Oil and Gas and Sulfur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control
Federal Register2016-04-29 · DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement · Rule · 2016-08921
Final rule.
Bureau of Safety and Environmental Enforcement (BSEE) is finalizing new regulations to consolidate into one part the equipment and operational requirements that are found in various subparts of BSEE's regulations pertaining to offshore oil and gas drilling, completions, workovers, and decommissioning. This final rule focuses on blowout preventer (BOP) and well-control requirements, including incorporation of industry standards and revision of existing regulations, and adopts reforms in the areas of well design, well control, casing, cementing, real-time well monitoring, and subsea containment. The final rule also addresses and implements multiple recommendations resulting from various investigations of the Deepwater Horizon incident. This final rule will also incorporate guidance from several Notices to Lessees and Operators (NTLs) and revise provisions related to drilling, workover, completion, and decommissioning operations to enhance safety and environmental protection.
Original sourceXML (1.1 MB)PDF (2.7 MB)
Other documents for the same rulemaking (all, by stage)
References: 10 extracted, 2 linked to papers
Page 1Download these results: CSV · JSON
Blowout Preventer (BOP) Failure Event and Maintenance, Inspection and Test (MIT) Data Analysis for the Bureau of Safety and Environmental Enforcement (BSEE)." American Bureau of Shipping and ABSG Consulting Inc., (under BSEE contract M11PC000027), June 2013
research reportNot linked to a paper · fn 27
"Improved Regulatory Oversight Using Real-Time Data Monitoring Technologies in the Wake of Macondo," K. Carter, U, of Texas at Austin, 2014, published with E. van Oort and A Barendrecht, Society of Petroleum Engineers, 2014
In order not to overstate the potential risk reduction, we assumed a 1 percent risk reduction in the likelihood of all oil spills.\27\ We multiplied the expected annual number of spilled barrels of oil (based on the observed average of spilled oil per well) by 1 percent to estimate the expected annual reduction in barrels of oil spilled associated with the rule. --------------------------------------------------------------------------- ---------------------------------------------------------------------------
"Deepwater Horizon Blowout Preventer Failure Analysis Report to the U.S. Chemical Safety and Hazard Investigation Board," Engineering Services, LP, 2014
research reportNot linked to a paper · fn 27
U.S. Department of the Interior, BOEM, 2012, Economic Analysis Methodology for the Five Year OCS Oil and Gas Leading Program for 2012-2017. BOEM OCS Study 2012-022.
research reportNot linked to a paper · fn 28
Ramseur, J.L., Hagerty, C.L. 2014. "Deepwater Horizon Oil Spill: Recent Activities and Ongoing Developments," Congressional Research Office.
As was evidenced by the Deepwater Horizon incident (which began with a blowout at the Macondo well on April 20, 2010), blowouts can result in catastrophic consequences.\31\ The Federal government and industry conducted multiple investigations to determine the causes of the Deepwater Horizon incident; many of these investigations identified BOP performance as a concern.
Investigation of Loss of Well Control and Fire South Timbalier Area Block 220, Well. No. A-3 OCS-G24980—23 July 2013 (July 2015)
Deepwater Horizon NRDA Trustees, Final Programmatic Damage Assessment and Restoration Plan and Final Programmatic Environmental Impact Statement, at p. 1-14-1-15
government reportNot linked to a paper · fn 3
American Petroleum Institute (API) Standard 53, Blowout Prevention Equipment Systems for Drilling Wells, Fourth Edition, November 2012
otherNot linked to a paper · Executive Summary
API Standard 53
otherNot linked to a paper · Blowout Preventer (BOP) System Requirements, § 250.730