{"document":{"doc_id":9041,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act","date":"2017-01-13","url":"https://www.federalregister.gov/documents/2017/01/13/2016-31426/accidental-release-prevention-requirements-risk-management-programs-under-the-clean-air-act","source_native_id":"2016-31426","status":"fetched","abstract":"The Environmental Protection Agency (EPA), in response to Executive Order 13650, is amending its Risk Management Program regulations. The revisions contain several changes to the accident prevention program requirements including an additional analysis of safer technology and alternatives as part of the process hazard analysis for some Program 3 processes, third-party audits and incident investigation root cause analysis for Program 2 and Program 3 processes; enhancements to the emergency preparedness requirements; increased public availability of chemical hazard information; and several other changes to certain regulatory definitions and data elements submitted in risk management plans. These amendments seek to improve chemical process safety, assist local emergency authorities in planning for and responding to accidents, and improve public awareness of chemical hazards at regulated sources.","action":"Final rule."},"dockets":["EPA-HQ-OEM-2015-0725"],"rins":["RIN 2050-AG82"],"related":[{"doc_id":9959,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act","date":"2016-03-14"},{"doc_id":21861,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February 23, 2016.  Interagency Communications regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Original 1996 Regulatory Impact Analysis","date":"2016-03-14"},{"doc_id":21867,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February 8, 2016. EO 12866 Interagency Review Communications on Risk Management Modernization RIN 2050-AG82 regarding Notice of Proposed Rulemaking and Regulatory Impact Analysis (redline version), Interagency Comments and Two Public Comments on the RMP Request for Information from NASTTPO and OK MERC.  Office of Land and Emergency Management, USPEA, Washington, DC","date":"2016-03-14"},{"doc_id":21868,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February  24, 2016.  Interagency Communications regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Comment on Notice of Proposed Rulemaking and Regulatory Impact Analysis.  Office of Land and Emergency Management, USEPA","date":"2016-03-14"},{"doc_id":21895,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February 23, 2016.  Interagency Communications Rgarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Notice of Proposed Rulemaking Comments (redline) and Regulatory Impact Analysis Comments (redline)","date":"2016-03-14"},{"doc_id":21899,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. January 11, 2016.  Interagency Communications regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8,_Regulatory Impact Analysis, comment from SBA.  Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":21902,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA.  February 24, 2016.  Regulatory Impact Analysis for Accidental Release Prevention Requirements:  Risk Management Programs Under the Clean Air Act, Section 112(r)(7)","date":"2016-03-14"},{"doc_id":21904,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February 24, 2016. EO 12866 Interagency Review Communications on Risk Management Modernization RIN 2050-AG82 regarding Notice of Proposed Rulemaking and Regulatory Impact Analysis (clean versions)","date":"2016-03-14"},{"doc_id":21906,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February 19, 2016.  Interagency Communications regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Regulatory Impact Analysis (redline version)","date":"2016-03-14"},{"doc_id":21907,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February 19, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Revised Regulatory Impact Analysis (redline).  Office of Land and Emergency Management, USEPA","date":"2016-03-14"},{"doc_id":21909,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA.  February 24, 2016.  Documentation of Changes Made During OMB Review Under E.O. 12866: Risk Management Program Proposed Rule- Regulatory Impact Analysis -  Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7)","date":"2016-03-14"},{"doc_id":21911,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February 24, 2016. EO 12866 Interagency Review Communications on Risk Management Modernization RIN 2050-AG82 regarding Notice of Proposed Rulemaking and Regulatory Impact Analysis (compare versions) (redline)","date":"2016-03-14"},{"doc_id":21914,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February 22, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG82 Regulatory Impact Analysis (redline version)","date":"2016-03-14"},{"doc_id":21915,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February 24, 2016.  Interagency Communications regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG82_Regulatory Impact Analysis section 5.7.  Office of Land and Emergency Management,  USEPA.","date":"2016-03-14"},{"doc_id":21917,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. February 12, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Regulatory Impact Analysis New Section in Chapter 5.  Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":21919,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Mason, Steve. September 01, 2015.  