Draft Economic Analysis of Critical Habitat for the Northern Spotted Owl
Other documents for the same rulemaking (all, by stage)
References: 82 extracted, 20 linked to papers
ODOT, Endangered Species Act Biological Assessment Guidance Manual. October 2005.
OMB, “Circular A-4,” September 17, 2003, available at http://www.whitehouse.gov/sites/default/files/omb/assets/omb/circulars/a004/a4.pdf. Operations & Maintenance Business Information Link (OMBIL) Regulatory Module version 2 (ORM2). Received from U.S. Army Corps of Engineers, Seattle District on April 3, 2012. Operations & Maintenance Business Information Link (OMBIL) Regulatory Module version 2 (ORM2), received from U.S. Army Corp of Engineers, Portland District on April 3, 2012. Oregon Department of Energy. Personal communication on March 12, 2012. Oregon Department of Forestry, State Forests Division. 2012. Northern Spotted Owl Operational Policies. Effective January 3. Oregon Department of Forestry. 2012. "Oregon Annual Timber Reports." Accessed at http://www.oregon.gov/ODF/STATE_FORESTS/FRP/annual_reports.shtml March 2012. Oregon Department of Forestry, Division 31, Log Export Rules, 629-031-0005 Oregon Office of Economic Analysis. 2012. Wood Products Productivity. January 26, 2012. Oregon Office of Economic Analysis: A Blog of Oregon Economic News and Analysis. Accessed at http://oregoneconomicanalysis.wordpress.com/2012/01/26/wood-productsproductivity-an-update/ on April 10, 2012.
Phillips, R.H. 2006. Jobs and income associated with resource and recreation outputs. P. 37-51 in Northwest Forest Plan: The first ten years (1994-2003): Socioeconomic monitoring results. Volume III: Rural communities and economies, Charnley, S. (tech. coord.). U.S. For. Serv. Gen. Tech. Rep. PNW-GTR-649, Pacific Northwest Res. Stn., Portland, OR. 206 p.
Power, Thomas M. "Public Timber Supply, Market Adjustments, and Local Economies: Economic Assumptions of the Northwest Forest Plan." Conservation Biology 20.2 (2006): 341-50. Draft Economic Analysis - May 29, 2012
Prestemon, Jeffrey and Robert Abt. “Chapter 13: Timber Products Supply and Demand.” Southern forest resource assessment. Wear, David, and John Greis, eds. 2002.
Ecological Economics (2009): 1535-1548. This paper updates a 1996 study on the same topic by Loomis and White (Loomis, John and D.S. White. Economic Benefits of Rare and Endangered Species: A Meta-Analysis.
Routman, K. 2007. Forest Communities and the Northwest Forest Plan: What Socioeconomic Monitoring Can Tell Us. Science Findings (95). Pacific Northwest Research Station, USDA Forest Service.
Rubin, J., G. Helfand, and J. Loomis. 1991. A Benefit-Cost Analysis of the Northern Spotted Owl: Results from a contingent valuation survey. Journal of Forestry. 25-30.
Schuler, Galen. Green Diamond Resources Company. Personal communication on March 5, 2012.
Spadaro, Jason. SDS Lumber. Personal communication on March 6, 2012.
Lindenmayer, and F. Swanson. 2011. The Forgotten Stage of Forest Succession: Early-Successional Ecosystems on Forest Sites, Frontiers in Ecology and the Environment 9: 117–125. U.S. Army Corps of Engineers, Portland District. Written communication on April 11, 2012. U.S. Army Corps of Engineers, Seattle District. Written communication on April 3, 2012. U.S. Census Bureau, CenStats, County Business Patterns, http://censtats.census.gov/, accessed March 2012. U.S. Department of Labor, Bureau of Labor Statistics, Employment & Unemployment, Local Area Unemployment Statistics. Accessed March 2012. Average unemployment 2010. U.S. Department of the Interior, Bureau of Land Management, Oregon & Washington State Office. Personal communication on April 9, 2012. Draft Economic Analysis - May 29, 2012 U.S. Environmental Protection Agency, Guidelines for Preparing Economic Analyses,
Land, http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5253425.pdf (Accessed 4/5/2012) U.S. Office of Management and Budget, “Circular A-4,” September 17, 2033, available at http://www.whitehouse.gov/omb/circulars/a004/a-4.pdf. U.S. Office of Management and Budget, February 7, 2011. “Regulatory Impact Analysis: Frequently Asked Questions (FAQs).” Accessed on May 3, 2011 by http://www.whitehouse.gov/sites/default/files/omb/circulars/a004/a-4_FAQ.pdf.
