{"document":{"doc_id":9192,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System General Permit Remand Rule","date":"2016-12-09","url":"https://www.federalregister.gov/documents/2016/12/09/2016-28426/national-pollutant-discharge-elimination-system-npdes-municipal-separate-storm-sewer-system-general","source_native_id":"2016-28426","status":"fetched","abstract":"The Environmental Protection Agency (EPA) is revising the regulations governing regulated small municipal separate storm sewer system (MS4) permits to respond to a remand from the United States Court of Appeals for the Ninth Circuit in Environmental Defense Center, et al. v. EPA, 344 F.3d 832 (9th Cir. 2003). In that decision, the court determined that the regulations for providing coverage under small MS4 general permits did not provide for adequate public notice and opportunity to request a hearing. Additionally, the court found that EPA failed to require permitting authority review of the best management practices (BMPs) to be used at a particular MS4 to ensure that the small MS4 permittee reduces pollutants in the discharge from their systems to the \"maximum extent practicable\" (MEP), the standard established by the Clean Water Act (CWA) for such permits. The final rule establishes two alternative approaches a permitting authority can use to issue National Pollutant Discharge Elimination (NPDES) general permits for small MS4s and meet the requirements of the court remand. The first option is to establish all necessary permit terms and conditions to require the MS4 operator to reduce the discharge of pollutants from its MS4 to the MEP, to protect water quality, and to satisfy the appropriate water quality requirements of the Clean Water Act (\"MS4 permit standard\") upfront in one comprehensive permit. The second option allows the permitting authority to establish the necessary permit terms and conditions in two steps: A first step to issue a base general permit that contains terms and conditions applicable to all small MS4s covered by the permit and a second step to establish necessary permit terms and conditions for individual MS4s that are not in the base general permit. Public notice and comment and opportunity to request a hearing would be necessary for both steps of this two-step general permit. This final rule does not establish any new substantive requirements for small MS4 permits.","action":"Final rule."},"dockets":["EPA-HQ-OW-2015-0671"],"rins":["RIN 2040-AF57"],"related":[{"doc_id":10110,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System General Permit Remand","date":"2016-01-06"},{"doc_id":26051,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Economic Analysis Cost Estimates","date":"2016-01-06"},{"doc_id":26052,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Economic Analysis Report","date":"2016-01-06"},{"doc_id":130421,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Proposed Rule Changes Strikeout Version Traditional General Permit Approach","date":"2016-01-06"},{"doc_id":130422,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Changes Made During Interagency Review","date":"2016-01-06"},{"doc_id":238974,"source":"docket_item","org":"EPA","doc_type":"data","title":"Current NPDES Authority Practices in Administering Small MS4 General Permits","date":"2016-01-06"},{"doc_id":281757,"source":"docket_item","org":"EPA","doc_type":"publication","title":"EPA Phase II Storm Water Regulations","date":"2016-01-06"},{"doc_id":281758,"source":"docket_item","org":"EPA","doc_type":"publication","title":"EPA Compendium of MS4 General Permit Requirements 2015","date":"2016-01-06"},{"doc_id":281759,"source":"docket_item","org":"EPA","doc_type":"publication","title":"NPDES Regulations 40 CFR 100 to 135 current","date":"2016-01-06"},{"doc_id":281760,"source":"docket_item","org":"EPA","doc_type":"publication","title":"EPA MS4 Permit Compendium 2014","date":"2016-01-06"},{"doc_id":281761,"source":"docket_item","org":"EPA","doc_type":"publication","title":"EPA MS4 Permit Improvement Guide 2010","date":"2016-01-06"},{"doc_id":281762,"source":"docket_item","org":"EPA","doc_type":"publication","title":"EPA Phase I Stormwater Regulations","date":"2016-01-06"},{"doc_id":281763,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Clean Water Act","date":"2016-01-06"},{"doc_id":130071,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Summary of Changes Made During EO 12866 Review to the Draft Final Rule","date":"2016-12-09"},{"doc_id":391493,"source":"docket_item","org":"EPA","doc_type":"other","title":"Response to Comment Document","date":"2016-12-09"},{"doc_id":391494,"source":"docket_item","org":"EPA","doc_type":"other","title":"Mark-Up Version of Final MS4 General Permit Remand Rule","date":"2016-12-09"},{"doc_id":26054,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Economic Analysis Report - Final Rule","date":"2016-12-30"}],"references":[{"citation_id":43247,"raw_reference":"MS4 Permit Improvement Guide (EPA, 2010)","cited_authors":"EPA","cited_year":"2010","cited_title":"MS4 Permit Improvement Guide","cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section I.C (General Information)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43248,"raw_reference":"Compendium of MS4 Permitting Approaches—Part 2: Post Construction Standards (EPA, 2016)","cited_authors":"EPA","cited_year":"2016","cited_title":"Compendium of MS4 Permitting Approaches—Part 2: Post Construction Standards","cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section I.C (General Information)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43249,"raw_reference":"Compendium of MS4 Permitting Approaches—Part 3: Water Quality-Based Requirements (EPA, 2016)","cited_authors":"EPA","cited_year":"2016","cited_title":"Compendium of MS4 Permitting Approaches—Part 3: Water Quality-Based Requirements","cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section I.C (General Information)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43250,"raw_reference":"Compendium of MS4 Permitting Approaches—Part 1: Six Minimum Control Measure Provisions (EPA, 2016)","cited_authors":"EPA","cited_year":"2016","cited_title":"Compendium of MS4 Permitting Approaches—Part 1: Six Minimum Control Measure Provisions","cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section V.A (Comprehensive General Permit Approach)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43493,"raw_reference":"Implementing the Partial Remand of the Stormwater Phase II Regulations Regarding Notices of Intent & NPDES General Permitting for Phase II MS4s, EPA (2004)","cited_authors":"EPA","cited_year":"2004","cited_title":"Implementing the Partial Remand of the Stormwater Phase II Regulations Regarding Notices of Intent & NPDES General Permitting for Phase II MS4s","cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section VIII.B (Status of the 2004 Interim Guidance)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43494,"raw_reference":"Economic Analysis for the Municipal Separate Storm Sewer System (MS4) General Permit Remand Rule","cited_authors":"EPA","cited_year":null,"cited_title":"Economic Analysis for the Municipal Separate Storm Sewer System (MS4) General Permit Remand Rule","cited_venue":"U.S. Environmental Protection Agency (docket)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section X.A (Executive Order 12866)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43495,"raw_reference":"Economic Analysis for the Final Municipal Separate Storm Sewer System General Permit Remand Rule","cited_authors":"EPA","cited_year":null,"cited_title":"Economic Analysis for the Final Municipal Separate Storm Sewer System General Permit Remand Rule","cited_venue":"U.S. Environmental Protection Agency (docket EPA-HQ-OW-2015-0671)","cited_doi":null,"cited_url":"http://www.regulations.gov","ref_kind":"government_report","section":"Section X.E (Executive Order 13132)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}