Email from Steve Mason, EPA Region 6 to Jim Belke, Office of Emergency Management, USEPA, regarding accounting for state/local government costs in RIA","date":"2016-03-14"},{"doc_id":21923,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"EPA. June 1996. Economic Analysis in Support of Final Rule on Risk Management Program Regulations for Chemical Accident Release Prevention, As Required by Section 112(r) of the Clean Air Act","date":"2016-03-14"},{"doc_id":21925,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"EPA. June 1996. Economic Analysis in Support of Final Rule on Risk Management Program Regulations for Chemical Accident Release Prevention. Provided to Small Entity Representatives for EPA RMP Small Business Advocacy Review Panel","date":"2016-03-14"},{"doc_id":21929,"source":"ria","org":"EPA","doc_type":"regulatory_flexibility_analysis","title":"OSHA. February 14, 1992. Final Regulatory Impact and Regulatory Flexibility Analysis of the Final Standard for Process Safety Management of Highly Hazardous Chemicals (§1910.119, SubPart  H)","date":"2016-03-14"},{"doc_id":21931,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"EPA.  December 17, 2015.  Document submitted to OMB on 12/22/15 to initiate E.O. 12866 review: Risk Management Program Proposed Rule, Regulatory Impact Analysis -  Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7)","date":"2016-03-14"},{"doc_id":130373,"source":"docket_item","org":"EPA","doc_type":"analysis","title":"EPA.  December 17, 2010 (updated May 2014). Guidelines for Preparing Economic Analyses","date":"2016-03-14"},{"doc_id":130374,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February  10, 2016.  Interagency Communications regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Comment on Notice of Proposed Rulemaking and OSHA feasibility.  Office of Land and Emergency Management, USEPA","date":"2016-03-14"},{"doc_id":130375,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. January 5, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Briefing for OMB and Interagency Reviewers.  Office of Land and Emergency Management, USEPA","date":"2016-03-14"},{"doc_id":130376,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. January 13, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Interagency Comments on Notice of Proposed Rulemaking.  Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":130377,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. January 14, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Interagency Comments on Notice of Proposed Rulemaking.  Office of Land and Emergency Management, USEPA","date":"2016-03-14"},{"doc_id":130379,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February  11, 2016.  Interagency Communications regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Comment on Notice of Proposed Rulemaking and OSHA feasibility Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":130380,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February 18, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernizatio RIN 2050-AG8, Comments from SBA on Notice of Proposed Rulemaking.  Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":130381,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. January 29, 2016.  Interagency Meeting Agenda and Meeting Summary Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG82_Notice of Proposed Rulemaking","date":"2016-03-14"},{"doc_id":130382,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February 22, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Comments on Notice of Proposed Rulemaking and EPA Response.  Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":130383,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February  17, 2016.  Interagency Communications regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, comment on Notice of Proposed Rulemaking.  Office of Land and Emergency Management, USEPA","date":"2016-03-14"},{"doc_id":130384,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February 16, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Notice of Proposed Rulemaking Comments (redline) and Interagency Comments.  Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":130385,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February 22, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Response to SBA Comment on Notice of Proposed Rulemaking.  Office of Land and Emergency Management, USEPA","date":"2016-03-14"},{"doc_id":130386,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February 18, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Notice of Proposed Rulemaking Comments (redline) and Interagency Comments.  Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":130387,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February  9, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Comment on Notice of Proposed Rulemaking and OSHA Feasibility.  Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":130388,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February 23, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, Conference Call Request.  Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":130389,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February 22, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG8, SBA Comment on Notice of Proposed Rulemaking.  Office of Land and Emergency Management,  USEPA","date":"2016-03-14"},{"doc_id":130390,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  December 17, 2015.  Document submitted to OMB on 12/22/15 to Initiate E.O. 12866 review: Risk Management Program Proposed Rule FR notice -  Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7)","date":"2016-03-14"},{"doc_id":130391,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  February 24, 2016.  Documentation of Changes Made During OMB Review Under E.O. 12866: Risk Management Program Proposed Rule- Federal Register notice -  Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7)","date":"2016-03-14"},{"doc_id":130359,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February 22, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG82, Comments on RMP NPRM and EPA Response. Office of Land and Emergency Management,  USEPA","date":"2016-03-22"},{"doc_id":130360,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA. February 19, 2016.  