Phase 2 of the Final Rule To Implement the 8-Hour Ozone National Ambient Air Quality Standard-Notice of Reconsideration
Federal Register2007-06-08 · ENVIRONMENTAL PROTECTION AGENCY · Rule · E7-11113
Final notice of reconsideration.
On December 19, 2006, EPA published, as a proposed rule, a notice of reconsideration for several aspects of the November 29, 2005, Phase 2 of the final rule to implement the 8-hour ozone national ambient air quality standard (NAAQS). These issues relate to nitrogen oxide (NO<INF>X</INF>) reasonably available control technology (RACT) for electric generating units (EGUs) in Clean Air Interstate Rule (CAIR) states and to certain new source review (NSR) provisions. The notice of reconsideration was published as a result of a petition for reconsideration which had been submitted by the Natural Resources Defense Council. In this action, EPA summarizes and responds to comments received in response to the notice of reconsideration, and EPA announces its final actions taken in response to these comments. As a result of this reconsideration process, EPA is changing the deadline for states in the CAIR region to submit EGU NO<INF>X</INF> RACT SIPs subpart 2 ozone nonattainment areas classified as moderate and above. EPA is also modifying its guidance on the issue of NO<INF>X</INF> RACT for EGUs in CAIR states.
Original sourceXML (198 KB)PDF (252 KB)
Other documents for the same rulemaking (all, by stage)
References: 9 extracted, 0 linked to papers
Page 1Download these results: CSV · JSON
Regulatory Impact Analysis for the Final Clean Air Interstate Rule, EPA-452/R-05-002, March 2005. http://www.epa.gov/interstateairquality/pdfs/finaltech08.pdf
Technical Support Document for Phase 2 of the Final Rule To Implement the 8-Hour Ozone National Ambient Air Quality Standard—Notice of Reconsideration; NOX RACT for EGUs in CAIR States—Supplemental Technical Analysis. (Docket ID No. EPA-HQ-OAQ-2003-0079, item 1044.2).
government reportNot linked to a paper · fn 4 / fn 10
"Boilermaker Labor Analysis and Installation Timing", March 2005. (Placed in CAIR docket EPA-HQ-OAR-2003-0053, document EPA-HQ-OAR-2003-0053-2092).
research reportNot linked to a paper · III.A.1 response to comment m
Technical Appendix: Potential Impacts of Implementation of the 8-Hour Ozone NAAQS; Technical Support Document. July 21, 2005. Docket Document EPA-HQ-OAR-2003-0079-0860.
government reportNot linked to a paper · fn 18
"Emissions Inventory Guidance for Implementation of Ozone and Particulate Matter National Ambient Air Quality Standards (NAAQS) and Regional Haze Regulations—Final." (URL: http://www.epa.gov/ttn/chief/eidocs/eiguid/index.html)
Emission Inventory Improvement Program, Volume X, Emission Projections, December 1999. Available at http://www.epa.gov/ttn/chief/eiip/techreport/.
"2002 Base Year Emission Inventory SIP Planning: 8-hr Ozone, PM2.5 and Regional Haze Programs," U.S. EPA, (November 18, 2002).
government reportNot linked to a paper · fn 17
EPA ICR #2236.01 (Information Collection Request for Phase 1 and Phase 2 Rules).
government reportNot linked to a paper · IV.B Paperwork Reduction Act
ICR 1230.17 (Information Collection Request for the NSR program; approved by OMB January 25, 2005).
government reportNot linked to a paper · IV.B Paperwork Reduction Act