Trichloroethylene; Regulation Under the Toxic Substances Control Act (TSCA); Compliance Date Extension
Federal Register2025-09-17 · ENVIRONMENTAL PROTECTION AGENCY · Rule · 2025-17948
Interim final rule.
The Environmental Protection Agency (EPA or Agency) is taking interim final action on the Regulation of Trichloroethylene (TCE) under the Toxic Substances Control Act (TSCA) to revise certain compliance deadlines finalized in 2024. Specifically, EPA is amending the prohibition compliance date for the use of TCE as a processing aid in the manufacture of nuclear fuel, with corresponding changes to the compliance dates for the manufacturing, processing and distribution in commerce of TCE to support such use, to a prohibition on September 15, 2028. EPA is also amending the prohibition compliance date for the disposal of TCE to wastewater by processors of TCE and processors and industrial and commercial users of TCE as a processing aid, to begin on December 18, 2026. EPA is also amending the compliance deadline for downstream notification, and the text required to be present in Safety Data Sheets, to accurately reflect the new prohibition compliance deadline for TCE used as a processing aid in the manufacture of nuclear fuel. EPA is amending this compliance deadline to allow for 90 days after the publication of the final rule for manufacturers, processors, and distributors in commerce of TCE to make such a change. These revisions are necessary to address new information presented to EPA about inadvertent oversights in the original rulemaking and serious concerns that the facilities at issue will be unable to comply with the relevant requirements by the existing deadlines. EPA is requesting comments on all aspects of this interim final rule and will consider all comments received in determining whether amendments to this rule are appropriate after the conclusion of the comment period.
Original sourceXML (85 KB)PDF (280 KB)
Other documents for the same rulemaking
References: 12 extracted, 0 linked to papers
Page 1Download these results: CSV · JSON
EPA. BWX Technologies Inc Meeting Memo. July 15, 2025.
government reportNot linked to a paper · Ref. 3
EPA. Department of Energy Meeting Memo. July 16, 2025.
government reportNot linked to a paper · Ref. 5
EPA. Nuclear Regulatory Commission Meeting Memo. July 29, 2025.
government reportNot linked to a paper · Ref. 6
EPA. Department of Defense Meeting Memo. August 4, 2025.
government reportNot linked to a paper · Ref. 7
Department of Defense, Office of the Under Secretary of Defense, Research and Engineering. Project Pele Mobile Nuclear Reactor. Accessed July 15, 2025. https://www.cto.mil/pele_eis/.
BWXT. Project Pele Begins Taking Shape with Start of Core Manufacturing. Accessed July 15, 2025. https://www.bwxt.com/project-pele-begins-taking-shape-with-start-of-core-manufacturing/.
Jeff Waksman. Project Pele Overview Mobile Nuclear Power For Future DoD Need, Slides Supporting Presentation Materials for May 2022. Accessed July 15, 2025. https://www.nrc.gov/docs/ML2212/ML22126A059.pdf.
Nuclear Regulatory Commission. BWXT Materials License SNM-0042, Renewed 2007. March 29, 2007. Accessed August 8, 2025. https://www.nrc.gov/docs/ML0813/ML081330687.pdf.
EPA. American Chemistry Council Meeting Memo. July 23, 2025.
government reportNot linked to a paper · Ref. 17
United States Nuclear Regulatory Commission. TRISO-X. Accessed August 8, 2025. https://www.nrc.gov/info-finder/fc/triso-x.html.
United States Nuclear Regulatory Commission. FRAMATOME. Accessed August 8, 2025. https://www.nrc.gov/info-finder/fc/areva-np-lc.html.
EPA. Economic Analysis of the Regulation of Trichloroethylene Under TSCA Section 6(a) Amendment to the 2024 Final Rule—Interim Final Rule. September 10, 2025.
research reportNot linked to a paper · Ref. 24