Interagency Communications Regarding EO 12866 Interagency Review Risk Management Modernization RIN 2050-AG82, Minor Edits on RMP NPRM. Office of Land and Emergency Management, USEPA","date":"2016-03-22"},{"doc_id":21859,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA.  December 19, 2016. Interagency Review Communications Between OMB and EPA - Email from Gerain Cogliano of EPA to OMB Regarding Redline Versions of Final RMP Rule and RIA for EO 12866 Interagency Review. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":21860,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA. December 16, 2016. Regulatory Impact Analysis: Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7).  Office of Emergency Management, US Environmental Protection Agency, Washington, DC","date":"2017-01-13"},{"doc_id":21865,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"EPA.  December 19, 2016.  Documentation of Changes Made During OMB Review Under E.O. 12866: Risk Management Program Final Rule- Regulatory Impact Analysis - Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7).  Office of Emergency Management, Office of Land and Emergency Management, US EPA, Washington, DC","date":"2017-01-13"},{"doc_id":21932,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"EPA.  October 13, 2016.  Document submitted to OMB on 10/13/16 to initiate E.O. 12866 review: Risk Management Program Final Rule, Regulatory Impact Analysis -  Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7).  Office of Emergency Management, Office of Solid Waste and Emergency Response, US EPA, Washington, DC","date":"2017-01-13"},{"doc_id":130001,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  December 16, 2016. Interagency Review Communications Between OMB and EPA - Email from Bill Noggle of EPA to OMB with Attached Response to Follow Up Comments for EO 12866 Interagency Review on Final RMP Rule. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130002,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  December 14, 2016. Interagency Review Communications Between OMB and EPA - Email from Danielle Jones of OMB to EPA With Attached EPA Responses to EO 12866 Interagency Review Follow Up Comments on Final RMP Rule. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130003,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  December 15, 2016. Interagency Review Communications Between OMB and EPA - Email from Danielle Jones of OMB to EPA with Attached Follow Up Comments for EO 12866 Interagency Review on Final RMP Rule. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130004,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  November 17, 2016. Interagency Review Communications Between OMB and EPA - Email from Danielle Jones of OMB to EPA with EO 12866 Interagency Review Comments on Final RMP Rule Regarding Water and Wastewater Sectors. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130005,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  December 20, 2016. Interagency Review Communications Between OMB and EPA - Email from Danielle Jones of OMB to EPA Concluding Review of EO 12866 Interagency Review on Final RMP Rule. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130006,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  November 7, 2016.  Interagency Review Communications Between OMB and EPA - Email from Danielle Jones of OMB to EPA with Attached EO 12866 Interagency Review Comments on Final RMP Rule. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130007,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  November 22, 2016. Interagency Review Communications Between OMB and EPA - Email from Danielle Jones of OMB to EPA with EO 12866 Interagency Review Additional Comments on Final RMP Rule. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130008,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  November 22, 2016.  Interagency Review Communications Between OMB and EPA - Email Invitation from Bill Noggle of EPA to OMB with Attached Response to Comments on EO 12866 Interagency Review of Final RMP Rule.  Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130009,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  December 7, 2016. Interagency Review Communications Between OMB and EPA - Email from Danielle Jones of OMB to EPA with Attached EO 12866 Interagency Review Comments on Final RMP Rule. Office of Land and Emergency Management, USPEA, Washington, DC","date":"2017-01-13"},{"doc_id":130010,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  December 20, 2016. Interagency Review Communications Between OMB and EPA - Email from Gerain Cogliano of EPA to OMB Regarding Uploading Documents to ROCIS for EO 12866 Interagency Review on Final RMP Rule. Office of Land and Emergency Management, USPEA, Washington, DC","date":"2017-01-13"},{"doc_id":130011,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  December 12, 2016.  Interagency Review Communications Between OMB and EPA - Email Invitation from Gerain Cogliano of EPA for Meeting of Discussion of Comments on EO 12866 Interagency Review of Final RMP Rule. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130012,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  December 14, 2016.  Interagency Review Communications Between OMB and EPA - Email Invitation from Gerain Cogliano of EPA for Meeting of Discussion of Comments on EO 12866 Interagency Review of Final RMP Rule. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130013,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  October 19, 2016.  Interagency Review Communications Between OMB and EPA - Email Invitation from Gerain Cogliano of EPA for Briefing for EO 12866 Interagency Review of Final RMP Rule with Attached Briefing Materials. