{"document":{"doc_id":9025,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Federal Highway Administration","doc_type":"Rule","title":"National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program","date":"2017-01-18","url":"https://www.federalregister.gov/documents/2017/01/18/2017-00550/national-performance-management-measures-assessing-pavement-condition-for-the-national-highway","source_native_id":"2017-00550","status":"fetched","abstract":"The purpose of this final rule is to establish measures for State departments of transportation (State DOT) to use to carry out the National Highway Performance Program (NHPP) and to assess the condition of the following: Pavements on the National Highway System (NHS) (excluding the Interstate System), bridges carrying the NHS which includes on- and off-ramps connected to the NHS, and pavements on the Interstate System. The NHPP is a core Federal-aid highway program that provides support for the condition and performance of the NHS and the construction of new facilities on the NHS. The NHPP also ensures that investments of Federal-aid funds in highway construction are directed to support progress toward the achievement of performance targets established in a State's asset management plan for the NHS. This final rule establishes regulations for the new performance aspects of the NHPP that address measures, targets, and reporting. The FHWA is in the process of creating a new public Web site to help communicate the national performance story. The Web site will likely include infographics, tables, charts, and descriptions of the performance data that State DOTs report to FHWA. The FHWA issues this final rule based on sec. 1203 of MAP-21, which identifies national transportation goals and requires the Secretary to promulgate rules to establish performance measures and standards in specified Federal-aid highway program areas.","action":"Final rule."},"dockets":["FHWA-2013-0053"],"rins":["RIN 2125-AF53"],"related":[{"doc_id":11064,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Federal Highway Administration","doc_type":"Proposed Rule","title":"National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program","date":"2015-01-05"},{"doc_id":25969,"source":"ria","org":"FHWA","doc_type":"regulatory_impact_analysis","title":"PM2 Regulatory Impact Analysis FINAL (NPRM)","date":"2015-01-05"},{"doc_id":10971,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Federal Highway Administration","doc_type":"Proposed Rule (administrative)","title":"National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program","date":"2015-02-17"},{"doc_id":25953,"source":"ria","org":"FHWA","doc_type":"economic_analysis","title":"Summary Report Economic Assessment: Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement Program","date":"2016-04-18"},{"doc_id":130305,"source":"docket_item","org":"FHWA","doc_type":"review_record","title":"U.S. DOT/FHWA - Summary of EO12866 Meeting with SELC, ELPC, Transportation for America, EDF, Sierra Club, and NRDC and the Council on Environmental Quality with OIRA (December 7, 2015)","date":"2016-06-02"},{"doc_id":130306,"source":"docket_item","org":"FHWA","doc_type":"review_record","title":"U.S. DOT/FHWA - Summary of EO12866 Meeting with Transportation for America, Center for American Progress, The Leadership Conference on Civil and Human Rights, and the Natural Resources Defense Council with OIRA (October 14, 2015)","date":"2016-06-02"},{"doc_id":25951,"source":"ria","org":"FHWA","doc_type":"regulatory_impact_analysis","title":"PM RIA Consolidated 2017 01 06","date":"2017-01-18"},{"doc_id":25952,"source":"ria","org":"FHWA","doc_type":"regulatory_impact_analysis","title":"PM3 CMAQ Measure States and MPOs for RIA 2016 09 22","date":"2017-01-18"},{"doc_id":129994,"source":"docket_item","org":"FHWA","doc_type":"review_record","title":"PM2 Final Rule 12866 copy showing OMB changes 1.10.16 (redline)","date":"2017-01-18"},{"doc_id":129995,"source":"docket_item","org":"FHWA","doc_type":"review_record","title":"PM 3 Final Rule 12866 version showing OMB edits 1.10.17 (redline)","date":"2017-01-18"},{"doc_id":8933,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Federal Highway Administration","doc_type":"Rule (administrative)","title":"National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program; National Performance Management Measures; Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement Program","date":"2017-02-13"},{"doc_id":8896,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Federal Highway Administration","doc_type":"Rule (administrative)","title":"National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program; National Performance Management Measures; Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement Program","date":"2017-03-21"},{"doc_id":25954,"source":"ria","org":"FHWA","doc_type":"economic_analysis","title":"Summary Report Economic Assessment - Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement Program","date":"2017-07-06"},{"doc_id":25968,"source":"ria","org":"FHWA","doc_type":"regulatory_impact_analysis","title":"PM2 Regulatory Impact Analysis FINAL (Final Rule)","date":"2017-10-25"}],"references":[{"citation_id":41483,"raw_reference":"The Mechanistic-Empirical Pavement Design Guide: A Manual of Practice from AASHTO (2008).","cited_authors":"AASHTO","cited_year":"2008","cited_title":"The