Energy Transmission, Storage, and Distribution Infrastructure","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":63040,"raw_reference":"National Transportation Safety Board, “Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, California; September 9, 2010,” Pipeline Accident Report NTSB/PAR-11-01, Page 96, 2011.","cited_authors":"National Transportation Safety Board","cited_year":"2011","cited_title":"Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, California; September 9, 2010","cited_venue":"NTSB/PAR-11-01","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 25","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":63041,"raw_reference":"National Transportation Safety Board, “Safety Study: Integrity Management of Gas Transmission Pipelines in High Consequence Areas,” NTSB SS-15/01, January 27, 2015.","cited_authors":"National Transportation Safety Board","cited_year":"2015","cited_title":"Safety Study: Integrity Management of Gas Transmission Pipelines in High Consequence Areas","cited_venue":"NTSB SS-15/01","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 32","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":63042,"raw_reference":"Energy Information Administration, Natural Gas Spot and Futures Prices, http://www.eia.gov/dnav/ng/ng_pri_fut_s1_m.htm, retrieved 14 October 2015.","cited_authors":"Energy Information Administration","cited_year":"2015","cited_title":"Natural Gas Spot and Futures Prices","cited_venue":"U.S. Energy Information Administration","cited_doi":null,"cited_url":"http://www.eia.gov/dnav/ng/ng_pri_fut_s1_m.htm","ref_kind":"dataset","section":"fn 15","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":63043,"raw_reference":"PHMSA, Pipeline Incident 20-Year Trends, http://www.phmsa.dot.gov/pipeline/library/data-stats/pipelineincidenttrends.","cited_authors":"PHMSA","cited_year":null,"cited_title":"Pipeline Incident 20-Year Trends","cited_venue":"PHMSA","cited_doi":null,"cited_url":"http://www.phmsa.dot.gov/pipeline/library/data-stats/pipelineincidenttrends","ref_kind":"dataset","section":"fn 23","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":63044,"raw_reference":"Letter from Terry D. Boss, Senior Vice President of Environment, Safety and Operations to Mike Israni, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, dated January 20, 2012, “Safety of Gas Transmission Pipelines, Docket No. PHMSA-2011-0023.”","cited_authors":"Terry D. Boss","cited_year":"2012","cited_title":"Safety of Gas Transmission Pipelines, Docket No. PHMSA-2011-0023","cited_venue":"Interstate Natural Gas Association of America","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"fn 33","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":63133,"raw_reference":"Battelle's Experience with ERW and Flash Weld Seam Failures: Causes and Implications (Task 1.4)","cited_authors":"Battelle","cited_year":null,"cited_title":"Battelle's Experience with ERW and Flash Weld Seam Failures: Causes and Implications","cited_venue":"Battelle","cited_doi":null,"cited_url":"https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"research_report","section":"Section 192.619 (Maximum allowable operating pressure: Steel or plastic pipelines)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":63134,"raw_reference":"Interstate Natural Gas Association of America/American Gas Association Final Report No. 13-180, \"Leak vs. Rupture Thresholds for Material and Construction Anomalies,\" December 2013","cited_authors":"Interstate Natural Gas Association of America; American Gas Association","cited_year":"2013","cited_title":"Leak vs. Rupture Thresholds for Material and Construction Anomalies","cited_venue":"INGAA/AGA Final Report No. 13-180","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 192.624 (Maximum allowable operating pressure verification)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":63135,"raw_reference":"Numerical Modeling and Validation for Determination of the Leak/Rupture Boundary for Low-Stress Pipelines, Kiefner & Associates, Inc., 2010, performed under contract to the Gas Technology Institute","cited_authors":"Kiefner & Associates, Inc.","cited_year":"2010","cited_title":"Numerical Modeling and Validation for Determination of the Leak/Rupture Boundary for Low-Stress Pipelines","cited_venue":"Gas Technology Institute","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 192.624 (Maximum allowable operating pressure verification)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":63136,"raw_reference":"Battelle Final Report No. 13-021, \"Predicting Times to Failures for ERW Seam Defects that Grow by Pressure Cycle Induced Fatigue (Subtask 2.5).\"","cited_authors":"Battelle","cited_year":null,"cited_title":"Predicting Times to Failures for ERW Seam Defects that Grow by Pressure Cycle Induced Fatigue","cited_venue":"Battelle Final Report No. 13-021","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section VI. Availability of Standards Incorporated by Reference","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}