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130014,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  October 14, 2016.  Interagency Review Communications Between OMB and EPA - Email from Danielle Jones of OMB Requesting Briefing for EO 12866 Interagency Review of Final RMP Rule. Office of Land and Emergency Management, USEPA, Washington, DC","date":"2017-01-13"},{"doc_id":130015,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"EPA.  October 13, 2016.  Document submitted to OMB on  October 13, 2016 to initiate E.O. 12866 review: Risk Management Program Final Rule FR Notice - Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7).  Office of Emergency Management, Office of Solid Waste and Emergency Response, US EPA, Washington, DC","date":"2017-01-13"},{"doc_id":130016,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"DOE. May 9, 2011.  Cost Estimating Guide, DOE G 413.3-21. US Department of Energy, Washington, DC","date":"2017-01-13"}],"references":[{"citation_id":41591,"raw_reference":"CSB. January 2016. Final Investigation Report, West Fertilizer Company Fire and Explosion, West, TX, April 17, 2013. REPORT 2013-02-I-TX.","cited_authors":"U.S. Chemical Safety and Hazard Investigation Board (CSB)","cited_year":"2016","cited_title":"Final Investigation Report, West Fertilizer Company Fire and Explosion, West, TX, April 17, 2013","cited_venue":"CSB Report 2013-02-I-TX","cited_doi":null,"cited_url":"http://www.csb.gov/west-fertilizer-explosion-and-fire-/","ref_kind":"research_report","section":"fn 7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41592,"raw_reference":"U.S. Chemical Safety and Hazard Investigation Board (CSB). March 2007. Investigation Report: Refinery Explosion and Fire, BP, Texas City, Texas, March 23, 2005. Report No. 2005-04-I-TX.","cited_authors":"U.S. Chemical Safety and Hazard Investigation Board (CSB)","cited_year":"2007","cited_title":"Investigation Report: Refinery Explosion and Fire, BP, Texas City, Texas, March 23, 2005","cited_venue":"Report No. 2005-04-I-TX","cited_doi":null,"cited_url":"http://www.csb.gov/assets/1/19/CSBFinalReportBP.pdf","ref_kind":"research_report","section":"fn 8","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41593,"raw_reference":"CSB. May 2014. Investigation Report: Catastrophic Rupture of Heat Exchanger, Tesoro Anacortes Refinery, Anacortes, Washington, April 2, 2010. Report No. 2010-08-I-WA.","cited_authors":"U.S. Chemical Safety and Hazard Investigation Board (CSB)","cited_year":"2014","cited_title":"Investigation Report: Catastrophic Rupture of Heat Exchanger, Tesoro Anacortes Refinery, Anacortes, Washington, April 2, 2010","cited_venue":"Report No. 2010-08-I-WA","cited_doi":null,"cited_url":"http://www.csb.gov/assets/1/7/Tesoro_Anacortes_2014-May-01.pdf","ref_kind":"research_report","section":"fn 9","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41594,"raw_reference":"CSB. January 2014. Regulatory Report: Chevron Richmond Refinery Pipe Rupture and Fire, Chevron Richmond Refinery #4 Crude Unit, Richmond, California, August 6, 2012. Report No. 2012-03-I-CA.","cited_authors":"U.S. Chemical Safety and Hazard Investigation Board (CSB)","cited_year":"2014","cited_title":"Regulatory Report: Chevron Richmond Refinery Pipe Rupture and Fire, Chevron Richmond Refinery #4 Crude Unit, Richmond, California, August 6, 2012","cited_venue":"Report No. 2012-03-I-CA","cited_doi":null,"cited_url":"http://www.csb.gov/assets/1/19/CSB_Chevron_Richmond_Refinery_Regulatory_Report.pdf","ref_kind":"research_report","section":"fn 10","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41595,"raw_reference":"CSB. October 2016. Case Study: Williams Geismar Olefins Plant Reboiler Rupture and Fire, Geismar, Louisiana. Incident Date: June 13, 2013, No. 2013-03-I-LA.","cited_authors":"U.S. Chemical Safety and Hazard Investigation Board (CSB)","cited_year":"2016","cited_title":"Case Study: Williams Geismar Olefins Plant Reboiler Rupture and Fire, Geismar, Louisiana","cited_venue":"No. 2013-03-I-LA","cited_doi":null,"cited_url":"http://www.csb.gov/williams-olefins-plant-explosion-and-fire-/","ref_kind":"research_report","section":"fn 11","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41596,"raw_reference":"Lees, Frank P. 2012. Loss Prevention in the Process Industries, Fourth Edition. Butterworth-Heinemann.","cited_authors":"Frank P. Lees","cited_year":"2012","cited_title":"Loss Prevention in the Process Industries, Fourth Edition","cited_venue":"Butterworth-Heinemann","cited_doi":null,"cited_url":"http://www.sciencedirect.com/science/book/9780123971890","ref_kind":"book","section":"fn 22","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41597,"raw_reference":"CCPS. January 2011. Process Safety Leading and Lagging Metrics—You Don't Improve What You Don't Measure, p. 36. CCPS, American Institute of Chemical Engineers, New York, NY. John Wiley and Sons.","cited_authors":"Center for Chemical Process Safety (CCPS)","cited_year":"2011","cited_title":"Process Safety Leading and Lagging Metrics—You Don't Improve What You Don't Measure","cited_venue":"CCPS, American Institute of Chemical Engineers; John Wiley and Sons","cited_doi":null,"cited_url":"http://www.aiche.org/sites/default/files/docs/pages/CCPS_ProcessSafety_Lagging_2011_2-24.pdf","ref_kind":"book","section":"fn 24","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41598,"raw_reference":"CCPS. March 2003. Guidelines for Investigating Chemical Process Incidents, 2nd ed., p. 68.","cited_authors":"Center for Chemical Process Safety (CCPS)","cited_year":"2003","cited_title":"Guidelines for Investigating Chemical Process Incidents, 2nd ed.","cited_venue":"AIChE","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 25","page":null,"context_sentence":"An event occurs, or a potentially unsafe situation is discovered; The event or unsafe situation had reasonable potential to escalate; and The potential escalation would have led to adverse impacts. The CCPS document and the CCPS ``Guidelines for Investigating Chemical Process Incidents'' contain many examples of near misses, which can be an actual event or discovery of a potentially unsafe situation.