Fee Schedules; Fee Recovery for Fiscal Year 2025
The U.S. Nuclear Regulatory Commission (NRC) is amending the licensing, inspection, special project, and annual fees charged to its applicants and licensees. These amendments are necessary to comply with the Nuclear Energy Innovation and Modernization Act, which requires the NRC to recover, to the maximum extent practicable, approximately 100 percent of its annual budget, less certain amounts excluded from this fee recovery requirement. In addition, the NRC is making amendments to implement a reduced hourly rate for advanced nuclear reactor applicants and pre-applicants for certain activities as required by the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024.
Original sourceXML (336 KB)PDF (447 KB)
Other documents for the same rulemaking (all, by stage)
References: 11 extracted, 0 linked to papers
NUREG-1100, Volume 39, “Congressional Budget Justification: Fiscal Year 2025” (March 2024) ML23069A000.
FY 2025 Final Rule Work Papers ML25129A153.
OMB Circular A-25, “User Charges” https://www.whitehouse.gov/wp-content/uploads/2017/11/Circular-025.pdf .
SECY-05-0164, “Annual Fee Calculation Method,” dated September 15, 2005 ML052580332.
FY 2025 Regulatory Flexibility Analysis ML25128A308.
FY 2025 U.S. Nuclear Regulatory Commission Small Entity Compliance Guide ML24341A010.
DOE Manifest Information Management System (MIMS).
S. Rep. No. 118-182, at 6 (2024).
H.R. Rep. No. 118-391, pt. 1, at 28 (2024).
OMB Circular A-4 (referenced in footnote 10).
BLS, “May 2024 National Industry-Specific Occupational Employment and Wage Estimates,” (BLS, 2025).