United States International Trade Commission. 2012. Interactive Tariff and Trade DataWeb. Accessed at dataweb.usitc.gov on March 19, 2012.
Warren, D. 2011. Production, Prices, Employment, and Trade in Northwest Forest
Industries, All Quarters 2010. USDA Forest Service. www.fs.fed.us/pnw/pubs/pnw_rb258.pdf Washington Administrative Code (WAC), Chapter 240-15, Log Export Restrictions Draft Economic Analysis - May 29, 2012 Washington State Department of Natural Resources. 1997. Final Habitat Conservation Plan. Olympia, WA. Washington State Department of Natural Resources. 2012. “Washington State Timber Harvest.” Accessed at http://www.dnr.wa.gov/BusinessPermits/Topics/EconomicReports/Pages/obe_washi ngton_timber_harvest_reports.aspx
Wienke, Ken. Boise Cascade. Personal communication on March 14, 2012.
WSDOT, Environmental Procedures Manual M 31-11.10. June 2011.
WSDOT, Maintenance and Operations Division, Best Management Practices Field Guide for ESA § 4 (d) Habitat Protection. March 2004.
WSDOT. Personal communication on March 19, 2012.
WSDOT. Written communication on March 28, 2012.
Young, Lenny. Washington Department of Natural Resources. Personal communication on March 14, 2012. R-10 Draft Economic Analysis - May 29, 2012
Second, not all of the third parties will be small entities. In addition, we note that we have constrained our population of potentially affected entities to those found in counties overlapping the proposed critical habitat, as opposed to including others found outside of the study area but within the States of Washington, Oregon, and California. The magnitude of the effect on these entities’ annual revenues or profits is unknown. Dun and Bradstreet, D&B - Dun’s Market Identifiers, searched via Dialog File 516 on May 16, 2012. Dun and Bradstreet collect data more frequently through daily in-person and telephone interviews, county state, and federal government sources, third party sources, business trade tape exchange programs, and large-volume mailings. Draft Economic Analysis - May 29, 2012 E X H I B I T A - 1 . T I M B E R - R E L AT E D P R I VAT E E N T I T I E S O F I N T E R E S T I N T H E 5 6 - C O U N T Y S T U D Y A R E A B A S E D O N D U N & B R A D S T R E E T D ATA
TOTAL Source: Dun and Bradstreet, D&B - Dun’s Market Identifiers, searched via Dialog File 516 on May 16, 2012. Draft Economic Analysis - May 29, 2012
TOTAL 2,616 Source: U.S. Census Bureau, 2009 County Business Patterns, June 2011. Accessed at http://www.census.gov/econ/cbp/index.html on May 16, 2012. T H I R D PA RY PA RT I C I PA N T S I N C O N S U LTAT I O N S O N L I N E A R P R O J E C T S 388. Potential future section 7 consultations on linear projects, including transportation and utility projects, are estimated in Chapter 7. Following the same logic applied in our analysis of timber projects above, we assume that a third party may be involved in each consultation. The characteristics of these third parties are discussed below. Tr a n s p o r t a t i o n Pr o j e c t s 389. Transportation projects, including State and county road and bridge construction and maintenance, are permitted by the State departments of transportation (WSDOT, ODOT, and CalTrans). To the extent that these projects rely on Federal funding or require a permit from the Corps, these State agencies may participate in future section 7 consultations. However, these agencies are not “small” government entities; thus no small entities are likely to participate as a third party in section 7 consultations on transportation projects. Further discussion of these projects is provided in Chapter 7 of this report. E l e c t r i c a n d G a s U t i l i t y Pr o j e c t s 390.