\\25\\ Examples of incidents that should be investigated include some process upsets, such as: excursions of process parameters beyond pre-established critical control limits; activation of layers of protection such as relief valves, interlocks, rupture discs, blowdown systems, halon systems, vapor release alarms, and fixed vapor spray systems; and activation of emergency shutdowns. --------------------------------------------------------------------------- ---------------------------------------------------------------------------","paper_id":70209,"paper_title":"Guidelines for Investigating Chemical Process Incidents","paper_year":2003,"paper_doi":"10.1002/9780470925133"},{"citation_id":41599,"raw_reference":"AIChE/CCPS, 1992, pp 143 \"Guidelines for Hazard Evaluation Procedures—Second Edition with Worked Examples\"","cited_authors":"AIChE/Center for Chemical Process Safety (CCPS)","cited_year":"1992","cited_title":"Guidelines for Hazard Evaluation Procedures—Second Edition with Worked Examples","cited_venue":"AIChE/CCPS","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"Section IV.A.3.c (Hazard review and PHA)","page":null,"context_sentence":null,"paper_id":72341,"paper_title":"Guidelines for Hazard Evaluation Procedures, 2nd Edition with Worked Examples","paper_year":1993,"paper_doi":"10.1016/0950-4230(93)80011-a"},{"citation_id":41600,"raw_reference":"EPA. May 24, 1996. Risk Management Plan Rule, Summary and Response to Comments. Volume 1, p. 16-4. Docket No. A-91-73, Document No. IX-C-1.","cited_authors":"U.S. Environmental Protection Agency","cited_year":"1996","cited_title":"Risk Management Plan Rule, Summary and Response to Comments","cited_venue":"EPA Docket No. A-91-73","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 23","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41601,"raw_reference":"EPA, Risk Management Plan Rule: Summary and Response to Comments, Excerpt from Volume 1: Table of Contents, Introduction, and Sections 3, 16 and 17. May 24, 1996, pp 3-11 and 17-4. Document No. EPA-HQ-OEM-2015-0725-0153","cited_authors":"U.S. Environmental Protection Agency","cited_year":"1996","cited_title":"Risk Management Plan Rule: Summary and Response to Comments, Excerpt from Volume 1: Table of Contents, Introduction, and Sections 3, 16 and 17","cited_venue":"EPA Docket No. EPA-HQ-OEM-2015-0725-0153","cited_doi":null,"cited_url":"https://www.regulations.gov/document?D=EPA-HQ-OEM-2015-0725-0153","ref_kind":"research_report","section":"fn 21","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41602,"raw_reference":"CCPS 2003. Center for Chemical Process Safety, Guidelines for Investigating Chemical Process Incidents, 2nd Edition, NY: AIChE.","cited_authors":"Center for Chemical Process Safety (CCPS)","cited_year":"2003","cited_title":"Guidelines for Investigating Chemical Process Incidents, 2nd Edition","cited_venue":"AIChE","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 27","page":null,"context_sentence":"For example, CCPS has published Guidelines for Investigating Chemical Process Incidents, which provides extensive guidance on incident investigations, near miss identification, root cause analysis, and other related topics.\\27\\ --------------------------------------------------------------------------- ---------------------------------------------------------------------------","paper_id":70209,"paper_title":"Guidelines for Investigating Chemical Process Incidents","paper_year":2003,"paper_doi":"10.1002/9780470925133"},{"citation_id":41603,"raw_reference":"Senate Committee on Environment and Public Works, Clean Air Act Amendments of 1989, Senate Report No. 228, 101st Congress, 1st Session (1989)—\"Senate Report\".","cited_authors":"U.S. Senate Committee on Environment and Public Works","cited_year":"1989","cited_title":"Clean Air Act Amendments of 1989, Senate Report No. 228","cited_venue":"101st Congress, 1st Session","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 26","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44293,"raw_reference":"EPA, 2016. Regulatory Impact Analysis—Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7). Exhibit 7-9.","cited_authors":"EPA","cited_year":"2016","cited_title":"Regulatory Impact Analysis—Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7)","cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 124","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44294,"raw_reference":"CCPS. 2009. Inherently Safer Chemical Processes: A Life Cycle Approach, 2nd ed., American Institute of Chemical Engineers, CCPS New York, Wiley, p. 25.","cited_authors":"CCPS","cited_year":"2009","cited_title":"Inherently Safer Chemical Processes: A Life Cycle Approach, 2nd ed.","cited_venue":"American Institute of Chemical Engineers, CCPS / Wiley","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 126","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44295,"raw_reference":"General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR part 68), March 2009. https://www.epa.gov/sites/production/files/2013-11/documents/chap-09-final.pdf","cited_authors":"EPA","cited_year":"2009","cited_title":"General Guidance on Risk Management Programs for Chemical Accident Prevention","cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":"https://www.epa.gov/sites/production/files/2013-11/documents/chap-09-final.pdf","ref_kind":"research_report","section":"fn 117","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44296,"raw_reference":"General Guidance for Facilities on Risk Management Programs for