Policy Replication

Economic Analysis

Regulatory impact analysis2026-01-15 · EPA · economic_analysis · EPA-HQ-OW-2025-2929-0009
RIN 2040-AG47 · Docket EPA-HQ-OW-2025-2929

Other documents for the same rulemaking (all, by stage)

2026-01-15 Federal RegisterUpdating the Water Quality Certification Regulations
2026-01-15 Docket documentDocumentation of E.O. 12866 Review
2026-01-15 Docket documentPrior Federal Register Notices
2026-01-15 Docket documentLegislative History
2026-01-15 Docket documentMeeting Tracker and Outreach
2026-01-15 Docket documentClean Water Act Section 401(a)(2) Federal Agency Notification
2026-01-15 Docket documentTribes Approved for Treatment as a State (TAS) USEPA
2026-01-15 Docket documentICR Supporting Statement
2026-01-15 Docket documentWater Quality Improvement Act, Pub. L. No. 91-224, § 21(b)(1), 84 Stat. 91 (1970)
2026-01-15 Docket documentPrior Regulations
2026-01-15 Docket documentMay 2025 Memorandum on Clarification Regarding Application of Scope
2026-02-19 Docket documentCWA 401 Public Meeting Transcripts Cover Page

References: 2,490 extracted, 505 linked to papers

Page 30Download these results: CSV · JSON
Draft Habitat Mitigation and Monitoring Plan: Littlerock Reservoir Sediment Removal Project (prepared by Aspen Environmental Group, dated April 2017)
research reportNot linked to a paper · fn near SPL-2017-00342-LRS / Littlerock Reservoir Sediment Removal Project
Initial Study/Mitigated Negative Declaration for the ETM Pipeline Removal in San Juan Creek Project.
government reportNot linked to a paper · fn near SPL-2017-00386 San Juan Creek Effluent Transmission Main Removal Project
Addendum No. 1, 2017-2018 Annual Work Plan
government reportNot linked to a paper · fn near SPL-2017-00250 VCWPD 2017-2018 Annual Work Plan - Operations and Maintenance Program
Incident Information System maintained by the U.S. Forest Service
datasetNot linked to a paper · SPL-2017-00629-SLP (Cook Canyon Basin) nearest paragraph mentioning the Mart Fire (fn in project description)
North American Vertical Datum of 1988 (NAVD 88)
datasetNot linked to a paper · SPL-2017-00767-RRS (Bolsa Chica Lowlands Restoration Project) paragraph describing placement elevations (mentions NAVD 88)
the Tres Rios Monitoring and Adaptive Management Plan (MAMP)
research reportNot linked to a paper · fn: SPL-2019-00741 (Tres Rios) (nearest section)
The EcoSPEARS Pilot PCB Removal Project Study
research reportNot linked to a paper · fn: SPL-2019-00593 (ecoSPEARS Pilot Project) (nearest section)
Inland Testing Manual
otherNot linked to a paper · fn: SPL-2019-00589-RRS (Kellogg Beach beach nourishment) (nearest section)
PNNL's LiDAR Buoy Project
research reportNot linked to a paper · fn: end of document (SPL-2019-00955-GLH)
PNNL Buoy deployment, Figure 1 to 5
research reportNot linked to a paper · near start: "PNNL Buoy deployment, Figure 1 to 5" (WindSentinel LiDar buoy description)
RGP 100 Annual Work Plan - FY19-20
government reportNot linked to a paper · under "RGP100 - OCPW Countywide Long-term Routine Maintenance Program"
Natural Community Conservation Plan/Habitat Conservation Plan (NCCP/HCP) (OCTA M2)
government reportNot linked to a paper · in SR-55 Improvement (OCTA M2) entry: "OCTA M2 Natural Community Conservation Plan/Habitat Conservation Plan (NCCP/HCP)"
Mitigation and Monitoring Plan dated December 2019
research reportNot linked to a paper · multiple entries (e.g., Old Creek Bridge Replacement): "Mitigation and Monitoring Plan dated December 2019"
Diversion and Dewatering Plan Lopez Drive Bridge No. 2 Seismic Retrofit Project Over Lopez Lake San Luis Obispo County, California, dated March 2016
research reportNot linked to a paper · Lopez Drive Bridge Seismic Retrofit Project entry: "Diversion and Dewatering Plan ... dated March 2016"
