Policy Replication

Economic Analysis

Regulatory impact analysis2026-01-15 · EPA · economic_analysis · EPA-HQ-OW-2025-2929-0009
RIN 2040-AG47 · Docket EPA-HQ-OW-2025-2929

Other documents for the same rulemaking (all, by stage)

2026-01-15 Federal RegisterUpdating the Water Quality Certification Regulations
2026-01-15 Docket documentDocumentation of E.O. 12866 Review
2026-01-15 Docket documentPrior Federal Register Notices
2026-01-15 Docket documentLegislative History
2026-01-15 Docket documentMeeting Tracker and Outreach
2026-01-15 Docket documentClean Water Act Section 401(a)(2) Federal Agency Notification
2026-01-15 Docket documentTribes Approved for Treatment as a State (TAS) USEPA

References: 2,490 extracted, 505 linked to papers

Page 8Download these results: CSV · JSON
DMR (depth/water data)
web pageNot linked to a paper · MVK-2015-00728-TB (Jeffrey Crossland pier)
CEMVK-EC-DS, 11 February 2016, subject: FC/MR&T, Big Sunflower River Basin, Coahoma and Bolivar Counties, Mississippi, Big Sunflower Sediment Reduction Structures, Phase I, Request for Section 404 Permit, Cultural Evaluation, and Environmental Assessment.
government reportNot linked to a paper · MVK-2016-177 OW13 (fn near top of MVK-2016-177 entry)
CEMVK-EC-DR, 16 February 2016, subject: FC/MR&T, Yazoo River Basin, Coldwater River Watershed, DeSoto County, Mississippi, Delta Headwaters Project, BS-12-01, Request for Section 404 Permit, Cultural Evaluation, and Environmental Assessment (encl 1).
government reportNot linked to a paper · MVK-2016-292 OW1 (fn in that section)
no effect determination email from US Fish and Wildlife Service dated 4 Mar 2016
otherNot linked to a paper · MVK-2016-177 OW13 (COORDINATION paragraph)
Regional Planning and Environmental Division South (RPEDS) archaeologist reconnaissance site visit of the project area on 21 March 2016 (Delta Headwaters Project cultural review).
government reportNot linked to a paper · MVK-2016-292 OW1 (cultural coordination paragraphs)
Hydraulic analysis was completed by ESCA Civil and Structural Engineers for the project.
research reportNot linked to a paper · MVK-2016-00257-CR (Bridge MP 70.60 — sentence noting hydraulic analysis)
Letter of No Objection obtained via coordination with the Tensas Basin Levee District and MVK 408 Office (for work near the levee).
otherNot linked to a paper · MVK-2016-00294-TB (Boardwalk Pipeline Partners, Index-129 Sterlington to Parsons project)
Roseland Refuge Mitigation Bank, MVK-2010-1423 (mitigation bank credits purchase proposed by Plains Pipeline, LP).
government reportNot linked to a paper · MVK-2016-268 (Plains Pipeline Canebrake project; mitigation purchase note)
http://www.wlf.louisiana.gov/sites/default/files/pdf/document/38603-saline/saline_lake_mp-a_2013.pdf
web pageNot linked to a paper · MVK-2016-00511-CR · cited link
Mississippi Department of Transportation./062716/Request for Permit Authorization, CE Project, Project No: STP-0906(4)B: 106704, Starlanding Road, DeSoto County, Mississippi
government reportNot linked to a paper · near top (MVK-2016-00529-AHG)
Mississippi Department of Transportation, Request for Permit Authorization, CE Project, Project No: STP-0906(4)B: 106704, Starlanding Road, DeSoto County, Mississippi
government reportNot linked to a paper · MVK-2016-529 (Lake Cormorant Bayou)
Permit Requirements for Regulated Activities Associated with the BSW 12 Header to Central Plant Pipeline Replacement Project, Located in Section 28, T17S-R16W, Union County, Arkansas
government reportNot linked to a paper · MVK-2016-536 (multiple OW/PEM entries)
Mississippi Department of Transportation/0633016/Request for Permit Authorization, CE Project, Project No: HPP8223-00(004); 104859-801000, Lake Harbour Drive Extension, Madison County, Mississippi
government reportNot linked to a paper · MVK-2016-00531-AHG / MVK-2016-531
Mississippi Department of Transportation/063016/Request for Permit Authorization, CE Project, Project No: STP-0497(8)B: 107061, Ballground Road, Warren County, Mississippi
government reportNot linked to a paper · MVK-2016-00532-AHG / MVK-2016-532
LA-ARK Pateua/070516/Proposed Construction of a Levee System With Associated Water Control Structure(s) for Impounding Water to Attract Waterfowel, Morehouse Parish, Louisiana
government reportNot linked to a paper · MVK-2016-00539-TB / 2016-539-FW
FEMA, Washington Parish Culvert Replacement Project, FEMA Project #0380, S1 Airport Road, Washington Parish, Louisiana
government reportNot linked to a paper · MVK-2016-00555-CR / MVK-2016-555
Record of Environmental Consideration (REC) received from Ms. Chelsea Klein, Environmental Historic Preservation Advisor with FEMA, to evaluate an application for emergency road repairs (FEMA Project ID: PA-04-MS-4268-PW-00138)
government reportNot linked to a paper · MVK-2016-629 (FEMA, Project REC PW 138)
DeSoto Parish Police Jury, Permit Request for Proposed White Springs Road Drainage Project, DeSoto Parish, Louisiana
government reportNot linked to a paper · MVK-2016-00608-CR
DeSoto Parish Police Jury, Permit Request for Proposed Red Bluff Road Drainage Project, DeSoto Parish, Louisiana
government reportNot linked to a paper · MVK-2016-00610
Tennessee Gas Pipeline Company, LLC, Request for Nationwide Permit 12, TGP 100-Cathodic Protection Groundbeds at Red River NSR Project, Utility Line Activities, Natchitoches Parish, Louisiana