Chemical Accident Prevention (40 CFR part 68), March 2009. https://www.epa.gov/rmp/guidance-facilities-risk-management-programs-rmp","cited_authors":"EPA","cited_year":"2009","cited_title":"General Guidance for Facilities on Risk Management Programs for Chemical Accident Prevention","cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":"https://www.epa.gov/rmp/guidance-facilities-risk-management-programs-rmp","ref_kind":"research_report","section":"fn 120","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44297,"raw_reference":"OSHA Fact Sheet—Hazard Communication Standard Final Rule. https://www.osha.gov/dsg/hazcom/HCSFactsheet.html","cited_authors":"OSHA","cited_year":null,"cited_title":"OSHA Fact Sheet—Hazard Communication Standard Final Rule","cited_venue":"Occupational Safety and Health Administration","cited_doi":null,"cited_url":"https://www.osha.gov/dsg/hazcom/HCSFactsheet.html","ref_kind":"web_page","section":"fn 119","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44429,"raw_reference":"CCPS. 2009, Inherently Safer Chemical Processes: A Life Cycle Approach. 2nd ed. American Institute of Chemical Engineers, Center for Chemical Process Safety. pp. 10-11.","cited_authors":"CCPS","cited_year":"2009","cited_title":"Inherently Safer Chemical Processes: A Life Cycle Approach, 2nd ed.","cited_venue":"American Institute of Chemical Engineers, Center for Chemical Process Safety","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 93","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44430,"raw_reference":"CCPS. July 2010. Final Report: Definition for Inherently Safer Technology in Production, Transportation, Storage, and Use, https://www.regulations.gov/document?D=EPA-HQ-OEM-2015-0725-0274","cited_authors":"CCPS","cited_year":"2010","cited_title":"Final Report: Definition for Inherently Safer Technology in Production, Transportation, Storage, and Use","cited_venue":"Center for Chemical Process Safety","cited_doi":null,"cited_url":"https://www.regulations.gov/document?D=EPA-HQ-OEM-2015-0725-0274","ref_kind":"research_report","section":"fn 102","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44431,"raw_reference":"Contra Costa Hazardous Materials Program. June 15, 2011. Industrial Safety Ordinance Guidance Document, Attachment C—Inherently Safer Systems Checklist. Contra Costa County Health Services, Martinez, CA","cited_authors":"Contra Costa Hazardous Materials Program","cited_year":"2011","cited_title":"Industrial Safety Ordinance Guidance Document, Attachment C—Inherently Safer Systems Checklist","cited_venue":"Contra Costa County Health Services, Martinez, CA","cited_doi":null,"cited_url":"https://www.regulations.gov/document?D=EPA-HQ-OEM-2015-0725-0146","ref_kind":"government_report","section":"fn 102","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44432,"raw_reference":"NJDEP. January 15, 2015. Guidance for Toxic Catastrophe Prevention Act (TCPA), Inherently Safer Technology (IST)","cited_authors":"NJDEP","cited_year":"2015","cited_title":"Guidance for Toxic Catastrophe Prevention Act (TCPA), Inherently Safer Technology (IST)","cited_venue":"New Jersey Department of Environmental Protection","cited_doi":null,"cited_url":"https://www.regulations.gov/document?D=EPA-HQ-OEM-2015-0725-0142","ref_kind":"government_report","section":"fn 102","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44433,"raw_reference":"CCPS. 2007. Guidelines for Risk Based Process Safety. American Institute of Chemical Engineers, CCPS, NY, Wiley. Chapter 9—Hazard Identification and Risk Analysis.","cited_authors":"CCPS","cited_year":"2007","cited_title":"Guidelines for Risk Based Process Safety","cited_venue":"American Institute of Chemical Engineers, Wiley","cited_doi":"10.1002/9780470925119","cited_url":null,"ref_kind":"book","section":"fn 104","page":null,"context_sentence":"For further information, EPA recommends consulting Chapter 9--Hazard Identification and Risk Analysis in the 2007 CCPS Guidelines for Risk Based Process Safety.\\104\\ --------------------------------------------------------------------------- ---------------------------------------------------------------------------","paper_id":10686,"paper_title":"Guidelines for Risk Based Process Safety","paper_year":2007,"paper_doi":"10.1002/9780470925119"},{"citation_id":44434,"raw_reference":"National Research Council of the National Academy of Sciences, The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience, 2012. https://www.nap.edu/catalog/13385/the-use-and-storage-of-methyl-isocyanate-mic-at-bayer-cropscience.","cited_authors":"National Research Council","cited_year":"2012","cited_title":"The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience","cited_venue":"National Academies of Sciences","cited_doi":"10.17226/13385","cited_url":"https://www.nap.edu/catalog/13385/the-use-and-storage-of-methyl-isocyanate-mic-at-bayer-cropscience","ref_kind":"book","section":"fn 105","page":null,"context_sentence":"The commenter cited as an example, the efforts involved by the National Academy of Sciences (NAS) to identify and evaluate the many individual alternative paths to methyl isocyanate (MIC) production for potential safer operations.