NexSens CB-1250 buoy
web pageNot linked to a paper · San Pedro Mooring and Marine Battery System entry: "NexSens CB-1250 buoy"
Frog Alley at Ranch Restoration Plan
research reportNot linked to a paper · fn near SPN-1998-241430 (Gale Ranch - San Ramon - Dublin)
Russian River Biological Opinion (NMFS 9-28-2008)
government reportNot linked to a paper · SPN-2011-00405 Dry Creek Habitat Enhancement Demonstration Project (mentions "Russian River Biological Opinion (NMFS 9-28-2008)")
Decoto Road Bridge Seismic Retrofit; plans titled 'Decoto Road Bridge Seismic Retrofit' dated May 2, 2013
research reportNot linked to a paper · SPN-2010-00335 Decoto Road bridge seismic retrofit (mentions plans titled 'Decoto Road Bridge Seismic Retrofit' dated May 2, 2013)
USACE File #2010-00392S, Alcatraz Dock Fender Pile Replacement, dated October 2, 2018
government reportNot linked to a paper · SPN-2010-00392 Alcatraz Boat Dock Maintenance Project (references USACE File #2010-00392S, dated October 2, 2018)
Wharves 3 & 4 Fender Replacement Project, Application by the Port of Redwood City, Sheet S-00 through S-10, dated October 31, 2016
research reportNot linked to a paper · SPN-2011-00387 Port of Redwood City (references 'Wharves 3 & 4 Fender Replacement Project... dated October 31, 2016')
USACE File #SPN-2011-00108, Stony Point Road Reconstruction and Widening (Phase 2), dated March 12, 2015, Figures 1 and 2
government reportNot linked to a paper · SPN-2011-00108 Stony Point Road Widening, Phase 2 (references USACE File #SPN-2011-00108 dated March 12, 2015)
34th Americas Cup Host and Venue Agreement
web pageNot linked to a paper · SPN-2011-00057 34th America's Cup (mentions '34th Americas Cup Host and Venue Agreement')
“Proposed Work Plan for the Port of San Francisco Maintenance Program Activities from January 1 through December 31, 2017, pursuant to Regional General Permit (RGP22), Pier 94/96 Storm Drain and Outfall Repair”
government reportNot linked to a paper · SPN-2015-00016 (Port of San Francisco, Regional General Permit for Maintenance)
“fisheries habitat restoration manual produced by the California Department of Fish and Wildlife with approval from NOAA Fisheries”
government reportNot linked to a paper · SPN-2015-00372 (Fisheries Restoration Grant Program 2015)
“USACE File 2015-00133S, Bair Island Marina Seawall Repair, April 26, 2017, Figures 1 to 15.”
government reportNot linked to a paper · SPN-2015-00133 (Bair Island Marina Seawall Repair)
(WRA 2017)
research reportNot linked to a paper · CEMEX Oakland Wharf Removal Project (Brooklyn Basin Tidal Channel) — mention: "(WRA 2017)"
CA Salmonid Stream Habitat Restoration manual
research reportNot linked to a paper · Outlet Creek Bank Stabilization Project — "will follow the CA Salmonid Stream Habitat Restoration manual"
USACE File #2017-00592S, Codornices Creek Restoration at 2249 Glen Avenue, January 31, 2018, Sheets 1 to 9.
government reportNot linked to a paper · Codornices Creek Restoration at 2249 Glen Avenue (fn near SPN-2017-00592)
USACE File #2018-00102S, SAFR Sea Scout Base Alterations to Trestle and Pilings, dated April 22, 2019, and provided as Enclosure 1.
government reportNot linked to a paper · SAFR Sea Scout Base Alterations to Trestle and Pilings (fn near SPN-2018-00102)
USACE File #2018-00269, Newby Island Landfill Coyote Creek Channel Stabilization, consisting of 8 sheets, dated November 14, 2018, and provided as Enclosure 1.
government reportNot linked to a paper · Newby Island Landfill Coyote Creek Channel Stabilization (fn near SPN-2018-00269)
plans and drawings titled “USACE File #2018-00222S, South San Ramon Creek Erosion Repair,” consisting of 3 sheets, dated July 19, 2018
government reportNot linked to a paper · South San Ramon Creek Repair (fn near SPN-2018-00222)