Mechanistic-Empirical Pavement Design Guide: A Manual of Practice","cited_venue":"AASHTO","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"fn 91","page":null,"context_sentence":"The MEPDG \\91\\ suggests that the selected parameters are equally important in predicting future pavement conditions.","paper_id":72345,"paper_title":"Mechanistic-Empirical Pavement Design Guide - A Manual of Practice","paper_year":2008,"paper_doi":null},{"citation_id":41484,"raw_reference":"FHWA (2012). Improving FHWA's Ability to Assess Highway Infrastructure Health Pilot Study Report, FHWA-HIF-12-049.","cited_authors":"FHWA","cited_year":"2012","cited_title":"Improving FHWA's Ability to Assess Highway Infrastructure Health Pilot Study Report","cited_venue":"FHWA-HIF-12-049","cited_doi":null,"cited_url":"http://www.fhwa.dot.gov/asset/pubs/hif12049/hif12049.pdf","ref_kind":"research_report","section":"fn 106","page":null,"context_sentence":"An additional recommendation was to define Fair as ``a bridge that is not structurally deficient and also having at least one NBI score of 5.'' The recommendation stated that ``a Good bridge would be defined as a bridge that is not structurally deficient and also having a minimum NBI score of 6.'' As was noted in the NPRM, FHWA performed a study (Improving FHWA's Ability to Assess Highway Infrastructure Health) that evaluated five different methods (four different weighted average methods and one minimum condition rating method) to assign bridge condition based on the classifications of Good, Fair, or Poor.\\106\\ The study concluded that for the Interstate System: (1) Percentages of bridges classified as Good, Fair, or Poor were consistent for all methods with little variation; (2) minimum condition rating method resulted in the highest percentage of bridges in Poor condition; (3) percentages of bridges classified as Good, Fair, or Poor based on the four weighted average methods are not","paper_id":71675,"paper_title":"Improving FHWA’s Ability to Assess Highway Infrastructure Health: Pilot Study Report","paper_year":2012,"paper_doi":null},{"citation_id":41485,"raw_reference":"“Practical Guide for Quality Management of Pavement Condition Data Collection” FHWA-HIF-14-006.","cited_authors":"FHWA","cited_year":"2014","cited_title":"Practical Guide for Quality Management of Pavement Condition Data Collection","cited_venue":"FHWA-HIF-14-006","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 103","page":null,"context_sentence":"Additionally, a recent FHWA study \\103\\ on data quality indicated that most State DOTs have implemented parts of programs to ensure data quality but have not documented or formalized their use in the data collection process.","paper_id":71659,"paper_title":"Practical Guide for Quality Management of Pavement Condition Data Collection","paper_year":2013,"paper_doi":null},{"citation_id":41486,"raw_reference":"Transportation Research Board of the National Academies, National Cooperative Highway Research Program, NCHRP 20-24(37)E, Measuring Performance Among State DOTs, Sharing Best Practices","cited_authors":"Transportation Research Board, National Cooperative Highway Research Program","cited_year":null,"cited_title":"Measuring Performance Among State DOTs, Sharing Best Practices—Comparative Analysis of Bridge Conditions","cited_venue":"NCHRP 20-24(37)E","cited_doi":null,"cited_url":"http://onlinepubs.trb.org/onlinepubs/nchrp/docs/NCHRP20-24(37)E_FR.pdf","ref_kind":"research_report","section":"fn 108","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41487,"raw_reference":"Highway Statistics 2013 Table HM-60.","cited_authors":"FHWA","cited_year":"2013","cited_title":"Highway Statistics 2013 Table HM-60","cited_venue":"FHWA","cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"fn 99","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41488,"raw_reference":"U.S. Department of Transportation, Federal Highway Administration. Report to Congress, National Bridge and Tunnel Inventories Report, Fall 2015","cited_authors":"FHWA","cited_year":"2015","cited_title":"National Bridge and Tunnel Inventories Report","cited_venue":"U.S. Department of Transportation, Federal Highway Administration","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 105","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":41489,"raw_reference":"Sayers, M.W., \"On the Calculation of IRI from Longitudinal Road Profile\", Transportation Research Board 1501, Transportation Research Board, Washington, DC 1995.","cited_authors":"Sayers, M.W.","cited_year":"1995","cited_title":"On the Calculation of IRI from Longitudinal Road Profile","cited_venue":"Transportation Research Board 1501","cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Subpart C, § 490.305 Definitions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":42681,"raw_reference":"\"Evaluation of Pavement Conditions on the Interstate System: Preliminary Summary\", Rada 2015.","cited_authors":"Rada","cited_year":"2015","cited_title":"Evaluation of Pavement Conditions on the Interstate System: Preliminary Summary","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 22","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43617,"raw_reference":"NCHRP Study 401 \"Quality Management of Pavement Condition Data Collection 2009.