\\105\\ The commenter stated that each alternative then had implications for the facility, the customer, the surrounding community and numerous other factors that needed to be identified, considered and weighed carefully.","paper_id":3728,"paper_title":"The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience","paper_year":2012,"paper_doi":"10.17226/13385"},{"citation_id":44435,"raw_reference":"ACC. 2016. Responsible Care Process Safety Code https://responsiblecare.americanchemistry.com/Responsible-Care-Program-Elements/Process-Safety-Code/Responsible-Care-Process-Safety-Code-PDF.pdf.","cited_authors":"American Chemistry Council","cited_year":"2016","cited_title":"Responsible Care Process Safety Code","cited_venue":"American Chemistry Council","cited_doi":null,"cited_url":"https://responsiblecare.americanchemistry.com/Responsible-Care-Program-Elements/Process-Safety-Code/Responsible-Care-Process-Safety-Code-PDF.pdf","ref_kind":"other","section":"fn 95","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44436,"raw_reference":"NJDEP's 2010 IST Implementation Summary report on IST reports submitted by NJ facilities since August 2008","cited_authors":"NJDEP","cited_year":"2010","cited_title":"IST Implementation Summary","cited_venue":"New Jersey Department of Environmental Protection","cited_doi":null,"cited_url":"https://www.regulations.gov/document?D=EPA-HQ-OEM-2015-0725-0143","ref_kind":"government_report","section":"fn 99","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44437,"raw_reference":"2008 Nationwide Survey of Local Emergency Planning Committees (LEPCs). https://www.epa.gov/epcra/nationwide-survey-local-emergency-planning-committees","cited_authors":"EPA","cited_year":"2008","cited_title":"2008 Nationwide Survey of Local Emergency Planning Committees (LEPCs)","cited_venue":"U.S. Environmental Protection Agency","cited_doi":null,"cited_url":"https://www.epa.gov/epcra/nationwide-survey-local-emergency-planning-committees","ref_kind":"research_report","section":"fn 110","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44438,"raw_reference":"CSB. January 2016. Final Investigation Report, West Fertilizer Company Fire and Explosion, West, TX, April 17, 2013. Report 2013-02-I-TX","cited_authors":"U.S. Chemical Safety Board","cited_year":"2016","cited_title":"Final Investigation Report, West Fertilizer Company Fire and Explosion, West, TX, April 17, 2013","cited_venue":"U.S. Chemical Safety and Hazard Investigation Board","cited_doi":null,"cited_url":"http://csb.gov/west-fertilizer-explosion-and-fire-/","ref_kind":"government_report","section":"fn 112","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":44439,"raw_reference":"CSB. January 2011. Investigation Report: Pesticide Chemical Runaway Reaction Pressure Vessel Explosion, Bayer CropScience, LP, Institute, West Virginia, August 28, 2008. Report No. 2008-08-I-WV","cited_authors":"U.S. Chemical Safety Board","cited_year":"2011","cited_title":"Investigation Report: Pesticide Chemical Runaway Reaction Pressure Vessel Explosion, Bayer CropScience, LP, Institute, West Virginia","cited_venue":"U.S. Chemical Safety and Hazard Investigation Board","cited_doi":null,"cited_url":"http://www.csb.gov/assets/1/19/Bayer_Report_final.pdf","ref_kind":"government_report","section":"fn 113","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":46982,"raw_reference":"Short, Jodi L., and Michael W. Toffel, The Integrity of Private Third-party Compliance Monitoring, Harvard Kennedy School Regulatory Policy Program Working Paper, No. RPP-2015-20, November 2015. (Revised December 2015)","cited_authors":"Jodi L. Short; Michael W. Toffel","cited_year":"2015","cited_title":"The Integrity of Private Third-party Compliance Monitoring","cited_venue":"Harvard Kennedy School Regulatory Policy Program Working Paper, No. RPP-2015-20","cited_doi":"10.2139/ssrn.2695429","cited_url":"http://www.hbs.edu/faculty/Pages/item.aspx?num=50186","ref_kind":"working_paper","section":"fn 40","page":null,"context_sentence":"These biases are compelling precisely because they are not the hallmark solely of fraudulent firms but are exhibited commonly by entities with no overt or covert malicious intent to be inaccurate or unfair in their auditing or reporting.\\40\\ --------------------------------------------------------------------------- ---------------------------------------------------------------------------","paper_id":10688,"paper_title":"The Integrity of Private Third-Party Compliance Monitoring","paper_year":2015,"paper_doi":"10.2139/ssrn.2695429"},{"citation_id":46983,"raw_reference":"Lesley K. McAllister, Regulation by Third-Party Verification, 53 B.C. L. Rev. 1 (2012).","cited_authors":"Lesley K. McAllister","cited_year":"2012","cited_title":"Regulation by Third-Party Verification","cited_venue":"53 B.C. L. Rev. 1","cited_doi":null,"cited_url":"http://lawdigitalcommons.bc.edu/cgi/viewcontent.cgi?article=3182&context=bclr","ref_kind":"journal_article","section":"fn 40","page":null,"context_sentence":"These biases are compelling precisely because they are not the hallmark solely of fraudulent firms but are exhibited commonly by entities with no overt or covert malicious intent to be inaccurate or unfair in their auditing or reporting.\\40\\ --------------------------------------------------------------------------- ---------------------------------------------------------------------------","paper_id":71201,"paper_title":"Regulation by Third-Party Verification","paper_year":2011,"paper_doi":null},{"citation_id":46984,"raw_reference":"Esther Duflo et al., Truth-Telling by Third-Party Auditors and the Response of Polluting Firms: Experimental Evidence From India, 128 Q.J. Econ. 1499, 1499 (2013)","cited_authors":"Esther Duflo et al.","cited_year":"2013","cited_title":"Truth-Telling by Third-Party Auditors and the Response of Polluting Firms: Experimental Evidence From India","cited_venue":"Quarterly Journal of Economics, 128 Q.J. Econ. 1499","cited_doi":"10.3386/w19259","cited_url":"http://qje.oxfordjournals.org/content/128/4/1499.abstract","ref_kind":"journal_article","section":"fn 40","page":null,"context_sentence":"These biases are compelling precisely because they are not the hallmark solely of fraudulent firms but are exhibited commonly by entities with no overt or covert malicious intent to be inaccurate or unfair in their auditing or reporting.