government reportNot linked to a paper · MVK-2016-00611-AHG / MVK-2016-611
408 review/RRABB Levee District/071316/ Request for Review of 40 Acres of Foreshore Property at the Saline Revetment, Mile 48, Red River, Avoyelles Parish, Louisiana
government reportNot linked to a paper · MVK-2016-612
Lower Mississippi River Conservation Committee, Coffee Point Dike Field Ecosystem Restoration Project, Tensas Parish, Louisiana
government reportNot linked to a paper · MVK-2016-634
Joint Application Request to Construct a Bulkhead and Pier, Hancock County, Mississippi (Dustin Breland)
government reportNot linked to a paper · MVK-2016-00616-CR / MVK-2016-616
Damage Survey Report (DSR) (submitted with NRCS application for Emergency Watershed Protection projects)
government reportNot linked to a paper · MVK-2016-00639-TB (Calhoun County / NRCS)
L&L Delta Farms, Request for a Preliminary Jurisdictional Determination on Tract 1044 and Tract 1045, Catahoula Parish, Louisiana
government reportNot linked to a paper · MVK-2016-00624-TB
Ledford Engineering, Planning, Architecture/091216/Request for Preliminary Jurisdictional Determination, Property Off of Craft-Goodman Frontage Road, Olive Branch, DeSoto County, Mississippi
research reportNot linked to a paper · top
Ledford Engineering, Planning, Architecture, Request for Preliminary Jurisdictional Determination, Property Off of Craft-Goodman Frontage Road, Olive Branch, DeSoto County, Mississippi
research reportNot linked to a paper · top
David Minninger, Proposed River Crossing for Placement of Stone Steps on Eroding Bank, 49 Riverhouse Road, Montgomery County, Arkansas
research reportNot linked to a paper · MVK-2016-00819-CR
City of McComb, Request for Review of Proposed Northwest Interceptor Renovation Plan, Pike County, Mississippi
research reportNot linked to a paper · MVK-2016-00820-CR
Illinois Central Railroad Company, Proposed Bridge M161.70 Replacement, Holmes County, Mississippi
research reportNot linked to a paper · MVK-2016-00837-TB
AHTD - Hwy. 7 Widening near Lake Hamilton
research reportNot linked to a paper · MVK-2016-00839
City of New Albany, Request for Review of CDBG Proposed Natural Gas Expansion Project, Union and Marshall Counties, Mississippi
research reportNot linked to a paper · MVK-2016-00840-CR
Mississippi Department of Transportation, Request for Permit Authorization, CE Project, Project No: STP/EXB-0504-00(009); 105836-301000, SR 16 (Bridge# 14.4),Sharkey County, Mississippi
research reportNot linked to a paper · MVK-2016-00843-AHG
Caddo Levee District, Proposed Twelve Mile Bayou Bank Erosion Repairs-Cadillac Street Area, Caddo Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00848-TB
Chesapeake Operating LLC, Water Withdrawal Site on the Bayou Pierre, Bayou Pierre Pull Point No. 4 ( Nabors Properties), DeSoto Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00853-TB
BHP Billiton Petroleum's Request to Construct EGP 25 Well Pad and Access Road, Bossier Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00854-CR
CenterPoint Energy, Permit Request for the DL-31 Repair Digs Project, Pulaski County, Arkansas
research reportNot linked to a paper · MVK-2016-00855-CR
Town of Kilmichael, Creek Bank Stabilization Behind Kilmichael Medical Clinic, Montgomery County, Mississippi
research reportNot linked to a paper · MVK-2016-00863-TB
Webster Parish School Board, Proposed Grandstand Replacement at Minden High School, Webster Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00865-TB
City of Batesville, Permit Request for Batesville Bank Stabilization Project, Panola County, Mississippi
research reportNot linked to a paper · MVK-2016-00872-CR
Gulf South Pipeline Company, LP, Proposed Red River HDD Project, Natchitoches Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00873-TB
Rapides Parish Police Jury, Proposed Bayou Darrow Flow Control Structure Dewatering, Rapides Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00875-TB
Midcontinent Express Pipeline, LLC, Pre-Construction Notification for the MEP Delhi 20-inch Lateral Project, Madison Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00882-CR
Brenda Z. Davis, Requesting to Dredge Along Retaining Wall and Out Approximately 200 feet or less in an effort to Maintain Waterfront on Lake Bistineau, Webster Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00907-TB
AHTD-U.S. Highway 70 widening from Hot Springs to Interstate 30
research reportNot linked to a paper · MVK-2016-00927
Natchitoches Parish Port, NWP 3 Request to Replace Riprap Displaced from Flood Waters at Three Sites, Natchitoches Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00982-CR
Indigo Minerals, LLC, Pre-Construction Notification for the Proposed Howard CVH No. 1 and No. 2 Well Site, Access Road and Pipeline Project, DeSoto Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00973
Enterprise Products Operating LLC, Pre-Construction Notification for the Powhatan Pump Station Project, Red River Parish, Louisiana
research reportNot linked to a paper · MVK-2016-00974
TVA, Request for Comment to Draft EA for Proposed Transmission Line to Supply Upgraded Kosciusko Substation, Choctaw, Attala, and Winston Counties, Mississippi
government reportNot linked to a paper · MVK-2016-01032-ACC
USACE Hydrologic Engineering Center River Analysis System (HEC-RAS) version 4.1
otherNot linked to a paper · first paragraph (alternative construction designs)
← PreviousNext →