{"document":{"doc_id":8109,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Plastic Pipe Rule","date":"2018-11-20","url":"https://www.federalregister.gov/documents/2018/11/20/2018-24925/pipeline-safety-plastic-pipe-rule","source_native_id":"2018-24925","status":"fetched","abstract":"PHMSA is amending the Federal Pipeline Safety Regulations that govern the use of plastic piping systems in the transportation of natural and other gas. These amendments are necessary to enhance pipeline safety, adopt innovative technologies and best practices, and respond to petitions from stakeholders. The changes include increasing the design factor of polyethylene pipe; increasing the maximum pressure and diameter for Polyamide-11 pipe and components; allowing the use of Polyamide-12 pipe and components; new standards for risers, more stringent standards for plastic fittings and joints; stronger mechanical fitting requirements; the incorporation by reference of certain new or updated consensus standards for pipe, fittings, and other components; the qualification of procedures and personnel for joining plastic pipe; the installation of plastic pipe; and a number of general provisions.","action":"Final rule."},"dockets":["PHMSA-2014-0098"],"rins":["RIN 2137-AE93"],"related":[{"doc_id":247530,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Arkema Inc. - Petition to Amend","date":"2014-07-10"},{"doc_id":247531,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Evonik-Degussa Corporation and UBE Industries - Amended Joint Petition","date":"2014-07-10"},{"doc_id":243581,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Piping Technology Committee -  Petition","date":"2015-05-07"},{"doc_id":10763,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Plastic Pipe Rule","date":"2015-05-21"},{"doc_id":25846,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Plastic Pipe - Regulatory Impact Analysis and Initial Regulatory Flexibility Act Analysis","date":"2015-05-21"},{"doc_id":242931,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Plastic Pipe - Environmental Assessment","date":"2015-05-21"},{"doc_id":308404,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Palermo Plastics Pipe (P3) Consulting - Letter in Support","date":"2015-06-04"},{"doc_id":312492,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Plastics Pipe Institute - Petition to Extend the Comment Period","date":"2015-06-22"},{"doc_id":308313,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Avista Utilities -  Letter in Support","date":"2015-07-23"},{"doc_id":312366,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"U.S. DOT/PHMSA - Gas Processors Association","date":"2015-10-09"},{"doc_id":25847,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis & Environmental Assessment","date":"2018-11-20"},{"doc_id":310839,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"American Gas Association - Petition for Reconsideration for the Plastic Pipe","date":"2018-12-20"},{"doc_id":305416,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Response to Petition for Reconsideration for the Plastic Pipe Rule","date":"2019-03-07"}],"references":[{"citation_id":35688,"raw_reference":"Gas Technology Institute (GTI; July 16, 2007)","cited_authors":"Gas Technology Institute","cited_year":"2007","cited_title":null,"cited_venue":"Gas Technology Institute","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"II. Background / Design Factor for PE (B)(1)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":35689,"raw_reference":"ANSI/AWWA C901-08, Polyethylene (PE) Pressure Pipe and Tubing, 1/2 in. (13 mm) through 3 in. (76mm), for Water Service (October 1, 2008.)","cited_authors":"American Water Works Association","cited_year":"2008","cited_title":"Polyethylene (PE) Pressure Pipe and Tubing, 1/2 in. (13 mm) through 3 in. (76mm), for Water Service","cited_venue":"AWWA","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"III.B Design Factor for PE","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":35690,"raw_reference":"Meta-Analysis: Cross Bore Practices\" issued by the PHMSA/NAPSR Plastic Pipe Ad Hoc Committee on July 10, 2014.","cited_authors":"PHMSA/NAPSR Plastic Pipe Ad Hoc Committee","cited_year":"2014","cited_title":"Meta-Analysis: Cross Bore Practices","cited_venue":"PHMSA/NAPSR","cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/dimp/docs/MetaAnalysis_Cross_bore_practices_07102014%20final%20R3.pdf","ref_kind":"research_report","section":"III.G.(1)(c) fn 5","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":35691,"raw_reference":"PPI Handbook for PE Pipe, Chapter 7—Underground Installation of PE Pipe","cited_authors":"Plastics Pipe Institute","cited_year":null,"cited_title":"PPI Handbook for PE Pipe, Chapter 7—Underground Installation of PE Pipe","cited_venue":"Plastics Pipe Institute","cited_doi":null,"cited_url":null,"ref_kind":"book_chapter","section":"III.G.(6)(b)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}