\\40\\ --------------------------------------------------------------------------- ---------------------------------------------------------------------------","paper_id":10687,"paper_title":"Truth-telling by Third-party Auditors and the Response of Polluting Firms: Experimental Evidence from India","paper_year":2013,"paper_doi":"10.3386/w19259"},{"citation_id":46985,"raw_reference":"Ball, George and Siemsen, Enno and Shah, Rachna; Inspector Experience and Product Recalls in the Medical Device Industry (June 2, 2014).","cited_authors":"George Ball; Enno Siemsen; Rachna Shah","cited_year":"2014","cited_title":"Inspector Experience and Product Recalls in the Medical Device Industry","cited_venue":"SSRN","cited_doi":"10.2139/ssrn.2445022","cited_url":"http://ssrn.com/abstract=2445022","ref_kind":"working_paper","section":"fn 41","page":null,"context_sentence":"While the research that follows primarily involves government inspectors, EPA believes that the findings correlate to designing effective third-party auditing programs. One such study concerns the relationship of inspector experience and product recalls in the medical device industry.\\41\\ The study's authors explain: ---------------------------------------------------------------------------","paper_id":11201,"paper_title":"Inspector Experience and Product Recalls in the Medical Device Industry","paper_year":2014,"paper_doi":"10.2139/ssrn.2445022"},{"citation_id":46986,"raw_reference":"Abigail Brown, The Economics of Auditor Capture, Edmond J. Safra Center for Ethics, Harvard University (Nov. 8, 2011)","cited_authors":"Abigail Brown","cited_year":"2011","cited_title":"The Economics of Auditor Capture","cited_venue":"Edmond J. Safra Center for Ethics, Harvard University","cited_doi":null,"cited_url":"https://abigailbrown.files.wordpress.com/2009/08/auditor-capture-111108.pdf","ref_kind":"working_paper","section":"fn 42","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":46987,"raw_reference":"Ginger Zhe Jin & Jungmin Lee, A Tale of Repetition: Lessons from Florida Restaurant Inspections, National Bureau of Eco. Research Working Paper No. 20596 (Oct. 2014).","cited_authors":"Ginger Zhe Jin; Jungmin Lee","cited_year":"2014","cited_title":"A Tale of Repetition: Lessons from Florida Restaurant Inspections","cited_venue":"National Bureau of Economic Research Working Paper No. 20596","cited_doi":"10.3386/w20596","cited_url":"http://www.nber.org/papers/w20596","ref_kind":"working_paper","section":"fn 43","page":null,"context_sentence":"These complacency effects ``may outweigh the benefits [such repeat visits have on inspector] learning.'' Another analysis of 426,831 unannounced inspections by state government inspectors from July 2003 through March 2010 found that new inspectors tend to have ``fresher eyes'' in their first visit to a restaurant, reporting 12.7-17.5% more violations than the second visit of a repeat inspector, and that this effect is more pronounced when the previous inspector had a longer relationship with the restaurant.\\43\\ --------------------------------------------------------------------------- ---------------------------------------------------------------------------","paper_id":11203,"paper_title":"A Tale of Repetition: Lessons from Florida Restaurant Inspections","paper_year":2014,"paper_doi":"10.3386/w20596"},{"citation_id":46988,"raw_reference":"Elliott, M.R., Kleindorfer, P.R., and Lowe, R.A., The Role of Hazardousness and Regulatory Practice in the Accidental Release of Chemicals at U.S. Industrial Facilities, Risk Analysis, Vol. 23, No. 5, 2003.","cited_authors":"M.R. Elliott; P.R. Kleindorfer; R.A. Lowe","cited_year":"2003","cited_title":"The Role of Hazardousness and Regulatory Practice in the Accidental Release of Chemicals at U.S. Industrial Facilities","cited_venue":"Risk Analysis, Vol. 23, No. 5","cited_doi":"10.1111/1539-6924.00366","cited_url":null,"ref_kind":"journal_article","section":"fn 72","page":null,"context_sentence":"EPA does not believe normalizing accident rates by FTE or chemical quantity is appropriate because prior research has shown that the interaction between these factors and incident rates is complex, and that none of these variables, by itself, is a suitable proxy for the relative risk of a catastrophic chemical release incident at a facility.\\72\\ Likewise, selecting industry sectors for applicability of the rule's STAA provisions using an approach similar to that used for OSHA personal injury statistics (e.g., OSHA lost workday injury and illness rates) would not identify sectors with higher chemical process risks.","paper_id":11204,"paper_title":"The Role of Hazardousness and Regulatory Practice in the Accidental Release of Chemicals at U.S. Industrial Facilities","paper_year":2003,"paper_doi":"10.1111/1539-6924.00366"},{"citation_id":46989,"raw_reference":"CCPS. 2009. Inherently Safer Chemical Processes: A Life Cycle Approach, 2nd ed., American Institute of Chemical Engineers, CCPS New York, Wiley.","cited_authors":"Center for Chemical Process Safety","cited_year":"2009","cited_title":"Inherently Safer Chemical Processes: A Life Cycle Approach, 2nd ed.","cited_venue":"American Institute of Chemical Engineers, Wiley","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 77","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":46990,"raw_reference":"Barrish, R., Antoff, R., & Brabson, J., Dep't of Natural Resources & Env. Control, Third Party Audit Pilot Project in the State of Delaware, Final Report (June 6, 2000)","cited_authors":"R. Barrish; R. Antoff; J. Brabson","cited_year":"2000","cited_title":"Third Party Audit Pilot Project in the State of Delaware, Final Report","cited_venue":"Delaware Department of Natural Resources & Environmental Control","cited_doi":null,"cited_url":"http://opim.wharton.upenn.edu/risk/library/2000_RAB,RA,JB_3rdPartyAudit_Delaware.pdf","ref_kind":"research_report","section":"fn 39","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}