SECY-24-0085 Enclosure 3 - Draft Regulatory Analysis-Fusion Machine Proposed Rule
Other documents for the same rulemaking (all, by stage)
References: 9 extracted, 0 linked to papers
ACRS Letter—Draft SECY White Paper on Licensing and Regulating Fusion Energy Systems October 5-7, 2022, Full Committee, October 21, 2022, Agencywide Documents Access and Management System Accession No. ML22290A177.
EIA, U.S. Energy Information Administration, Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860), https://www.eia.gov/electricity/data/eia860m/archive/xls/december_generator2023.xlsx, December 24, 2023.
NUREG/BR-0058, "Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission."
NUREG-1748, "Environmental Review Guidance for Licensing Actions Associated with NMSS Programs."
NUREG-1556, Volume 21, "Consolidated Guidance About Materials Licenses: Program-Specific Guidance About Possession Licenses for Production of Radioactive Material Using an Accelerator."
Draft NUREG-1556, Volume 22, "Consolidated Guidance About Materials Licenses: Program-Specific Guidance About Fusion Machine Licenses."
NUREG-0945 (referenced regarding LLW classification tables).
"Staff Requirements—SECY-23-0001—Options for Licensing and Regulating Fusion Energy Systems." SRM-SECY-23-0001, U.S. Nuclear Regulatory Commission, April 13, 2023, Agencywide Documents Access and Management System Accession No. ML23103A449.
"Staff Requirements—SECY-20-0032—Rulemaking Plan on ‘Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors.'" SRM-SECY-20-0032, U.S. Nuclear Regulatory Commission, October 2, 2020, Agencywide Documents Access and Management System Accession No. ML20276A293.