USACE File #2018-00447, Port of San Francisco Seawall Geotechnical Investigation, dated November 5, 2018, consisting of 7 pages,
government reportNot linked to a paper · Port of San Francisco Seawall (fn near SPN-2018-00447)
USACE File #2018-00428, Preventative Maintenance of Two Bridges, Figures 1 to 5, provided as enclosure 1
government reportNot linked to a paper · Maintenance of Five Bridges for City of Pleasanton (fn near SPN-2018-00428)
All work shall be completed in accordance with the plans and drawings titled “USACE File #2018-00396S Pier 39 to Pier 45 Sediment Remediation” (implied in SPN-2018-00396 description).
government reportNot linked to a paper · Pier 39 to Pier 45 Sediment Remediation (fn near SPN-2018-00396)
All work shall be completed in accordance with the plans and drawings titled “USACE File #2018-00269, Newby Island Landfill Coyote Creek Channel Stabilization” (referred to as Enclosure 1).
government reportNot linked to a paper · Newby Island (fn near SPN-2018-00269)
¿Scott River Spawning Gravel Evaluation and Enhancement Plan¿ (Cramer Fish Sciences 2010)
research reportNot linked to a paper · SPN-2019-00350 (French Creek Habitat Enhancement) fn near text referencing Cramer Fish Sciences 2010
Bentrup and Hoag, 1998
research reportNot linked to a paper · SPN-2019-00349 (Moffett Creek Restoration) paragraph referencing bioengineering techniques
Design Basis Report and Engineering Plans prepared by Clearwater Hydrology (September 2019, attached)
research reportNot linked to a paper · SPN-2020-00113 (Vineyard Creek Sewer Line and Bank Stabilization Project)
USACE File #2019-00106S, Newell Creek Access Road Bridge Rehabilitation Project, dated August 14, 2019, consisting of 3 sheets, and provided as Enclosure 1.
government reportNot linked to a paper · SPN-2019-00106 (Newell Creek Access Road Bridge Rehabilitation)
WindSentinel¿ LiDAR wind resource assessment buoys (AXYS Technologies, Inc., Sidney, British Columbia, Canada)
otherNot linked to a paper · SPN-2019-00442 (CA LiDAR Buoy deployment - Humboldt and Morro Bay Locations)
http://www.swg.usace.army.mil/Business-With-Us/Regulatory/Permits/Nationwide-General-Permits/
web pageNot linked to a paper · SWG-1993-01969 (Tabbs Bay) — paragraph referencing NWP verification and providing the URL · cited link
U.S.G.S. quadrangle map titled: Port O¿Connor, Texas
datasetNot linked to a paper · SWG-1991-01714 (Preston Stofer) — description: "The project can be located on the U.S.G.S. quadrangle map titled: Port O¿Connor, Texas."
US Fish and Wildlife Service (USFWS) Biological Opinion, Attachment A
government reportNot linked to a paper · SWG-2000-02888 (Galveston beach nourishment) — referenced in project description
TCEQ stated by letter dated February 10, 2014 that the applicant consented to having a 300 mg/l TSS condition as part of the water quality certification for use of NWP 16
government reportNot linked to a paper · SWG-2000-01605 (Port of Corpus Christi Oil Dock 1) — TCEQ letter dated February 10, 2014
U.S.G.S. Quadrangle map titled: Matagorda, Texas.
datasetNot linked to a paper · SWG-2004-02403 (Port of Bay City Authority...)
USGS maps
datasetNot linked to a paper · SWG-2005-00413 (Entergy Gulf Stat... jurisdictional determination memo)
FEMA Maps
datasetNot linked to a paper · SWG-2005-00413 (jurisdictional determination memo)
Orange County Soil Survey
datasetNot linked to a paper · SWG-2005-00413 (jurisdictional determination memo)
DOQQ 1995 color inferred photographs
datasetNot linked to a paper · SWG-2005-00413 (jurisdictional determination memo)
Atlantic and Gulf States Marine Fisheries Commissions Guidelines for Marine Artificial Reef Materials
research reportNot linked to a paper · SWG-2005-00530 (TPWD Texas Clipper artificial reef)
← PreviousNext →