FERC identified one planned electric energy transmission project intersecting critical habitat that will require section 7 consultation. It is currently reviewing Portland General Electric’s application for the Cascade Crossing Project, which consists of installation of approximately 215 miles of 500-kilovolt transmission line running from Boardman to Salem, Oregon. SBA defines small electric energy companies as Draft Economic Analysis – May 29, 2012 having a total electric output of less than 4 million megawatt hours.270 Portland General Electric reported annual retail energy deliveries of over 19 million megawatt hours in 2011; thus, it is not a small entity.271 391.
Companies, Inc. The company is publicly-traded with reported revenues of $7.9 billion in 2011.273 Thus, it is not a small entity.
The Williams Companies, 2011 Annual Report, as viewed at http://www.targetdoc.com/viewer.asp?b=630&k=rpvr6883RP&bhcp=1 on May 17, 2012. Draft Economic Analysis – May 29, 2012 392. This estimate of the percentage of affected small entities in the region may be underestimated if a small number of the entities falling under NAICS codes 221121 and 221122 are “small entities” (i.e., the denominator in our calculation would shrink, leading to a higher percentage of affected entities). However, the percentage of affected small entities may also be overstated for the two reasons. First, the number of affected entities may be less than 10 if the same entity participates in more than one section 7 consultation in a given year. Furthermore, not all of the entities participating in section 7 consultation are likely to be small. The magnitude of impact on small entity revenues is unknown; however it is likely to be small as impacts are limited to minor administrative costs on the order of a few thousand dollars. S U M M A RY 393. In conclusion, considering the two available data sources, Dun and Bradstreet and U.S.
Census, approximately 50 small entities, or between less than one percent and two percent of small entities in our 56 county study area, may participate in section 7 consultations related to timber harvests on an annual basis. In addition, approximately 11 electricity transmission or natural gas pipeline companies may participate in section 7 consultations in a given year, representing an unknown percentage of total small entities in the area. 394. We believe our estimates are conservative (i.e., more likely to overstate than understate the number of affected entities) for several reasons. First, not all section 7 consultations will involve a third party. Second, not all of the third parties will be small entities. Third, the same entity may consult more than once in a single year. In addition, we note that we have constrained our population of potentially affected entities to those found in counties overlapping the proposed critical habitat, as opposed to including others found outside of the study area but within the States of Washington, Oregon, and California. The magnitude of the effect on these entities’ annual revenues or profits is unknown. Draft Economic Analysis - May 29, 2012 E X H I B I T A - 3 . U T I L I T Y E N T I T I E S O F I N T E R E S T I N T H E 5 6 - C O U N T Y S T U D Y A R E A B A S E D O N D U N A N D B R A D S T R E E T D ATA
TOTAL Source: Dun and Bradstreet, D&B - Dun’s Market Identifiers, searched via Dialog File 516 on May 17, 2012.
TOTAL at least 208 Source: U.S. Census Bureau, 2009 County Business Patterns, June 2011. Accessed at http://www.census.gov/econ/cbp/index.html on May 17, 2012. Draft Economic Analysis - May 29, 2012 U M R A A N A LY S I S 395. Title II of UMRA requires agencies to assess the effects of their regulatory actions on
Implementing E.O. 13211, M-01-27, Office of Management and Budget, July 13, 2001, http://www.whitehouse.gov/omb/memoranda/m01-27.html. A-11 Draft Economic Analysis – May 29, 2012 Other similarly adverse outcomes. 402. As described in Chapter 7, the proposed revised critical habitat designation for NSO is anticipated to affect installation and maintenance of power transmission lines and other utility pipelines. Impacts to these projects may increase the cost of energy distribution.
However, we do not anticipate incremental impacts to these projects beyond the administrative costs of addressing the adverse modification standard in section 7 consultation. Given the small number of projects affected, the proposed designation is not anticipated to increase the cost of energy production or distribution in the United States in excess of one percent. Thus, none of the nine threshold levels of impact listed above is exceeded. Ibid. A-12 Draft Economic Analysis - May 29, 2012