\"","cited_authors":null,"cited_year":"2009","cited_title":"Quality Management of Pavement Condition Data Collection","cited_venue":"NCHRP Study 401","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 49","page":null,"context_sentence":"The FHWA has found through documented research \\49\\ that nearly all State DOTs currently use more than IRI in their pavement management programs.","paper_id":16702,"paper_title":"Quality Management of Pavement Condition Data Collection","paper_year":2009,"paper_doi":"10.17226/14325"},{"citation_id":43618,"raw_reference":"\"Pavement Management Practices in State Highway Agencies\": Newington, Connecticut Peer Exchange Results. 2011: http://www.fhwa.dot.gov/asset/pubs/hif11036/hif11036.pdf.","cited_authors":null,"cited_year":"2011","cited_title":"Pavement Management Practices in State Highway Agencies","cited_venue":"Federal Highway Administration","cited_doi":null,"cited_url":"http://www.fhwa.dot.gov/asset/pubs/hif11036/hif11036.pdf","ref_kind":"research_report","section":"fn 50","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43619,"raw_reference":"\"Pavement Asset Management\", Uhlmeyer, J., Luhr, D., and Rydholm, T., Washington State Department of Transportation. 2016","cited_authors":"Uhlmeyer, J., Luhr, D., Rydholm, T.","cited_year":"2016","cited_title":"Pavement Asset Management","cited_venue":"Washington State Department of Transportation","cited_doi":null,"cited_url":"https://www.wsdot.wa.gov/NR/rdonlyres/E93CF754-0452-4FDE-92BA-02A7BC4CB98A/0/WSDOTPavementAssetManagement2816.pdf","ref_kind":"research_report","section":"fn 51","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43620,"raw_reference":"\"Performance Measures for Pavement Assets under Performance Based Contracts\", Alyami, Z., Tighe, S., Gransberg, D., 9th International Conference on Managing Pavement Assets, 2014","cited_authors":"Alyami, Z., Tighe, S., Gransberg, D.","cited_year":"2014","cited_title":"Performance Measures for Pavement Assets under Performance Based Contracts","cited_venue":"9th International Conference on Managing Pavement Assets","cited_doi":null,"cited_url":"https://vtechworks.lib.vt.edu/bitstream/handle/10919/56400/ICMPA9-000173.PDF?sequence=2&isAllowed=y","ref_kind":"conference_paper","section":"fn 52","page":null,"context_sentence":null,"paper_id":72337,"paper_title":"Performance Measures for Pavement Assets under Performance Based Contracts","paper_year":2015,"paper_doi":null},{"citation_id":43621,"raw_reference":"\"Performance Measures: Pavement Condition 2015\", Kansas DOT 2015","cited_authors":"Kansas Department of Transportation","cited_year":"2015","cited_title":"Performance Measures: Pavement Condition 2015","cited_venue":"Kansas DOT","cited_doi":null,"cited_url":"https://kdotapp.ksdot.org/perfmeasures/documents/pavement_fact_sheet.pdf","ref_kind":"research_report","section":"fn 53","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43622,"raw_reference":"Evaluation of Pavement Conditions on the Interstate System: Preliminary Summary, Rada 2015.","cited_authors":"Rada","cited_year":"2015","cited_title":"Evaluation of Pavement Conditions on the Interstate System: Preliminary Summary","cited_venue":"FHWA","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Discussion of Section 490.309 Data Requirements, Collecting Data in Both Directions on Interstate Pavements, fn 58","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43623,"raw_reference":"Carey and Irick, Highway Research Bulletin (1960).","cited_authors":"Carey, Irick","cited_year":"1960","cited_title":"Highway Research Bulletin","cited_venue":"Highway Research Board","cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"Processing Data at 0.10 Mile Intervals / Lower Speed Highways, fn 61","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43624,"raw_reference":"Al-Omari and Darter, ULUI-ENG-92-2013 (1992).","cited_authors":"Al-Omari, Darter","cited_year":"1992","cited_title":"Relationships between IRI and PSR","cited_venue":"ULUI-ENG-92-2013","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 63","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43625,"raw_reference":"Mechanistic-Empirical Pavement Design Guide, A Manual of Practice, August 2015, 2nd Edition.","cited_authors":"American Association of State Highway and Transportation Officials","cited_year":"2015","cited_title":"Mechanistic-Empirical Pavement Design Guide, A Manual of Practice","cited_venue":"AASHTO","cited_doi":null,"cited_url":null,"ref_kind":"book","section":"Discussion of Section 490.311 Calculation of Pavement Metrics, fn 72","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43626,"raw_reference":"\"Report of the AASHTO Joint Task Force on Rutting,\" Washington, DC, 1989.","cited_authors":"American Association of State Highway and Transportation Officials","cited_year":"1989","cited_title":"Report of the AASHTO Joint Task Force on Rutting","cited_venue":"AASHTO","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Discussion of Section 490.313, fn 82","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":43627,"raw_reference":"Improving FHWA's Ability to Assess Highway Infrastructure Health FHWA-HIF-13-042.","cited_authors":"Federal Highway Administration","cited_year":"2013","cited_title":"Improving FHWA's Ability to Assess Highway Infrastructure Health","cited_venue":"FHWA-HIF-13-042","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Discussion of Section 490.313, fn 86","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}